ABOUT NTPC
• NTPC has installed capacity of 29,394 MW.
• 15 coal based power stations (23,395 MW)
• 7 gas based power stations (3,955 MW)
• 4 power stations in Joint Ventures (1,794 MW).
• The company has power generating facilities in all major
regions of the country.
• NTPC, was setup in 1975 world’s largest .
• In Forbes list of World’s 2000 Largest Companies for the
year 2007, NTPC occupies 411th place.
NTPC BADARPUR PLANT DETAILS
• First Unit Commissioned 1973 (95MW)
• Installed Capacity 720 MW
• Derated Capacity 705 MW
• Coal Source Jharia Coal Fields
• Water Source Agra Canal
• Unit Sizes 3X95 MW ,2X210MW
• Transfer of BTPS 01.06.2006 through
to NTPC GOI’s Gazette Notification
OPERATION
CONTROL AND INSTRUMENTATION
LAB
• MANOMETRY LAB
• PYROMETRY LAB
• AUTOMATIC CONTROL SYSTEMS LAB
• PROTECTION & INTERLOCKING LAB
• FURNACE SAFEGAURD SUPERVISORY SYSTEM
LAB
MANOMETRY LAB
• This Lab. Consists of :
• Sensor
• Indicator
• Scale/Recorder
Bourdon Tube
Manometer
• It is a pressure
measuring instrument,
usually limited to measuring
pressures near to
atmospheric.
• Thermocouple