Perencanaan Tebal Perkerasan AASHTO

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 16

Perencanaan Tebal

Perkerasan

METODE AASHTO
METODE AASHTO
Rumus umum:

Log Wt18 = 9.36 log (SN+1)-0.20+Gt/(0.40+(1094/(SN+1) 5.19))


+log (1/R) + 0.372(Si-3)

Dimana:
Wt18 = beban lalin selama UR atas dasar beban 18 kips yang
diperhitungkan terhadap faktor regional
Gt = log (4.2-Pt)/(4.2-1.5)
Si = soil support (korelasi CBR) (Bina Marga = DDT)
R = faktor regional (Bina Marga = FR)
SN = structural number (Bina Marga = ITP)
Soil Support
Punya korelasi dengan CBRsubgrade
Gunakan Grafik
CBR skala log
Si skala linear

Soil Support Value (Si)

1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0

1 2 3 4 5 10 50 100 200
California Bearing Ratio (CBR)
Regional Factor
Roadbed material frozen to depth of 0.2 to 1.0
5 (130 mm) or more
Roadbed material dry, summer and fall 0.3 to 1.5
Roadbed material wet, spring thaw 4.0 to 5.0
Percentage of Vehicle
Concentration (C)
100
90
80 Commercial vehicle in left lane
70
60
C (%)

50 Passenger cars in left lane


40
30
Percentage that commercial vehicle were
20 of total traffic both lane
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Total Volume in One Direction-hundreds of vehicle/hour
Structural Layer Coefficients
Contoh:
Perhitungan
EDF
dari data
Loadometer
Contoh:
Perhitungan EDF
dari data Loadometer
Contoh:
Perhitungan
Tebal
Perkerasan
Cara AASHTO
Percentage of Vehicle Concentration (C)

100
90
80
70
60 Commercial vehicle in left lane
C (%)

50
40
30 Passenger cars in left lane
20
10 Percentage that commercial vehicle were
0 of total traffic both lane
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Total Volume in One Direction-hundreds of vehicle/hour

Gambar 1.
Rumus umum:
Log Wt18 = 9.36 log (SN+1)-0.20+Gt/(0.40+(1094/(SN+1)5.19))
+log (1/R) + 0.372(Si-3)

You might also like