RBS204

BUILDING REFURBISHMENT AND


ADAPTATION PROJECT

PREPARED BY:
SR. NUZAIHAN ARAS BT AGUS SALIM

Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II
BSB312
Assessments:
This course will based on 100% of project and
coursework.
First Project : 30% - Precedent Studies
Site Analysis : 20%
Final project : 50% - Proposal

All the above tasks are grading by WEEKLY CRITICS SESSION, PROJECT
PRESENTATION and an A3 SIZE REPORT.
PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

THIS COURSE ARE CONCENTRATING ON:

1. DESIGN DEVELOPMENT
- Principle of design elements, space management and
developments.

2. LEGAL ASPECTS
- Building legal aspects, Acts and regulation, Conservation and
Preservation Aspects.

3. PRINCIPLE OF REFURBISHMENT AND ADAPTATION WORK


- Refurbishment and adaptation works and process.

4. ANALYSIS REPORT
- Managing and preparing analysis and proposal reports.
PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What is refurbishment????

Renovation: the state of being restored to its former good condition; "the inn was a renovation
of a Colonial house".

Construction activities with the purpose of essential rearrangement of existing building in order
to eliminate its physical,economic, legal, architectural/aesthetic, functional, comfort, social and
other kinds of aspect that contributes to the development of existing projects.

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What is the aims of refurbishment


project????

• Renewal the function of the building


• Rebranding the building
• Redesign the original or weaken structure
• To Increase the human comfort

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What the outcome of refurbishment


works????
• Increasement on property value
• More investors
• More on Safety aspect
• Increase Human comfort
• Functionality
• Facilitate the human needs and requirements

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What the outcome of refurbishment


works????

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What is the process involved in building


refurbishment works and planning????
1. Deterioration : building physical, façade, permanent and temporary structures, internal
elements, external elements, building materials.
2. Building services and utilities supply : lift, escalator, air conditioning, power supply, water
supply ect.
3. Legal aspects : Acts and Regulations, Guidelines
4. Architectural and Aesthetic : building images on façade, historical influences, elements,
motifs, social perspectives.
5. Funtionalilty : changes of functions that may contributes to physical changes on building
structures.
6. Comfort : orientation, lighthing, sounds insulation, thermal insulation, ventilation, material
safety and comfort aspects, , space management, maintenance aspects etc.
7. Maintenance Aspects : building condition and maintenance actions.
8. Social Impact : the community comfort, safety and perspectives in terms of economy and
social development.
9. Occupancy and surrounding area : the impact on project development to the society.

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What is the relationship between the


roles of building surveyor in
Refurbishment Works ????
Design Stage : - preparing the building dilapidation reports.
- recommend to the Architects and Engineers on maintenance actions.
- involve with the design architects on design development.
- preparing the monitoring and maintenance planning action during the
project commissioning and building operational.

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

Therefore…….

Your reports must be


concentrated and analysed on
maintenance action together
with design planning.

PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

What should have in a refurbishment


report????
1. Building history utilities
2. Key plan 13.Architectural style
3. Site orientation 14. Building Previous and Existing
4. Site access Plan
5. Wind flow 15.Legal aspects
6. Adjacent building 16.Building materials
7. Surrounding area 17.Building construction
8. Traffic flow 18.Building dilapidation survey
9. Site culture 19.SWOT analysis
10.Site economy
11.Site vegetation
12.Site facilities, services and
PREPARED BY: SR. NUZAIHAN ARAS BT AGUS SALIM, Sr. Mariaty Bahari, Pn. Zuraihana Ahmad Zawawi, Pn. Nurfadhilah Bahardin
BUILDING DESIGN II BSB312

All The Best and Goodluck!!!