Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 16

Full IP Design

Full IP Design Steps:


1. Set the transmission mode to be Iub IP.

2. Mark on the 2nd


port in Ethernet 2
interfaces.
Full IP Design Steps:
3. Set the QOS parameters as below table.
Full IP Design Steps:
4. Set transport Ethernet Interface parameters :
• BW = 1000 Mbits/s
• Traffic shaping type : off
Full IP Design Steps:
5. Create 3 new VLANs for :
• Data
• Voice & signaling
• Management.

Using the data provided in the CWO:


VLAN ID, IP Address, Committed information rate.

Target
Site Name Vlan ID Traffic Type IP Address Subnet Mask Default Gateway
RNC
10 Data (UP2) 10 199 26 21 255.255.255.224 10 199 26 1

11 Voice (UP1) &Signaling 10 199 90 21 255.255.255.224 10 199 90 1


QL-ARB-ULYQAT RNC 36
12 Management (MP) 10 198 218 21 255.255.255.224 10 198 218 1

N/A MP O&M Device IP 10 238 175 88 255.255.255.248 N/A

Voice Committed BW Voice & Signaling Route Default Signaling BW Committed BW Route BW Management BW
Site Code Site Name
(Mbps) BW (Mbps) (Mbps) (Mbps) (Mbps) (Mbps)
3735DE QL-ARB-ULYQAT 4 5 1 5 7.2 0.5
Full IP Design Steps:
1. Data VLAN creation :
• Create new VLAN and submit the data as in CWO
• VLAN ID = 10
• IP address = 10.199.26.21
• Committed information rate = 5 Mbit/s.

• You must mark on


Enable QOS option.
Full IP Design Steps:
2. Voice & Signaling VLAN creation :
• Create new VLAN and submit the data as in CWO
• VLAN ID = 11
• IP address = 10.199.90.21
• Committed information rate = 4 Mbit/s.

• You must mark on


Enable QOS option.
Full IP Design Steps:
3. Management VLAN creation :
• Create new VLAN and submit the data as in CWO
• VLAN ID = 12
• IP address = 10.198.218.21
• Committed information rate = 0.5 Mbit/s.

• NO Enable QOS.
Full IP Design Steps:
6. Create 2 BFD sessions for Data and Voice & signaling.
For Data BFD:
• Click on BFD sessions, then New BFD.
• Mark on BFD session in use.
• Set the destination address = IP of VLAN 10 of the target RNC ( Given data for each RNC )
Full IP Design Steps:
For Voice & Signaling BFD:
• New BFD.
• Mark on BFD session in use.
• Set the destination address = IP of VLAN 20 of the target RNC ( Given data for each RNC )
Full IP Design Steps:
7. IUP IP data : Setting the SCTP port and subnet
given in the CWO. RNC SCTP Subnet (ICSU)
1. Set the SCTP subnet. RNC36 10.198.4.64 /26
2. Set the Minimum SCTP port.
Site Name Site Code RNC SCTP Port
QL-ARB-ULYQAT 3735DE RNC36 49156

1
2
Full IP Design Steps:
8. Application Addresses:
• User plane 1 : Voice & Signaling VLAN IP.
• User plane 2 : Data VLAN IP
• Control plane : Voice & Signaling VLAN IP.
• Management plane : TRS IP from CWO.
Full IP Design Steps:
9. BTS Routing : Define the static routes.
1. Data Static route:
• Destination : VLAN 10 Subnet of Target RNC.
• Netmask : 255.255.255.248 / Bits= 29
• Gateway : Date VLAN gateway IP in the CWO.
2. Voice Static route:
• Destination : VLAN 20 Subnet of Target RNC.
• Netmask : 255.255.255.248 / Bits= 29
• Gateway : Voice VLAN gateway IP in the CWO.
3. Signaling Static route:
• Destination : SCTP Subnet (ICSU)of Target RNC.
• Netmask : 255.255.255.192 / Bits= 26
• Gateway : Voice VLAN gateway IP in the CWO.
4. Management Static route:
• Destination : 0.0.0.0
• Netmask : 0.0.0.0
• Gateway : Management VLAN gateway IP in the CWO.

You might also like