GRATING REMOVAL
MAIN HAZARDS ON SITE STRUCTURES AND GRATING REMOVAL 2
Access in erection
area/structure shall
be allowed only to
the involved
workforce
Cordon off the area below -
Protection
to preventof anyone who may
personnel injury
beorbelow the work
anything site.
drop.
7
Prevent Falling objects 7
Containers/buckets
shall be provided for
storing or carrying
bolts and tools and
shall be secured to
prevent falls
24
Prevent Falling objects 8
25
SAFETY FIRST !!!!!! 9
15
Site Structure Safe Condition Establishment and Maintenance 13
SUITABLE ACCESS
RIGID EDGE PROTECTION / HANDRAILS
GRATING SECURED BY CLIPS
PENETRATION ARE COVERED / BARRICATED AND SIGN POSTED
OPENINGS ARE COVERED / BARRICATED AND SIGN POSTED
ANY NOT COMPLETED AREA UNDER ERECTION OR CONSTRUCTION
IS STRONGLY BARRICATED & SIGNS POSTED
ONLY AUTHORISED PERSONNEL BY PERMIT TO WORK CAN WORK IN
BARRICATED AREA UNDER PROPER SUPERVISION AND 100% TIED ON
POLICY APPLYCATION
GRATINGS OR HANDARAILS OPENING IS EXECUTED ONLY UNDER
SPECIFIC PERMIT TO WORK OPERATED BY COMPETENT
PERSONNEL
ANY ALTERATION OR REMOVAL OF ANY OF THE ABOVE WILL CAUSE
CANCELLATION OF THIS TAG AND TERMINATION FROM THE PROJECT
SITE SUPERVISION TO EXECUTE A LAST MINUTE RISK ASSESSMENT
ON THE PLATFORM BEFORE TO ALLOW TO WORK AND HSE STAFF TO
EXECUTE ROUTINE INSPECTION OF SITE STRUCTURE
Safe Structure Certificate - Example 14
Temporary Solutions for Accessibility 15
AREA INCOMPLETED
NO ENTRY
ONLY STEEL STRUCTURE
ERECTORS USING FALLS
PROTECTIONS
Always close
the gate or
replace the
safety chain
when finished.
15
Permanent platform accessibility GREEN Tag 19
Access to site structure working platform still under construction is allowed only
in strictly compliance with the Fall Protection System Safe Work Practice.
Last Minutes Risk Assessment 23
Toolbox meetings
Held by the Subcontractor Line
Supervision also as part of Safe
Execution of Work process for about
5 -10 min.
SWP
Last Minute
The topics are related to the specific task
Specific
Risk ongoing and to the related JHA/SWP and/or
Assessment
JHA Permit to Work. Workers shall be involved in
Toolbox sharing their opinion for a safe site.
Meeting
New information and reccomandation
may arise from the evaluation of the
context around
PTW Bottom up
OPEN HOLE
WITH COVER
REMOVED
GRATING
32
REMIND
A GRATING WEIGHTS MORE THAN
50KG PER SQUARE METER
CANNOT BE REMOVED EASILY
TRAINING OF PERSONNEL
1. Working at Heights
2. Fall Protection
3. Permit to Work
EQUIPMENTS TO BE USED
1. Signs and Barricades
2. Tools
3. PPE
SPECIFIC TASK TRAINING 34
SCAFFOLD SPANNER
WIRE
CUTTER
HOOKS FOR
LIFTING GRATING
TASK TOOLS AND EQUIPMENTS 36
MATERIALS TO BE USED
SIGNS
DANGER
OPEN HOLE
PROTECTION
DO NOT REMOVE
BARRICADES
MINIMUM REQUIREMENT IS SCAFFOLDING PIPES
COVERS
SCAFFOLDING MATERIALS
PLYBOARDS MINIMUM 25 MM
AND CAN WITHSTAND 300 KGS. WEIGHTS
TASK REQUEST 37
WHEN DO WE NEED TO
REMOVE A GRATING
OR
IN
PIPE PENETRATIONS
OBSTRUCTIONS TO PIPE
ERECTION ALONG PERMANENT
HANDRAILS OF PLATFORMS
INSTALLATION OF
PIPE SUPPORT
INSTALLATION OF ELECTRICAL
/INSTRUMENT SUPPORT
OR PEDESTAL
39
HOW WE HAVE TO
REMOVE A GRATING
OR
CREATE AN OPEN HOLE
IN
A FLOOR OR OTHER
STRUCTURES
TRAINED CREW 40
2.PERFORM ALL
PREPARATIONS BEFORE
THE ACTUAL REMOVAL
OF GRATING OR CREATING
AN OPEN HOLE
1. Anchor points for the fall arrest harnesses have been identified
2. Employees have been instructed also by Tool Box Talk to wear and
tied-off the harness to the approved anchor points
3. Warning signs are in place (DANGER OPEN HOLE
PROTECTION DO NOT REMOVE)
4. A trained Hole Watch has been appointed and at the place of work
5. Adequate hard barricades have been securely fixed around the hole
AND barriers and signs underneath the possible drop zone
6. Hole covers available at work area (able to withstand 300kg load).
Must be securely fixed over the hole any time the area is
unattended
7. A drawing of the area has been attached to the permit identifying
the exact location where the grating is to be removed.
8. Area restatement at the end of the work is executed and checked
NOTE: THE ACT OF GRATING REMOVAL STARTS FROM THE
LOOSENING OF GRATING CLIPS
OPEN HOLE / GRATING REMOVAL PERMIT EXAMPLE
__________________________________________________________________________________________
Grating may only be removed when the employees are equipped with fall protection, safeguarding / barricading for the hole is
provided and warning signage is in place.
Safety Harnesses with twin lanyards and shock absorbers Yes / No Anchorage Yes / No
ATTACH AREA PLOT PLAN INDICATING THE EXACT LOCATION WHERE THE GRATING HAS TO BE
REMOVED.
OPEN HOLE / GRATING REMOVAL SAFE WORK PRACTICES
THE
8
MANDATORY REQUIREMENTS
OPEN HOLE / GRATING REMOVAL SAFE WORK PRACTICES 45
Hole watch
Anchor points
2 TRAINED HOLEWATCHER
OPEN HOLE / GRATING REMOVAL SAFE WORK PRACTICES 46
5 WARNING SIGNS
OPEN HOLE / GRATING REMOVAL SAFE WORK PRACTICES 48
7 PLOT PLAN
51
PROCEED
OK
WITH THE ACTUAL REMOVAL OF
GRATING OR CREATE AN OPEN HOLE ON
THE PLATFORM OR OTHER STRUCTURES
OPEN HOLE / GRATING REMOVAL SAFE TASK EXECUTION 52
A
TYEING OF THE GRATING TO BE REMOVED BY ROPE OF
AT LEAST150 MM
OPEN HOLE / GRATING REMOVAL SAFE TASK EXECUTION 53
B
LOOSEN GRATING CLIPS
OPEN HOLE / GRATING REMOVAL SAFE TASK EXECUTION 54
!
OPEN HOLE / GRATING REMOVAL SAFE WORK PRACTICES 57