Hydro Electric Power Plant: MP Scenario
Hydro Electric Power Plant: MP Scenario
Hydro Electric Power Plant: MP Scenario
MP Scenario
Hydro Power Potential of the state
• Total assessed power:- 2775 Mw
• Out of this 21% power potential has already
been developed.
• Further 44% is under development.
• And 35% hydro power potential is yet to be
harnessed.
• Besides the above almost 100% power
potential from SHP is yet to be harnessed.
Various Hydro Projects in MP
• Bargi Dam
• Bansagar Dam
• Gandhi Sagar
• Rajghat Dam
• Tawa Dam
• Mahdikheda Dam
• Omkaresher Project
• Indra Sagar Project
Bargi Dam
Length 11200 m
Height 43.8 m
Construction began 1975
Opening date 2006
Maintained by Water Resources Department,
Madhya Pradesh
Tawa Dam
Length 1,815 m
Height 57.91 m
• Multi-Purpose Dam.
• Power generation capacity 60Mw(3*20).
• Catchment area 5540 sq.km.
Madikheda Dam
Large Area
Presented By:-
Gaurav Modi
(081113216)
Tarun Anandani
(081113201)