b. Constraints Precast
Requires a large initial investment and advanced technology
It takes finesse and accuracy
Required production equipment (transport and erection)
Building on a large scale
• Building with Precast Construction method
• a. A series of activities performed in the production process
are:
• 1. Making the framework of reinforcement
• 2. mold making
• 3. Preparation of concrete mix
• 4. Casting concrete
• 5. Care (curing)
• 6. Completion of the final
• 7. Storage
b. Transport and conveyance
Transportation is the removal of precast elements from the factory to the
installation site. Transportation systems affect the time, the efficiency of the
construction and transport costs.
Noteworthy in the transportation system are:
• Specification transport tool
• Route transport
• Licensing
Lifting equipment is moving elements of a buildup to the position of the connection
(assembly).
Is the binding element of the column to the floor using a hydraulic jack.
The principle of construction is as follows:
• Floor plates using reinforced concrete cast on the lower floor
• The column is a vertical load dealer can as precast elements or cast in place.
• Once the floor is strong enough can be removed one by one with a hydraulic jack.
c) Slip - Form System
In this system the concrete is poured over the steel mold which can move upward climb following the
addition of wall height is concerned.
d) Push - Up / Jack - Block System
In this system on the roof top floor first cast dalu then lifted upward with hidranlic - jack mounted
below the vertical support element.
e) Box System
construction using dimensional form of modules concrete cube.
• PRINCIPLE constructional
a. Prefabricated components precast concrete units can be said economical only if the cost of transport and of overall
production secra eresktion significantly lower than the cost of conventional concrete (concrete in situ).
b. Transportation and erection munghkin value can be kept low if the mechanical engineering in improved
manufacturing
c. There are basically two forms of transport:
1. Transportation highway
2. Transportation by rail
d. Some things to consider in the selection of transport
1. The distance transport - ekomonis distance of 200 km
2. The dimensions of the object to be transported
3. The volume of the transported objects - a minimum of 400 units
4. Frequency of transport
5. The nature of the object material to be transported
6. Time available
7. The distribution of the construction site
8. Location of project and Accessibility
9. Costs are available
10. Legalization sdistem transport