Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 11

10 Golden Rules for setting Down

Hole Tools

10 Golden Rules
for setting
Down Hole Tools
10 Golden Rules for setting Down
Hole
1-Job Preparation
Tools
 Find out Casing Size and weight (Tool Dressing)
 Depth and Temperature (Rubbers & O-rings)
 Tubing Size, Weight & Thread type (X-over & Drill
Collars)
 Type of Job
 Fishing Diagram
 Back up (Spare elements, O-rings, Slips, …) – Best
is to have a second tool ready to go
 Function Test
 Pop Joints (Avoid long stick ups)
 Physical Check (X-over)
 Scraper run, Perforations blur will damage the
elements
10 Golden Rules for setting Down
Hole Tools
2- Never hang a String with a loose
connection
 Specially while hanging a heavy string down-
hole (Hurricane/ DLT jobs)
10 Golden Rules for setting Down
Hole Tools
3- Minimum Left Hand Turns
 Never exceed 3 left hand turns
 While unlatching RBP start with 1 turn and
proceed with 1/4 turns
 If failed after 3 left hand turns do 5 right hand
turns and repeat
 Exception: Storm Valve
10 Golden Rules for setting Down
Hole Tools
4- Surface Handling
 Never put slips around packer body
 Connect a 5’ Pop Joint on top of the tool
10 Golden Rules for setting Down
Hole Tools
5- Signals At The Tool
 Signals at surface may differ from signals the
tool receives down-hole
 Send Big Signals specially in deep/ deviated
wells
 To make sure Positrieve safety position pick
up as much as derrick lets
10 Golden Rules for setting Down
Hole Tools
6- Up Weight & Down Weight
 Record and mark up weight and down weight
of the string and the distance between them
before trying to set the tool
10 Golden Rules for setting Down
Hole Tools
7- Don’t Rely On Your Memory
 Write down all steps of the job in a tally book
and take it during the job
 Mark setting depth and other important points
on the tubing
 record all job data
10 Golden Rules for setting Down
Hole Tools
8- Have Your Eyes On the Weight
Indicator
 M/D is the only indicator in setting a tool
 Notice and record all changes on M/D during
the job
10 Golden Rules for setting Down
Hole Tools
9- Tight Top To Down
 Tightening a connection on the rig floor may
unscrew upper connections
 While tightening a string mark and have your
eyes on upper joints
10 Golden Rules for setting Down
Hole Tools
10- Let the elements relax
 As soon as the tool is unset before pulling up
let the rubber elements relax for 5 to 10
minutes.

You might also like