Khagendra Kumar Dewangan 13119040 Mechanical Engineering (NITRR) BSP Sem. 2014/2015
Khagendra Kumar Dewangan 13119040 Mechanical Engineering (NITRR) BSP Sem. 2014/2015
Khagendra Kumar Dewangan 13119040 Mechanical Engineering (NITRR) BSP Sem. 2014/2015
ON
MECHANICAL DEPARTMENT,
BHILAI STEEL PLANT
Summary:
I had my industrial training in BHILAI STEEL PLANT.
My work was focusing on observation and inspection of two
plants-
3.1 INTRODUCTION :
Brick Shop was commissioned in the year 1985. The main function was to
produce Tar Bonded Dolomite Bricks for converter vessel of Steel Melting Shop No.2.
The production of tar bonded dolomite bricks for converter was stopped in the year 1987
because of poor life and production of Magnesia-Carbon Bricks started in the year 1996.
Some refractory masses were developed in the year 1990.
At present shop is producing following refractory items which
affect cost savings.
S.No. Item/Product Used at
1. Magnesite Mass SMS-II
2. Runner Mass B.F.
3. Twin Hearth sleeve SMS-I
4. Well filler Mass SMS I
5. Magnesia Carbon Bricks SMS-II
In second week
Project Fulfillment:
Importance of Project for plant visit.
Door still open for improvement.
Alternative designs.
Acknowledgements.