Professional Documents
Culture Documents
Upgrade To Umax
Upgrade To Umax
PCFS upgrades
OMC-CS upgrade
HLR upgrade
SSP upgrades
RCP / SMIM upgrades
New features activation
PRBT issues
Acceptance
SSP PCFS
SSP upgrades performed with current S05 (NT) PCFS
Replacement of S05 (NT) PCFS by new S12M.01.00 (XP) PCFS after
SSP upgrade
Ethernet connection to SSP/SSM : replacement of X25 by Ethernet
boards on SMM of SSP
New PCFS allow SSP on line back-up / restore and remote loading of
new release.
Capacity extension
New OMC-CS configuration to be compatible with the extension to 12M
subscribers.
Step 1 : Installation of
ESNM8-1 server (with new
3.3.4.1 software) + Data
restore
Step 4 : Installation of a
2nd ESNM8 server + Data
restore .
Step 5 : Reconfiguration of
HMS2 into a A8920
mediation device.
Step 6 : Swap of
observation flow and
A8920 to ENMS8-1
Step 8 : Reconfiguration
of ENMS4 into HMS4.
Test
Step 9 : Swap of
operators to HMS
Final Configuration
HLR
OSS provisioning
OSS
called
To called sub
PLMN
ACM from Called
Ans from Called V MSC
TC
Connection
SB CRBT ISUP
PSTN
deconnection
G MSC CRBT sound server
connection Clg + Cld subs