Professional Documents
Culture Documents
Fresnel TRNSYS Simulation
Fresnel TRNSYS Simulation
27 November 2014
Carlos José Felbol Acuña
(2008 – 2014) Science Bachelor
Degree.
(2008 -2015 Expected) Mechanical
Engineering, Pontificia Universidad
Católica de Chile.
(2014 – 2015 Expected) Master of
Science in Engineering.
Test the technical and economic
feasibility of polygeneration with a
Linear Fresnel Collectors CSP plant.
The polygeneration module will
include besides the typical power
generation cycle (electricity
output), a desalination module, a
solar cooling module with an
absorption chiller and a module to
generate heat for some industrial
process.
The idea behind this is to compare
the functioning and cost between
the different options of
polygeneration plant, besides the
cost and functioning of every
module separately.
2014 First Semester
70
60
50
Murcia
40
Crucero
Marimaura
30
20
10
0
Producción [GWh/año] Factor de planta %
2014 First Semester
The figure below shows the results of total land area for
Puerto Errado 2 in the original site (Murcia, Spain) and
two sites in Chile: Crucero, near to Calama in Antofagasta
region and Marimaura, near to Linares in Maule region.
500000
400000
Murcia
300000 Crucero
Marimaura
200000
100000
0
2014 Second Semester and Next Year