• D-S GAP • WORLD BANK PRESSURE • GRID FAILURES • IMPACT ON GDP • INVESTMENT CLIMATE • LIBERALISATION AND GLOBALISATION GRID FAILURE NORTHERN GRID FEATURES • LOW FREQUENCY DURING EVENING PEAK-ALL SEASONS • LOW FREQUENCY DURING MORNING PEAK DURING WINTER • HIGH FREQUENCY DURING MONSOON MONTHS • 32(40) 200/210/250 MW UNITS AND 6(10) 500 MW UNITS- RELUCTANCE TO FGMO • 35 % AGRICULTURE LOAD-LOW P.F., POOR MVAR SUPPORT • IMMEDIATE CONDITIONS-LOW DEMAND DUE TO RAINS • PUNJAB AND HARAYANA – SOME THERMAL UNITS SHUT • 400 KV LINE TRIPPINGS • DELAY IN BACKING DOWN UNDER HIGH FREQUENCY • EAST – WEST CORRIDOR FLOW DISTURBED • REGIONS OF LOW FREQUENCY AND HIGH FREQUENCY POLES-SEPARATION OF EAST AND WEST FUNDS NEEDED • EACH MW GENERATION AND EVACUATION NEEDS 4.5Cr. + 4.5 Cr. • 8-9Cr. PER MW INVESTMENT • GAP OF 1,00,000 LAC MW BY 2012 NEEDS 9,00,000 LAC Cr. • PRIVATE SECTOR WAS RELUCTANT DUE TO POWER SECTOR STRUCTURE CENTER-STATE • ELECTRICITY - CONCURRENT SUBJECT LIST • CENTRAL RESOURCES SHARING- GADGIL FORMULA • BENEFICIARIES TO NEW PROJECTS • COAL LINKAGE • EVACUATION THE PRESENT STATUS • GENERATION INSTALLED CAPACITY GROWTH RATE • GDP GROWTH RATE-:ELECTRICITY GDP ELASTICITY • TRANSMISSION EXPANSION-221000 CKM • INTER-REGIONAL TRANSMISSION CAPACITY-21000 MW • DISTRIBUTION STATE-LOSSES, METERING • DEMAND SUPPLY GAP ENERGY-11% POWER-12% • ACS-436.09 P/KWH • AVERAGE TARIFF-328.77P/KWH • ACS-AVG.TARIFF-107.32 P/KWH • OUTLAY-554700 Cr. FOR 11TH PLAN PER CAPITA CONSUMPTION GROWTH CURRENT DATA
• Energy requirement during the year 2008–09 was
774,324 million units (MU), while energy availability was 689,021 MU.
• As a result, an energy shortage of 11 per cent was
recorded, as compared to 9.9 per cent in 2007–08.
• The peak demand for energy during 2008–09 was
109,809 MW, while peak demand met was 96,685 MW.
• The consequent peak shortage was 12 per cent, as