• Length of lateral
Well A Well B
Fracture orientations
must be known N
Gas
Optimized Placement
of Completion
Identification
of Formation and
Fluid Interfaces Oil
Water
A-4
A-3
A-1 A-9
A-3
A-2
Spare slot
sp.
A9
A6
sp. A8
A3 sp.
A1
A10 A4
A5 A2
A7
sp.
sp.
Well locations at
SSSV depth
(showing no-go area) Slot with target or drilling
sequence number
Cilindro de Viajes
ME
7/2
0/2
01
8
Norte
HOWEVER, once the wellbore geometry becomes complex then the correlation between
these is lost, and the ellipsoid is affected by the three error sources in a combined fashion
The Size of the Ellipsoid
Lateral Error
(Major Azimuth)
TVD
(Vertical Azimuth)
Inclination Error
(Minor Azimuth)
3 S.D. ~ 99%
of all results
1 Standard Deviation
From The Mean
Schlumberger Private
proximas generaciones
Reputacion – Credibilidad y Confianza
Economicas – Perdida del pozo, Produccion,
Equipo, etc
Estrategicas – Perdida de Permisos y Licencias
15 HME
7/20/2018
Causas para la Colision de Pozos
Schlumberger Private
Malas practicas, procedimientos y reportes
Planificacion Pobre o Insuficiente
Falta de Comunicacion
Base de Datos de Surveys Pobre
– Combinacion de Datos
Aplicacion Incorrecta de la Incertidumbres de Surveys
Falta de reconocimiento de los eventos de perforacion
16 HME
7/20/2018
Razones Mas Comunes
Por Partes de los Operadores – Ahorrar Dinero y/o no se
reconoce el riesgo
– El impacto es considerado como bajo riesgo
– Nadie sabe que hacer con los Surveys toados en pozos
Schlumberger Private
antiguos
– Giroscopicos signfican solo un gasto adicional , no existe
mitigacion de riesgos
– Depende de la Cia Direccional el cuidar este aspecto
Contratista
– El cliente no quiere seguir los procedimientos
– Riesgo no es entendido y/o comunicado al cliente
– No guia al cliente en decisiones tomadas en base a riesgos
– Procedimientos no son entendidos o se esta muy ocupado
17 HME
para aplicarlos
7/20/2018
Gerenciamiento de Riesgos
Schlumberger Private
• Analisis de Elipses de Incertidumbre (EOU)
– Nudge
– Anti-colision
– Seguir Operaciones Estandar (Ejem: Se tiene que
tomar surveys en el conductor antes de empezar a
perforar el pozo)
– Mitigacion de Riesgos
18 HME
7/20/2018
Tecnicas de Anti-Colision
Definir un Estandar de Surveys
Base de Datos de Surveys Definitivas
Usar Cilindros de Viajes mientras se realiza un Nudge
Schlumberger Private
Factor de Separacion Orientado para reconocer el riesgo
Referencias comunes
El plan final deber permitir la perforacion del pozo, con el
menor riesgo posible y sin ningun hecho relacionado a la
seguridad
Diseno de las Sartas, requerimiento de DC’s
antimagneticos,, gerenciamiento de surveys, etc
Plan de Contingencia
19 HME
7/20/2018
Herramientas de Ejecucion de AC
Schlumberger Private
Programa Direccional – Identificar Riesgos
Uso del DDToolBox en el equipo
Calculo del Factor de Separacion Orientado Mientras se
Perfora
Comunicacion si existe alguna variacion en la ejecucion
del plan
Administracion de la Base de Datos Definitiva de Surveys
20 HME
7/20/2018
Incertidumbre de Surveys
Schlumberger Private
Inclinacion y Rumbo – Especificaciones de la Herramienta
Profundidad – Errores en la profundidad medida y vertical
Referencias – Errores que norte usar, localizacion y
profundidad
Interferencia Magnetica – De la Sarta y/o Externa
Alineacion del Intrumento de Medicion
Posicion del Instrumento de Medicionen la Sarta
21 HME
7/20/2018
Safest Way to Nudge Well?
3
2
22 NSA DEC
Target
Traveling Cylinders
North or Highside
Reference Wellpath
• Can use high-side
reference if >5 degrees
Typical Display
• Depths are MD
Adjacent Wells
Entering within
cylinder
Closest Approach
24 NSA DEC
Toolface Angle to Steer the Well
Gravity Traveling cylinder
Highside
is similar to GTF Screen
0
+90 deg
180
The angle of the bend from vertical with respect to gravity, also called
Gravity Tool Face Angle.
25 NSA DEC
Safest Way to Nudge Well?
2 3
26 NSA DEC
Target
Traveling Cylinders - 270 Deg (Case #1)
Toolface
Where is
Highside on
Head-on this plot?
collision
potential
27 NSA DEC
Traveling Cylinders - 325 Deg (Case #2)
Toolface
28 NSA DEC
Traveling Cylinders - 350 Deg (Case #3)
Toolface
29 NSA DEC
Which Way to Nudge Away?
• North-North West Nudge
allows for most TFO error
without hitting another well
• Always look for least risk,
without blocking other
slots
• This is a 3-D Problem;
Vary TVD of kick-offs at
platform
30 NSA DEC
Traveling Cylinder Parts
Reference Normal Plane
Well paths
Details Box
Well ticks are ……………………: MD on the #3045
Calculation Method ………………..
: 3D Least Distance
Ring Interval ……………………. : 2.00 m
Azimuth Interval ………………….: 10.00 deg
31 NSA DEC
Scale ……………………………. : (1 cm = 1.40 meters)
Traveling Cylinder for a Collision
803-814 m
32 NSA DEC
Plotting on a Traveling Cylinder
• How do we plot on a
Traveling cylinder
based on our planned
well path?
• Plot 2.0 m @ 90
Azimuth
33 NSA DEC
The Size of the Ellipsoid
Lateral Error
(Major Azimuth)
TVD
(Vertical Azimuth)
Inclination Error
(Minor Azimuth)
Schlumberger Private
Volumen de 3D
proyectado en un
plano horizontal
Error de
Profundidad
Eje Semi-Mayor
Eje Semi-Menor
35 HME
7/20/2018
Incertidumbre de Surveys
EL calculo de la incertidumbre posicional esta basado en la
acumulacion de errores de survey a medida que se perfora
Semi-minor axis
Schlumberger Private
La forma y el tamano
de los EOU’s
12m
dependen de:
– Tipo de
herramienta de
survey
23m – Configuracion de
Sarta
Semi-major axis – Latitud y Longitud
– Inclinacion y
Direccion del
Agujero
36 HME
7/20/2018
Vista de Planta de Pozos – Sin EOU’s
Pozo en Produccion
Schlumberger Private
Surveys con Gyro
Surveys con MWD
Surveys MWD Surveys Giroscopico
37 HME
7/20/2018
Vista de Planta de Pozos – Con EOU’s
Schlumberger Private
3045D MWD
Posibles puntos
de colision
3045D Giro
38 HME
7/20/2018
Factor de Separacion
Factor de Separacion
= Separacion de Pozos de Centro a Centro
Schlumberger Private
Longitud del Eje Semi-Mayor (pp) + Longitud del Eje Semi-Mayor (pv)
– Donde (pp) es el pozo a perforar y (pv) es el pozo vecino
Espaciamiento Minimo
= La distancia minima entre EOU’s tomando en cuenta el diametro del hoyo y
factor minimo de separacion
= ½ Diametro de Hoyo(pp)+ ½ Diametro del Hoyo(pv) + FS * ( Eje Semi Mayor
(pp) + Eje Semi Mayor (pv))
39 HME
7/20/2018
EOU’s – Eje Semi Mayor – Menor y Profundidad
Semi Mayor
Schlumberger Private
Incertidumbre de
Inclinacion
Semi-Menor Incertidumbre en el
rumbo
Incertidumbre en la
Profundidad
40 HME
7/20/2018
EOU’s – Eje Semi Mayor – Menor y
Profundidad
Schlumberger Private
Incertidumbre de
Inclinacion
Incertidumbre en el
rumbo
Incertidumbre en la
Profundidad
41 HME
7/20/2018
ANTICOLLISION
Survey Station
Calculated Trajectory
Schlumberger Private
Survey Bias
ISCWSA Error Surface Displaying ‘Bias’
42
Scan Method
Offset Well Reference Well
Closets Approach 3D
Horizontal
Travelling Cylinder
Schlumberger Private
43
CLOSEST APPROACH 3D
Schlumberger Private
44
HORIZONTAL
Check Well Generic Well
Schlumberger Private
45
TRAVELLING CYLINDER
Schlumberger Private
46
FACTOR DE SEPARACION
Schlumberger Private
47
EOU’s – Eje Semi Mayor – Menor y Profundidad
Semi Mayor
Schlumberger Private
Incertidumbre de
Inclinacion
Semi-Menor Incertidumbre en el
rumbo
Incertidumbre en la
Profundidad
48 HME
7/20/2018
EOU’s – Eje Semi Mayor – Menor y
Profundidad
Schlumberger Private
Incertidumbre de
Inclinacion
Incertidumbre en el
rumbo
Incertidumbre en la
Profundidad
49 HME
7/20/2018
Factor de Separacion
Factor de Pozo
Separacion = 1.5 A Perforar EOU del
Pozo Vecino
EOU’s separados por
Esferas de 1.5 x suma de
Cierre Radios de EOU’s
Schlumberger Private
EOU del
Pozo a Perforar Linea de Pozo Vecino
Conexion entre los puntos ^ a la pagina
De mayor acercamiento
50 HME
7/20/2018
Factor de Separacion
Factor de
Separacion = 1
EOU del
Pozo
Vecino
EOU’s se Tocan
Schlumberger Private
Esferas de
Cierre
Pozo
Vecino
Linea
EOU del De Conexion entre los
Pozo a Perforar Puntos de mayor acercamiento
Pozo a Perforar
51 HME
7/20/2018
Factor de Separacion
Factor de Pozo
Separacion = 1.5 A Perforar EOU del
Pozo Vecino
EOU’s separados por
Esferas de 1.5 x suma de
Cierre Radios de EOU’s
Schlumberger Private
EOU del
Pozo a Perforar Linea de Pozo Vecino
Conexion entre los puntos ^ a la pagina
De mayor acercamiento
52 HME
7/20/2018
Factor de Separacion
Factor de
Separacion = 1
EOU del
Pozo
Vecino
EOU’s se Tocan
Schlumberger Private
Esferas de
Cierre
Pozo
Vecino
Linea
EOU del De Conexion entre los
Pozo a Perforar Puntos de mayor acercamiento
Pozo a Perforar
53 HME
7/20/2018
Escaneo de Anti-Colision
Proposito
Para evitar cruces accidentales con pozos cercanos
mientras se perfora y asi mantener una distancia segura
de acuerdo al modelo de incertidumbre planificado
Schlumberger Private
Metodos
Escaneo de Distancia 3D
– La distancia es calculada perpendicular al pozo vecino
desde el pozo a perforar
Escaneo de Plano Normal
– La distancia es calculada perpendicular al pozo a perforar
desde el pozo vecino
54 HME
7/20/2018
Cilindro de Viajes
2
3
Schlumberger Private
1
Objetivo
55 HME
7/20/2018
Cilindro de Viajes
Norte
Schlumberger Private
Viaja junto con la perforacion
del pozo
Indica la distancia con los otros
pozos
Referida al Norte Verdadero
56 HME
7/20/2018
Compass Error Ellipse Report Semi-Minor Unc
Plan View
North
3 Dimensional View Semi-Min.Azi
Lateral Bias
Lateral Unc.
Semi-Major
Unc.
X Borehole East
Target Shapes:
Targets can be any regular or irregular shape, in
two or three dimensions. Circles, squares and
rectangles are very common for low inclination
wells. Three dimensional targets are more
common in high inclination wells.
Geological Target
Error Ellipse
Wellbore ‘x’ at
centre of target
Error Ellipse:
Depends upon well bore trajectory and
planned method of surveying the well bore.
The orientation of the ellipse depends
principally upon the azimuth of the well at or
near the target.
1) Geological Target
3) Error Ellipse
2) Target Centre