Introduction
2
Introduction Cont
The 2005 ASCE Report card states that it would take $ 1.6 trillion
spent over the next five years to repair and rehabilitate the Americas
infrastructure .
In United kingdom, 50% of the total construction expenditure is spent
on repair, rehabilitation and strengthening work.
Deterioration to concrete structures in India too is increasing at an
alarming rate. However exact figure on amount of repairs is not
available.
Delaying repairs usually results in acceleration of the deterioration
that leads to more costly repairs in future
3
Understanding through an Analogy
Environmental factors
Accidental loading
Construction errors
Design Errors
Over loading
Earthquake, Flood,
Tsunami, Fire
Diagnosis Determining Settlement or movement in
the causes of the problem foundations
Chemical attack
Weathering
Inadequate maintenance
Abrasion
Fatigue effects
Corrosion of reinforcement
6
Understanding through an Analogy cont
Preservation
Rehabilitation
Repair
Treatment Restoration
Strengthening
Retrofitting
Demolition
7
Approach - New construction / Retrofitting
8
Road Map
Maintenance
Preparation of after completion
of work
Selection of drawing,
specifications, Bid
repair
and negotiation
Material work and finally
Determination and
execution of work
of methods
Causes of
deterioration
Conditional
Evaluation
9
Seismic Evaluation
Evaluation Criteria
10
Process of Seismic Evaluation
Preliminary Evaluation
Acceptability
criteria satisfied
Yes
No
Detailed Evaluation
No retrofit required
No
Acceptability
criteria satisfied
Yes
Retrofitting
required 11
Seismic Evaluation
Performance Levels
12
Seismic Evaluation
Preliminary Evaluation:
13
Preliminary Evaluation - Site visit
14
8. Location of the masonry infill walls
Preliminary Evaluation cont
15
Detailed Evaluation
Detailed evaluation of the building will be required if any of the following conditions are
met.
The building fails to comply with the requirements of the Preliminary Evaluation.
A building is 6 storeys and higher.
Buildings is located on incompetent or liquefiable soils or located near the active fault
line / or with inadequate foundation details.
Building with inadequate connection between the primary structural members.
16
Procedure for Detailed Evaluation
17