GOES-R Ground Segment Project NSOF Lunchtime Seminar: 17 September 2009
GOES-R Ground Segment Project NSOF Lunchtime Seminar: 17 September 2009
Tracy Zeiler
Assistant Ground Segment Project Manager
17 September 2009
17 August 2009
Agenda
• Welcome
• Program Overview
• Questions
17 August 2009 2
GOES-R Program Office
17 August 2009 3
GOES Satellite Mission
• Weather sentinel
– Hurricanes
– Severe storms
– Flash floods
• Input to weather models, forecasts and warnings
• Fire and smoke products for air quality monitoring and
forecasting and fire fighting
• Sea surface temperature monitoring for fisheries and
climate
• Winds for aviation
• Solar imagery for communication satellites, utility
companies, and astronaut safety
• Environmental data collection–buoys, rain gauges…
• Search and Rescue
• GOES data shared within the western hemisphere
17 August 2009 4
GOES-R Objectives
17 August 2009 5
GOES-R Program
17 August 2009 6
GOES-R Program (Continued)
17 August 2009 7
GOES-R Program Status
• Spacecraft acquisition
– July 22. 2009 – Lockheed-Martin
Denver, Colorado
• Ground acquisition
– May 27, 2009 – Harris Corporation
Melbourne, Florida
• Information
– Spacecraft: NNG07193033J, NNG08193033R /
http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=51
– Ground: DG133E-08-RP-0068
http://www.fedbizopps.gov
17 August 2009 8
Program Management
Structure
DOC
NOAA
Program Management NOAA
Council
NESDIS
AA: Mary Kicza
17 August 2009 9
GOES-R
Ground Segment Project
17 August 2009 10
GOES-R Ground Segment
Project Office
Contracting Office
Dave Runner, GPO CO
GOES-R Ground Segment Program Matrix Support
Facilities: Chris Morris
Kelly Mabe, GSP CO Project Management IT Support: IT Team
Brian Brown, CS Admin Officer: Karen Schaffert
Project Manager: Vanessa Griffin
Deputy Project Manager: Robin Pfister
Project Control Office Assistant Project Manager: Tracy Zeiler
Resources Mgr: Stan Stanczyk
Project Support: Gary Sloan
Administrative Assistant: Donnise Brooks Mission Assurance
Lead: Belkacem Manseur
Project Support: Mary Bernhard Administrative Assistant: Pat Rader Sr QA Eng: Dan Laczko
Cost Management: MaryAnn Davis
Reliability Eng: Ying Shi
Scheduler: Neil Bozievic
Reliability Eng: Paula Pruessner
Risk Management: Adrian Rad
Software QA: Saul Harris
EVM Control: Bernard Gerrity
Safety Eng: Dave Rossi
EVM Control: Casey Connor
Project Science Office Safety Eng: Bill Hill
Cost Control: Jim Gates
Project Scientist: Jim Gurka DCMA
Financial Analyst: Tim Daniels
Property Management: Sam Jacob GEOSS Liaison: Kathy Fontaine
Mission Management Product Generation Product Distribution Enterprise Algorithm Development Antenna System
IDT Lead: Chetan Sayal IDT Lead: Satya Kalluri IDT Lead: Dave Han IDT Lead: Johnny Medina Lead: Laurie Rokke Lead: Ida Hakkarinen
17 August 2009 11
Ground Segment Project
Support Contractors
17 August 2009 12
GOES-R
Acquisition Background
• Architecture Studies
– 12 Architecture Study contracts awarded November 2003 to
evaluate end-to-end architecture approaches
17 August 2009 13
GOES-R
Acquisition Background
(Continued)
• Harris Contract
– “Ground Segment Contractor / GS ‘Core’ Contractor”
– Awarded May 27, 2009
– $750M
– 10 year Period of Performance
– Award Fee
17 August 2009 14
Ground Segment
Implementation Approach
Leads, Coordinates, Performs independent end-
Ground Segment Project Office
product verification and GS validation, etc.
17 August 2009 15
GOES-R
Ground Segment
Functional & Performance
Requirements
17 August 2009 16
Notional Functional Overview
GOES East
GOES West
Mission Includes satellite mission operations (telemetry and command), mission scheduling, mission state-of-health
Management trending, satellite orbital analysis, and processing raw data to Level 0 (L0)
Product Includes processing L0 data to Level 1b (including calibration, and navigation & registration) and creation of
Generation GOES-Rebroadcast (GRB), creation of eGVAR, and creation of higher level data products (Level 2/2+)
including operational formatted products.
Product Includes distribution of GRB, distribution of KPPs to AWIPS, distribution and access to data and formatted
Distribution products via the GOES-R Access Point, and distribution of data and formatted products to CLASS
Enterprise Provides situational awareness of all functions of the GOES-R GS by monitoring and reporting the
Management configuration of the security, networks, communications, and operational systems
17 August 2009 17
Requirements Summary
Ground Segment
• Maintain Health and Safety of the Flight Systems
• Overall system availability of 0.99989 (TBR) for KPP products and 0.997
(TBR) for non-KPP products
• Maximum Time to Restore Service of 4.75 min for MM, KPP PG and PD
– Maximum Time to Restore Service of 120 min for non-KPP PG and PD
17 August 2009 18
Requirements Summary
Ground Segment (Continued)
• IT security requirements
17 August 2009 19
Requirements Summary
Ground Segment (Continued)
• Utilization rates
– Memory utilization less than 50% (TBR)
– CPU utilization less than 70% (TBR)
17 August 2009 21
Requirements Summary
Mission Management
• Space-Ground communications
– TLM & CMD
– Unique Payload Services (HRIT/EMWIN*, DCS, SARSAT)
– GOES Rebroadcast (GRB)
17 August 2009 22
Requirements Summary
Mission Management (Continued)
• Integrate
– Flight Software (FSW) Development Environment
– Spacecraft and Instrument Simulators
– Antennas and front-end RF equipment
17 August 2009 23
Requirements Summary
Product Generation
17 August 2009 24
Requirements Summary
Product Distribution
• Distribute GRB to the MM for Rebroadcast
17 August 2009 25
Requirements Summary
Enterprise Management
17 August 2009 26
Requirements Summary
Enterprise Management (Continued)
• Monitor and report primary and backup site functions, and the
interfaces to external systems
17 August 2009 27
GOES-R GS External
Interfaces
Interface Name Summary of interface
(Org)
GAS Transfer of L2/L2+ and other data/products to the broad terrestrial user
(OSDPD) community. Product discovery, access, and distribution.
HRIT/EMWIN Transfer of HRIT data from OSDPD (at NSOF) to the GOES-R GS OSD
(OSDPD) (RF) function at Wallops and RBU for uplink.
Ancillary Data Transfer of Ancillary Data (relayed from the NWS or other agency) from
Relay System OSDPD to the GOES-R GS operational product generation element.
(OSDPD)
CLASS Transfer of L0, L1b, L2/L2+ and other data/products to CLASS for long-term
(OSD) archive.
GOES-N/O/P Transfer of select L1b data to GOES-N in “eGVAR” format to support legacy
(OSO) processing
DCS Transfer of DCS information to/from GOES-R OSD (RF) function at Wallops
(OSDPD) to support the DCS mission
AWIPS Transfer of sectorized cloud & moisture Imagery products to the National
(NWS) Weather Service’s Advanced Weather Interactive Processing System .
Space Segment Communications between the GS and the spacecraft.
(GOES-R)
17 August 2009 28
Deliverables
17 August 2009 29
Government Furnished Property (GFP)
Summary
• Facilities at NSOF, WCDAS, and RBU
• Antennas (NSOF)
• Inter-site communications circuits
• Algorithms
• Test Data
• Simulators
• T&C Database
• Flight Software Development Environment
• Documentation, e.g.,
– Spacecraft T&C Handbook
– Instrument Calibration Databooks
– Security
• Common Anomaly Tracking System (CATS) Database
17 August 2009 30
Transition to Operations
17 August 2009 31
Transition to Operations
(Continued)
• Sustainment support
– Hardware
– Software
– Logistics
17 August 2009 32
Program and Project
Implementation Milestones
17 August 2009 34