Metal Fabrication Requirements
Metal Fabrication Requirements
Material Inspection UG – 93
UG-93 cover what is normally referred to as “ receiving
inspection”. It gives the requirement that must be met prior
to a material being used in fabrication, and include :
– Plate : an MTR or C o C as required be the material specification.
– Other product form : each piece must marked with the specification,
grade, type and class when the spec. cover such marking.
– Tubing may be identified by bundle
AI shall must examines that MTR or CoC and verify that
the material is marked and identified as required by the
material specification and /or the quality control manual
Material Marking and Traceabilty
UG - 77
Fabricator must :
Maintained identification of the material until
vessel completed
May used coded marking
May record the required marking
Transfer any marking
Control of material during
Fabrication
A Fabricator’s Quality Control Manual shall
describe his system for control of material
including all welding materials. And must
address :
– Storage
– Issue
– Examination
– Identification
– Repair
Forming Requirements
Forming operation shall not cause any adverse
changes to material properties.
– There can no flat spot along longitudinal joint
– Must meet circularity requirement of UG- 80/81
– Dimension and tolerances must meet the requirement of
the design
– Must include minimum thicknesss requirement after
forming
– Alignment tolerances for butt welded joint must be
maintained
Forming Carbon stell
Cold forming by blows is not permitted
Forming by blows is permitted if the material
is at the forging temperature and the
material is PWHT’d
If part is cold forming by other, certification
to UCS-79 must be supplied by the part
manufacturer
Out of Roundness
UG - 80
The maximum ID minus Minimum ID shall
not exceed 1 % of the nominal ID
If the out of roundness measurement is
taken within one diameter of ID of a nozzle,
an additional 2 % of ID of the opening may
be added