Inspection of Testing Laboratory

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 10

General Laboratory

Instruction:
Inspection of
Testing Laboratory
By: Acaso , Kent John M.
Qualification of Material Testing Laboratory
 Satisfy Recommended Requirements for Independent Laboratory
Qualifications.
 Satisfy basic requirements of ASTM B-329 .
Submit copy : report of inspection of facilities .
Testing Equipment:
Calibrate at maximum 12- month traceable either:
•National Bureau of Standards.
•Accepted values of natural physical constants.
Submit a copy of certificate of calibration.

2 July 22, 2012 Footer text here


3 July 22, 2012 Footer text here
 Laboratory Duties:

Cooperate with Project Manager and Contractor.

Perform specified inspections, sampling and testing of materials :


•Comply with specified standards.
•Ascertain compliance with requirements of Contract Documents.

Notify Project Manager and Contractor of irregularities.

Submit copies of reports of inspections including:

4 July 22, 2012 Footer text here


• date issued;

• project title and number;

• laboratory name and address;

• name and signature of inspector;

• date of inspection or sampling;

• record of temperature and weather;

• date of test;

5 July 22, 2012 Footer text here


• identification of product and specification section.

•location of project;

• type of inspection or test;

•observation s regarding compliance with Contract Documents.

 Stamp fabricated items.

6 July 22, 2012 Footer text here


Quality Control

 The laboratory is not authorized to:

•Release, revoke, alter, or enlarge on requirements of Contract


Documents.

• Approve or accept any portion of work;

•Perform any duties of the Contractor.

7 July 22, 2012 Footer text here


Contractor's Responsibilities to Testing Laboratory.

 Cooperate with Laboratory personnel, provide access to work.

 Provide laboratory with preliminary representative samples.

 Furnish copies of mill test reports are required;

 Furnish labor and facilities which required to;

• Provide access to work to be tested;


• Obtain and handle samples at the site;

8 July 22, 2012 Footer text here


 Contractor shall secure approval from Project Manager:

•Facilitate inspections and tests;


•Provide space for storage and curing.

 Notify laboratory sufficiently in advance.

Repair and Protection

 Repair and protection is the Contractor's responsibility

9 July 22, 2012 Footer text here


Source of Material

 Project Manager shall be notified of resources .

 Contractor shall furnish Certificates of Compliance.

10 July 22, 2012 Footer text here