STORAGE PROJECT
GUIDELINES
AP IR DR ZAINAL ZAKARIA
SECTION DESCRIPTION JUSTIFICATION GUIDELINE
1 Approval Requirements The necessary requirements for LPG Legislation:
for LPG and NG and NG systems as set by the Energy
- Gas Act 1993, Gas Regulation
reticulation system Commission, The Department of
1997, FMD Act 19967, Bomba,
2
Occupational Safety and Health
Local Authority etc
(DOSH), Jabatan Bomba dan
Penyelamat and other appropriate Certificate:
authority body. This shall include brief - PMT , ATI, ATO, PTI, PTO, etc
procedures to obtain approval for the
piping materials (external and internal Form:
pipes), equipments, fittings and -JKKP(BP)1 (Welding of pipe)
pressure vessel
- JKJ 127 (pressure test)
- JG8 (ATI)
2 Code of Practices List out the necessary code of Malaysia Standard &
practices involve in the project which International Standard
respect the scope of works.
-Pipeline
- Storage
- Pipe jointing
8 Network Analysis for Pipe Determine the appropriate gas distribution - At least one loop should be
Design pipe size based on the demand and the considered
length of the piping to be installed. You are
- Only one supply source
free to apply the gas flow equation, which
you thing appropriate. Clearly state your - Identify the right equation which
assumption and carryout the network based on the supply pressure
analysis for the distribution system to check
for a balance system. Draw the balance - Determine the flow of every pipe and
network which must indicate the final flow node
direction. The flow rate and the pressure - Determine the pressure level of every
drop each section of the piping system node
- Above ceiling
- Emergency
- Inspection
11 External Piping Installation Describe the method of installation for external - Trenching
piping with emphasis on pipe trenching, road
- Road crossing
crossing, corrosion protection, pipe route
marker and trace wires. Please consider, for - Utility crossing
both the LPG and NG systems. Explain the sort
of inspection and quality control scheme - Marker
required to ensure pipeline integrity during the
- Trace wire
construction
- Emergency
- Inspection
- Calibration of meter
6
13 Tank and Pipeline Integrity Describe the method of pressure test - Hydrostatic test
method need to be carried out for tank
- Pneumatic test
and piping. You may required to show
the calculation related to the test. - Purging
Prepare the stress analysis on the tank
- Perform stress analysis as
and pipeline
suggested by the code
14 Project Schedule Plan for the schedule for the project to - List out the detail schedule of the
be undertaken project on Gantt Chart
15 Operation, Maintenance Prepare a brief write up on operation, - Leak survey schedule
and Emergency Procedures maintenance and emergency procedures
- Emergency procedure
which give emphasis on smooth running
of the system, at the same time provide - Leak
adequate safety customer and public at
- Fire
large
- Method of Statement
15/11/2017