The Standard For Program Management: PMI Heartland Chapter
The Standard For Program Management: PMI Heartland Chapter
Program Management
2
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Context
• 1969, Project Management Institute forms
– Today, PMI “with more than 200,000 members in over
150 countries, is the world’s foremost advocate for the
project management profession. A vital and forward-
thinking organization, PMI is comprised of 247
chartered chapters …” (www.PMI.org, Mar 4, 2007)
• 1987, A Guide to the Project Management Body
of Knowledge first published
– updated in 1996 and 2004
– now approved as an American National Standard
(ANS) by the American National Standards Institute
(ANSI)
3
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Context (cont’d)
• 2003, Organizational Project Management
Maturity Model published: helps
organizations assess strengths and
weaknesses
• 2006, The Standard for Portfolio
Management published
• 2006, The Standard for Program
Management published
4
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Standard
• Definition: “something considered by an authority
or by general consent as a basis of comparison;
an approved model” The Random House College Dictionary
• For the standards in this discussion, the authority
is PMI.
• These standards are approved models for your
company to use in designing your processes.
– Good: “We based our company’s processes on PMI
standards.”
– Less meaningful: “Our company uses PMI processes.”
5
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Portfolios, Programs, and
Projects
• Program Management, p 9
6
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Project Management
• Definition, project: “A project is a
temporary endeavor undertaken
to create a unique product,
service, or result.” PMBOK® Guide, p 5
8
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Portfolio Management
• Portfolio: “a collection of
components (i.e., projects,
programs, portfolios, and other
work such as maintenance and
ongoing operations) that are
grouped together” Program Management, p 5
• “A portfolio always exists within an organization
and it is comprised of a set of current initiatives.”
Program Management, p 6
10
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Structure (cont’d)
• Chapter 2: Program Life Cycle and
Organization
– Introduces a life cycle model of program
management
– Relates the themes from Chapter 1 to all parts
of the life cycle
– Discusses the phases of the life cycle in more
detail
11
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Structure (cont’d)
• Chapter 3: Program Management
Processes
– Breaks the phases of the model into 36
processes.
• Similar: the PMBOK® Guide breaks project
management into 44 processes.
– Discusses each process in some detail.
• We won’t cover them in this 75 minute period. We
will cover the phases.
12
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Part 2 - Program Life Cycle
Part 3 – Program Processes
• Program Life Cycle
– Program Governance
– Program Benefits
– Program Stakeholder Management
• Program Processes
– Initiating
– Planning
– Executing
– Controlling
– Closing
13
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Program Life Cycle
G = Gating Review
Mandate
3. Establishing a
1. Pre- 4. Deliver 5. Closing
2. Program Program Mgmt &
Program G1 G2 G3 Incremental G4 the G5
Setup Technology
Set up Benefits Program
Infrastructure
Mandate 3. Establishing
1. Pre- a Program 4. Deliver 5. Closing
2. Program
Program G1
Setup
G2 Mgmt & G3 Incremental G4 the G5
Set up Technology Benefits Program
Infrastructure
Mandate
3. Establishing a 4. Deliver
1. Pre- 5. Closing
2. Program Program Mgmt &
Program G1
Setup
G2
Technology
G3 Incremental G4 the G5
Set up Benefits Program
Infrastructure
18
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Program Life Cycle
G = Gating Review
Mandate
3. Establishing a
1. Pre- 4. Deliver 5. Closing
2. Program Program Mgmt &
Program G1 G2 G3 Incremental G4 the G5
Setup Technology
Set up Benefits Program
Infrastructure
Closing Process
Document Lessons Learned
Ensure each project completes all tasks
Establish on-going benefits monitoring
Communicate closure to Steering Committee
19
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Applying Program Management
• Initiating
– Sales Program
• Company A wants to:
– Refocus remote offices processes to be more sales and
marketing driven
– Transfer administrative process to main office
– Reassign remote office staff to focus on sales and marketing
responsibilities
– Resources
• Production
• Business
• Technical
20
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Program Life Cycle
• Program Management, p 9
21
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Applying Program Management
• Scope of Project A
– To administer
• The payment of resources
– In a way that:
• Centralizes administration in the Main Office
• Allow for Remote Office input
• Provides electronic reports and payments
• Utilizes a secure, reliable technology platform
• Leverages opportunities to realize increased administrative efficiency
• Avoids adverse impact on expenses
• Supports audit processing
– So that
• Payment of resources timely and accurately and service levels are maintained.
– As measured by
• Reduction in staff and expenses by $xxx,xxx
22
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Applying Program Management
• Scope of Project B – Eliminate XYZ System
– To
• Eliminate Application System XYZ
– In a way that
• Reduces system redundancies
• Supports processing of data in new technology compliant system
• Aligns with objectives of Projects C and D
– So that
• Maintenance system costs are reduced
– As measured by
• Elimination of system costs
23
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Applying Program Management
• Scope of Project D – Service and Support
– To:
• Maintain viable production systems
– In a way that:
• Supports production online and batch systems
• Resolves outstanding service and maintenance issues
– So that:
• The application system provides on time availability of on-
lines and reporting
– As measured by
• Reduction in number of production support items
• Increased Data Quality
24
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Program Organization
Program Board
Initiating Sponsor
Sustaining Sponsor
IT Vice President
Business Adminstration
Production Vice President
Remote Office Liason
Business
IT
25
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Project Dependencies and Timeline
26
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Risk Management
RISK RESPONSE PLAN AND REGISTER
Project Name/Number: Prepared by: Date:
Project A/ABCDEFG PM 1/PM 2 12/15/2006
Customer/End User Group: Contact Name: Project Type (S/M/L):
Sales Project Directors LARGE
Business Unit: Project Manager: Project Sponsor:
Sales Project Managers Project Sponsor
Overall
Number Risk Event Probability Impact Risk Response Risk Owner
Risk
1 PM/Planning risk – missing tasks, High Medium Medium Risk Buffer PM’s
assumptions, estimates
Knowledgeable resources – Medium Medium Medium Detailed task estimates have PM’s
2 resource constraints could cause increased Executing Phase dates,
a delay in anticipated project we can look for additional skilled
delivery date resources or implement in phases.
At a minimum, we could use small
amount of the SME’s time as a
consultant.
Analysts performing program/ Medium Medium Medium Recruit SME’s to walkthru “vision” PM’s / SME’s
3 project tasks may not be the same with assigned analysts and
analysts that estimated the effort participate in walkthru’s. Draw from
for these tasks. This could result risk buffer, if necessary.
is discrepancies between
estimates and the actual effort.
4 Management and Sponsor Low Low Low Adherence to governance processes PM’s
acceptance of gating processes
27
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Overall Risk Assessment Matrix
Risk Management
Impact
High 6 1 0
Probability Moderate 1 3 0
2 1 3
Low
28
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Project Reporting & Communication
29
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Project Reporting & Communication
30
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Program Change Control
ATTENDEES (name of individual in parenthesis if not in attendance):
Project Directors Sustaining Sponsor Resource Managers Project Managers Change Manager Production Support
Project Project Impl Mar Mar Mar Feb Feb Feb Feb Jan Jan
Stage 16 09 02 23 16 09 02 26 19
Project A Phase 1 CAT Apr 07 Green Green Green Green Green Green Green Green Yellow
Logical/
Project A Phase 2A Aug 07 Yellow Yellow Yellow Yellow Green Green Yellow Yellow Yellow
Physical Dsn
Project A Phase 2B Logical Dsn Oct 07 Red Yellow Purple Purple Purple Purple Purple Purple Purple
Project A Pay Phase 2C Not Started TBD Purple Green
Purple Green
Purple Purple Purple Purple Purple Purple Purple
Project A Phase 3 Not Started TBD Purple Purple Purple Purple Purple Purple Purple Purple Purple
Phys May 07
Project B Phase 1 Dsn/CUT/CAT Red Yellow Yellow Yellow Yellow Yellow Yellow Yellow Yellow
Project B Phase 2 Not Started Aug 07 Purple Purple Purple Purple Purple Purple Purple Purple Purple
Project D – Feb07 Completed Feb 07 Green Green Green Green Green Green
Project D – Apr 07 CAT Apr 07 Green Green Green Green Green Green Green Green Green
Scanning Warranty Jan 07 Green Green Green Green Green Green Green Green Green
Project F CAT Apr 07 Yellow Yellow Yellow Yellow Yellow Yellow Yellow Yellow Yellow
Project C CAT Aug 07 Green Green Green Green Green Green Green Green Green
Accounting On Hold On Hold Blue Blue Blue Blue Blue Blue Blue Blue Blue
Manual Process Execution Jun 07 Green Green Purple Purple Purple Purple Purple Purple Purple
Change Management Execution Ongoing Green Green Green Green Green Green Purple Purple Purple
Project L Completed Feb 07 Green Green Purple Purple Purple
31
*Legend on Next Slide
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Program Change Control
Project/Proj Mgr Status Stage/Cost to Date Project Control Updates
Project A – Phase 1 Green CAT Status
PM 1/PM 2
Issues and Follow-ups: None
33
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Lessons Learned
Lessons Learned
•Project Experience
•Recommended Process Improvements
•Other Recommendations
•Areas of Focus
•Technical Experience
•Schedule Performance
•Cost Performance
•Risk Management
•Team Management
•Tool Performance
•Release Performance 36
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Closing
• Differences between Portfolio vs Program
vs Project Management
• Overview of The Standard for Program
Management
• Defined how a Program is structured
• Suggested ways to apply Program
Management
37
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Q&A
39
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Additional Sources for Information
A Comprehensive Technology Portfolio Management Process (Borland)
http://www.borland.com/resources/en/pdf/white_papers/technology_portfolio_
management.pdf
A Concise Guide to Program Management: Fundamental Concepts and
Issues
by Mitchell Springer
Program Management for Corporate Information Technology Leaders
by John W., Ph.D. Rittinghouse and Bill Hancock
Programme
Management Demystified: Managing multiple projects successfully by
Geoff Reiss
The Program Management Office: Establishing, Managing And Growing
the Value of a PMO by Craig J. Letavec
Enterprise Programme Management: Delivering Value by David Williams
and Tim Parr
Program Management for Improved Business Results by Dragan Z.
Milosevic, Russ Martinelli, and James M. Waddell
U.S. Military Program Management: Lessons Learned and Best
Practices by Gregory A. Garrett and Rene G. Rendon
Middle Managers in Program and Portfolio Management by Tomas
40
Blomquist and Ralf Muller
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Additional Sources (cont’d)
• Internet
– Project Management Institute: www.pmi.org
– Heartland Chapter: www.pmiheartland.org
• All PMI standards are available at many
sources, including: www.pmibookstore.org
41
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Presenter
• Garry Flemings, PMP
– Technical Consultant,
ASC Information Technology
– IT project management since 1992, in both
government and industry
– PMP, 1998
– President, PMI Heartland Chapter, 2005
– email: garry.pmi@cox.net
42
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Presenter
• Lorraine Henry, PMP
– Information Services Project Manager,
Mutual of Omaha
– PMP in 1999
– President, PMI Heartland Chapter, 2004
– email: lorraine.henry@mutualofomaha.com
43
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Presenter
• Renee Wickes, PMP
– Program Manager,
Hewlett-Packard Company
– MBA, 1996
– PMP, 2002
– President, PMI Heartland Chapter, 2007
– email: renee.wickes@hp.com
44
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
This Session
• You’ll know the relationship of The Standard for
Program Management to the better known A
Guide to the Project Management Body of
Knowledge (PMBOK® Guide).
• You’ll know the structure of The Standard for
Program Management.
• You’ll have considered some ways to apply The
Standard for Program Management to Heartland
companies.
45
© Copyright 2007 by Garry Flemings, Lorraine Henry, and Renee Wickes
Sources of Information
The Standard for Program
Management © 2006 Project
Management Institute, Inc.
– Chapter 2 – Program Life Cycle and
Organization page 17 – 28
– Appendix E – Benefits Assurance and
Sustainment pages 87 – 89
46