Professional Documents
Culture Documents
Oracle R12 Upgrade
Oracle R12 Upgrade
SROAUG
March 17, 2010
Manoj Machiwal
Consulting Manager
Agenda
1. Why Upgrade
2. Challenges
3. Upgrade Planning Methodologies 4.
Planning: Important Considerations 5.
Customer Case Study
6. R12 Upgrade Checklist
7. About USJade
8. Q&A
Pull:
• Features; Products, Retire Customizations
Push:
• Older versions of applications not
supported by Oracle
ROI
• New capabilities of R12
Business IT imperative
imperative for data
for better integrity,
decisions, standards,
lower costs lower costs
and quicker and quicker
results results
Traditional
Planning
Execution
Validation
Accelerated
Enablers 0 5 10 15
1. Plan
2. Create safety-net for narrow upgrade
window
3. ?
Results:
• Reduced downtime: business and user
• Reduced business interruption • ROI
realized much faster
• How
• Feasibility study 2 weeks
• 5 Possible Scenarios…
#3 Phased
#1 Technology #2 Full Functional #4 Re-
Functional
Upgrade Upgrade Implementation
Upgrade
Page 14
R12 Upgrade Case Study
Industry: Industrial Manufacturing
Revenue: $500M
Pre-Upgrade Post-Upgrade
• Oracle c.11i - 11.5.3 • Oracle v. R12.0.1
• Oracle Financials (AP, • Oracle Financials (AP,
AR, GL, WIP)., OSFM, AR, GL, WIP)., OSFM,
Inventory, WIP Inventory, WIP
• Platform: • Platform: Oracle
Sun Solaris 5.8 Enterprise Linux 4
• RBBMS 8.1.7.3 • RBBMS 10.2.0.4
Page 15
Customer’s Challenges
Phase 1
• Technology Upgrade •
Key Business Process
• Limited Customization Retirement
Phase 2
• Business Process Reengineering
• New Business Processes
• Complete Customization Retirement
On-Site Offshore
• Planning • Prototyping
Boston, MA China
• Assessment Tel Aviv, Israel • Proof of Concept
• Strategy • Development
San Jose, CA
• Architecture Pune, India • Testing
• Requirements • Conversion
• Design • Maintenance/
• Pilots Enhancement
• Training • Support
Page 26
© 2010 USJade Corp- Proprietary and Confidential . www.usjadecorp.com
Some of Our Customers
http://www.usjadecorp.com
Page 28
Page 29