Preliminary information of Site • Location Plan- GIS/Google Earth Map of Site.
TOTAL PLOT AREA =12.95SQM
Preliminary information of Site • Detailed Map of Site (Zoomed in Version) Preliminary information of Site • Land Use Plan of Site- Master Plan. Preliminary information of Site Sr. No Parameter Remark 1 District DURG 2 City/ULB BHILAI 3 Present No. of DU 1176 4 Area of Site in sqm. 12.95 Hectare 5 Population residing 6 Road Width as per Proposed Master Plan. 30M 7 Probable – SRC Area 44704 sq.m 8 Probable – CLP Area 3.04 Hectare 9 Collector Guideline Rate 23700 10 Proposed DU - Construction 1176 11 Construction Cost 4924.05 Lakhs 12 Infrastructure Cost 516.23 Lakhs 13 Rental Cost 564.48 Lakhs 14 Development Fee 98.48 Lakhs 15 Total Project Cost- SRC 5710.11 Lakhs