3G process flow

True Move Co., Ltd.


Present by : Chayanon Chinapak
2
together
we can make
it true
MS10/Nominal Plan – MS20

Site Evaluation
Check Existing site
MS10 MS20
Document Leased
SAM Issued Site Options
Agreement/Owner if
Approved
additional 3G equipment
Regional Snr. RF Planner can be installed
Regional Snr. RF Planner
Regional SAQ
Regional SAQ
Regional Snr. Imp
OR Regional Snr. RF Planner

Nominal Plan

Wireless Access
Network Engineering
(WANE)
3
together
we can make
it true
MS20 – MS30
A16 Pass
MS20 MS30
Produce IEA Design WO issued to D&C Perform Technical site
SIte Options Approved TSS Complete
Contractor Survey
Regional Snr. RF
Regional Snr. RF Planner Regional Snr. Imp
Regional Snr. Imp
Planner Regional SAQ
Regional manager
RF Regional Regional RF Engineer
Area Manager
Regional Transmission
Regional C&I
D&C Contractor
Not Pass Withdraw
Site Owner Not Pass MS20/WANE to
approved for select another site
3G expansion
Area Manager
Regional SAQ
Pass
A29
Site Owner approved for 3G
Expansion
Regional SAQ

check with Nominal Tx Plan A20 LLFC not OK Other Tx Solution/or


for Tx type and required 3G LL Fiber
LLFC Submitted for withdraw MS20
capacity Approval
Reg. Tx Engineer generate
Central TNP Support LLFC OK Central Transmission
LLFC to central support
Regional Snr. Tx Planner then Central Tx support
send LLFC to LL Provider

MW Regional Snr. Tx Planner

MS50 Network link


Planned
A17 MW Capacity survey
NOT OK N Y The Network link has been
Plan for Imp MW upgrade Existing MW can handle
defined and approval
planed 3G capacity?
agreement obtained from
Regional Snr. Tx Planner Regional Snr. Tx Planner LL provider

Other Tx Solution/or Regional Snr. Tx Planner


OK
withdraw MS20

Central Transmission A48 Build Pack Submitted


Regional Tx Engineer has
dispatched the build pack to
Tx central support
4
together
we can make
it true
MS30 – MS60
A25
A21
MS30 A23 TSSR Completed
Produce TSSR Notify Contractor to
TSS Complete Receive GA Drawing The TSSR & GA drawing completed following
Update GA Drawing
the input of all parities present at TSS
Regional Snr. Imp D&C Contractor Regional Snr. Imp Regional Snr. Imp Regional Snr. Imp

MS60
Receive TSSR for Lease contract
Engineering signed
Acknowledgement Regional Snr. SAQ

WANE A37 A39 A40 SER Complete


Notify contractor to DD Receive DD The SER is complete
drawing drawing issued to TrueMove

Regional Snr. Imp Regional Snr. Imp Regional Snr. Imp


Check if
A40,MS40,MS50
completed and get
A19
lease contract signed
Receive TSSR
Regional Snr. SAQ
Regional Snr. Imp

Lease Amendment
A29 resuired MS40 Site Approved
A30
Site Owner approved (Including financial
Submit SAAF
for 3G expansion details for site rental)

Regional Snr. SAQ Regional Snr. SAQ


Regional Manager RNO Director
Lease Amendment
NOT
Required

Link to:
A41
5
together
we can make
it true
MS60 – MS90

MS80
Site ready to Build

Regional Snr. Imp.


MS70 BP APPLICATION
BP
SUBMITTED (if required)
Build permit A41 A44
MS60 The BP document is
Construction WO issued to Build Permit Received
Leased contract Signed prepared, reviewed,signed
D&C contractor (if required)
and submitted to relevant
Regional Snr. SAQ authority by D&C contractor A50 Site Kick Off
Regional Snr. Imp. Regional Snr. Imp.
MEETING(if needed)
Regional Manger Regional Snr. Imp. The SKOM is held on
Areal Manger site.The site is now in the
site preparation stage and
the BOQ is finalised on site
including internal wiring
survey

A47 Regional Snr. Imp.


Apply for LL from D&C Contractor
relevant Provider
Regional SAQ
(if swap from existing
LL MW)
Tx Central Support

A49
MW MW or other Tx Equip.
order ( if upgrade is
required )
Tx Central Support MS90
Issue FEA and Construction
NodeB Equipment call off Started on site
to site

Regional Snr. Imp Regional Snr. Imp.


Regional Snr RF Planner
6
together
we can make
it true
MS90 – A58 – MS100
Link to
A62&A97

MS100
Radio
A55 PEA/MEA equipment
A58 Site ready
Installation delivered to Site
for Installation
Completed
All site
MEA/PEA has
preparation
A51 complete the A96 Node B vendor
MS90 finished and MS100
Issue Site additioncal Pre-Installation
Construction ready for MS105
Pack to Node electrical supply Site Meeting
Started on Site equipment Completed
B vender (if needed) to the PISM
installation.All
Regional Snr. imp Regional Snr. imp site,power is
safety Node B Vendor MS105
connected,commi
certification Transmission
ssioned and
received. Equipment
switched on
Regional Snr. imp Delivered to Site
Regional Snr. imp
Tx vendor

Document Pass Link to:A61


(trigger for
A61)

Correct the CW Document for


document and Document MS95 is received
resubmit reject and check
D&C contractor Regional Snr. Imp.

A66 CWS Site Document


Completed A69 Minor Deficiency
MS95 Civil Works Link to
CW related document items cleared
Inspection completed MS130,site
completed,submitted and All civil work deficiency
Regional Snr.Imp. accept inspection
review documentation items including NSA have
the site completed
deemds to be sufficiency to been cleared/no deficiency
carry out the inspection
Regional Snr. Imp. Regional Snr. Imp. Regional Snr. Imp.
7
together
we can make
it true
2G Performance Verification
A116
MS110 Check 2G performance(Site I+C Completed
MS100, MS105,
Radio Installation and Stat.)of existing site after if MS110 and A64
A96 completed
commissioning Completed 3G implementated on site completed
(3 calendar days)
Node B Vendor
Regional RF

A115
MWI / C Completed

Tx Vendor

MS120
A62 Internal Wiring Works
Transmission Installation
Completed
and commissioning
The D&C cotractor has
completed.
completed the installation
Consider Node B to RNC
IW for LL
(A End to B End)
Tx Vendor Regional Snr.Tx. Planner

Link to :A58,
SIte ready for
Installation

A97
Tx-circuit work order
assigned to FOP

Regional Snr.Tx. Planner


8
together
we can make
it true
A70 – MS180 (Acceptance)
Link
from
:A69

A161
A129
Correct the document and Inventory
MS130 Site Inspection
Link from :A58, resubmit data input in
Documentation Completed
SIte ready for NetOne
Regional Snr. Imp. Pass
Installation Vendor Regional Snr. Imp.
Vendor A64 Link
Regional O&M Eng.
Area manager Accepted
Regional O&M Eng. PAT for Tx
Not Pass MS130 Site Inspection Completed Vendor,include
I&C,Post Inspection,Tx on site,document,NW path to Access Tx Link
Document
Core NW PS&CS are now completed Stability Test
I&C A61/A59/A65/A70/A72 Document for MS130 is Pass
Only with minor deficiency(only NSA)
Completed Turn On Cycle received and checked
Regional Snr.
A131 Inspection Pass Regional Snr. Imp. FOP
#1failed (with SA or Area manager
Regional Snr Imp. Mandatory itemes) Regional O&M Eng.
Access NW Engineering &
Performance Area manager Regional SnrImp.
Central Operation Regional O&M Eng. Regional O&M Eng.
Same as 2G
Access Network
A71 Transmission
NSA Deficiency A171 Verify
Items Cleard correctness
A80 A85 (FATfor TxVendor) of data entry
24Hrs stability 24Hrs stability before PAT
Regional Snr. FOP sign-off
Test Started Test Completed
A90 Physical/ Area manager
NMC NMC
Integration/ A134 NSA Deficiency
Commissioning Items Cleared
Documentation
checked Regional Snr Imp. MS160
Footprint
Drive Test Regional Snr. Imp. Area manager Completed
Verify if Drive Test A105 MS140 Site Integrated
A106 PAT
Vendor result of site Acceptable Footprint drive test The site has been fully Regional O&M Eng.
Drive Tester coverage area is completed & Footprint drive test
integrated and drive Regional/
acceptable Documented (report approved
tested Area
issued to Perframnce team)
Regional RF Engineer Regional Snr Planner manager
Regional Snr Planner Regional Snr Planner A148
Access NW Check performance passed
Engineering & including 2G co-located site
Performance (post launch KPI 3 days)
Not Acceptable
Regional RF

Down Site Fix or Issue PW to CMC Link to: MS145 Site


Record in NetOne Planned Document MS180 Completed Site
change NW and document to
database work Completed for asset FAT Completed
parameters performance
Transfer

Vendor Vendor Vendor Regional Snr. Imp. Regiona/Area


manager
9
together
we can make
it true
Turn On Cycle
A61/B61(2G)
Link to :
Create data fill for
2G TOC
2G/3G data
Process
(2G OMC)

RAN Cap. Mgt


A61/B61
Create Data Fill
RNC
Call off list issued to Check RNC send information of
connectivity
RAN Architechture capacity new site to OMC
completed Cell Parameter Generate TOC
data build and
Regional Access Finish plan and list and resend
RAN Cap. Mgt Regional Snr. IMp Vendor
Network send to code to CMC (cc
Management OMC team)
IBC Team RAN Cap. Mgt
A65/B65 Performance Code
In case of there is no team Management
OSS Views/
capacity for some
data Build
sites, RAN
Created (Create
Architecture will in OMC and
check RNC capacity MSC)
everyweek until there
are some capacity *OMC team
Issue Preliminary
available NSS Support TOC list (List of
Send Planned
Vendor site needed
work to CMC
TOC)to
optimization Team Code
Provide
Feedback to Regional Access Management
capacity
Regional team Network
RAN Cap. Mgt IBC Team
RAN Cap. Mgt
Approve
Planned work
Fault clear Investigate Data CE/64 QAM upgrade
inform Snr.Imp. Send "Carrier/power Network O&M
Script file
to fix fault amplifier upgrade"list Mgt
There is
service OMC team RAN Cap Mgt.
OMC team
affecting (Code
A72/B72 alarm at Management)
TOC site
completed
Cannot implement due to
OMC team Data Script's problem

Work complete A70/B70 Inform the completeness of


Call test complete work to vendor,RAN
architecture,Code
Verify correctness Management,Optimization,NM
of data OMC team Data script
C and regional team
configuration & implementation
parameter in both Regional Snr. Imp
2G/3G OMC OMC team
Vendor
RAN Cap. Mgt.
CMC team
10
together
we can make
it true

together
we can make
it true

Thank you