Dasherkandi Sewage Treatment

Plant (500MLD) Project

Final Sedimentation Tank

Prepared By:
Dr. Md. Alhaz Uddin
Nazmul Hassan
Sewerage Treatment Plan
Dasherkandi Sewage Treatment Plant (500MLD) Project Site Plan
Final Sedimentation Tank
Code & Standard
• BNBC-2006
• UBC-1997

Loading Condition

• Self Weight of Water Tank


• Waste Water Load =9.807 kN/m3
• Mechanical Equipment Load =10 kN/m2
• Earthquake Load (UBC-1997)
Materials
For Tank For Pile

Pile Raft
Pile
Seismic Load

• Structure importance coefficient, I= 1.25 (Table 6.2.23


in BNBC-2006)

• Zone coefficient, Z=0.15 (Table 6.2.22 in BNBC-2006)

• Stiff soil profile= SD (UBC-1997-Table 16-J)

• Program Calculation Method, Ct=0.02 (BNBC-2006)

• Structure Response Modification Factor R (UBC97) =5


Tank Modelling
Load Combination
Pile Location
Point Reaction