Professional Documents
Culture Documents
Introduction Indian Ps
Introduction Indian Ps
Introduction Indian Ps
POWER System
RESOURCES
ARE FAR AWAY
HYDRO FROM LOAD
RESOURCES CENTERS.
NECESSITATES
LONG
TRANSMISSION
LINKS FOR
EVACUATION
DELHI
KOLKATTA
MUMBAI
COAL
BELT
BANGALORE CHENNAI
Present Power Scenario
per annum
I.C-39200 All India
SR PD- 26300 Population : 1000
LA
ANDAMA
NICOBA
470MU/D
KS
billion
HA
Demand : 97,000 MW
DW
N
R
EE
Present Scenario
East-North
Sub-Total 4650
East-West
West-North
Sub-Total 2200
17,159
1000 MW East-South
40,280 MW Gazuwaka HVDC back-to-back 1000
West-South
East-North East
14,500 MW Bongaigaon-Siliguri 400kV D/c 800
Sub-Total 1000
Total 14500
TWO ELECTRICAL AREA w.e.f Aug. 2006
NORTHERN
REGION
1 NORTH-
EASTERN
REGION
EASTERN
NEW REGION
TALCHER
WESTERNRE
MAJOR
GION
GRID
INTERCONNECTIONS
HVDC
INTERCONNECTS
2
SOUTHERN
AC REGION
5500 MW 11850 MW
NORTH-
EASTERN
REGION
6050 MW
WESTERN 1200 MW
REGION EASTERN
REGION
1400 MW
6150 MW
SOUTHERN
REGION
36,700 MW OF INTER-
REGIONAL POWER BY 2012
765 kV ring under construction
NR
1 NER
8
7
2 6
3 5
4 ER
WR 1. Agra
2. Gwalior
3. Bina
4. Seoni
SR 5. Sipat
6. North Karanpura
7. Balia
8. Fatehpur
International Connections
Bhutan
Tala HEP (1020 MW) 400 kV
Chukha HEP (336 MW) 220 kV)
Kurichu HEP (60 MW) 132 kV)
(Net import by India)
Nepal
Over 16 links of 132/33/11 KV
Net export to Nepal (about 10% of Nepals
demand)
Future
Interconnection with Sri Lanka (Wind Power)
SAARC Grid ????
9
Modernization of Control Centres
2 Sec
2 Sec
ULDC Commn
Sub LDC C Sub LDC W Sub LDC V
KPTCL ABB
10 Sec
RTU A
RTU A RTU X
RTU C RTU X
KOLAR SPECIAL PROTECTION SCHEME
Source wise composition of
installed capacity in India
(1,34,084 in 2007)
9542 33486
4120 7% Hydro
3% 25%
Thermal
Nuclear
Wind & Others
86936
65%
Sector wise consumption of
electricity in India
6%
5%
Industry
35%
Domestic
Railways
29% Agriculture
Commercial
Others
22%
3%