GROUP 5

POWER PLANT IN
POOLINEMA
Aldo Oktanara
Nurul Azfi
Putri Afriana
Yonanda Umara
ISSUE BACKGROUND
As an educational institution polytechnic of malang should have
power plants if blackouts by PLN. but in reality is different, then we
find out the truth and the response from students about power
plants in Polytechnic of Malang.
250 KVA 225 KVA
550V
When the power supply from PLN turn on , so MCB
for genset will automatically turn off and operator
must turn on MCB control to each building in a
separate panel
FILTER ON GENERATOR

Genset located in Polinema has existed since 2007. To keep


genset functioning it well and have a long live ,than do
preventive maintenance in once a week , usually on Monday
morning
Treatment is often done is heating
mechine , check Accu water and
check the fuel filter and water , all
should be noted
When turn on or perform preventive maintenance should be
using safety device such as earplug and dry footwear and are
usually allowed to operate the mechine only peoples who really
know about electricity
Hasil Survei
120%

100%

80%

60%

40%

20%

0%
1 2 3 4 5 6 7 8 9 10

iya tidak Ragu - ragu