REB 500
Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 1
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 2
ABB
REB500 Commissioning
COMMISSIONING
PROTOCOLS
PLANT
OBJECT/DEVICE
ABB-ORDER NUMBER
COMMISSIONING DATE
COMMISSIONING ENGINEER
CLIENT
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 3
ABB
REB500 Commissioning
Checklist
Visual check for transport damages Checking the signalling circuits / alarms
Checking the auxiliary supply voltage (DC) Set the system time
Secondary injection with test set, type...... Type, No., Test date:
Client
ABB
Date: Signature: Datue: Signature:
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 4
REB500 Commissioning
General specifications
Rated voltage
Type of plant
Software version
Applied diagrams
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 5
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 6
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 7
ABB
REB500 Commissioning
Batt. 1
+ ! +
Batt. 2
+
- - - -
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 8
ABB
REB500 Commissioning
Function Test
Function Tests like Tripping Characteristic , internal Logic's, Timers etc.
are not required
All functional bindings have to be checked in the Reports Print-
Out
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 9
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 10
ABB
REB500 Commissioning
10 %
U sat
Definition of the knee-point UK:
An alteration of the voltage by 10% results in a current 50%
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 11
ABB
REB500 Commissioning
Polarity check
for pre-checking the current circuits as well as for checking the
mounting position
+ P1 +
S1
- P2 S2 -
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 12
ABB
REB500 Commissioning
Primary injection 1.
Protection unit
Checking the c.t. ratio and the
wiring
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 13
ABB
REB500 Commissioning
Protection unit
not recommended
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 14
ABB
REB500 Commissioning
Busbar prot.
30 VA 30 VA Busbar prot.
P1 P2
5P20 5P20
DEAD ZONE !!
P2 30 VA P1 30 VA
5P20 Line prot.
5P20
Line prot.
WRONG
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 15
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 16
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 17
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 18
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 19
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 20
ABB
REB500 Commissioning
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 21
ABB
REB500 Commissioning
Stability check
ABB Automation
ABB Power Automation Ltd / NSB-2 / 2000.01.05 / SJ / Page 22