Mine Plan and Mine Schedule Flow Chart: Minescape (Optional)
Mine Plan and Mine Schedule Flow Chart: Minescape (Optional)
MINESCAPE
(OPTIONAL)
-Model : grid & table file
-Topo : grid file MINE PLAN
GEOLOGICAL MODEL -Schema, Sheet, grid spec •Longterm & Shortterm Planned
•Roof & Floor Structure Contour
•Boundary, Coal, Waste Target, SR
•Topographical Data
•Geo-technical Data (Slope stability)
•Slope Stability Data (HW, LW, etc)
•Spoil Dump (Volume, Top Soil Balance)
•Borehole
•Infrastructures : Ramp, S.Pond, Pump, etc.
•Relative Density (averages, default) RESERVES
•Material : RD, Swelling Factor
•Coal Quality (optional) •Waste (per Bench)
-High wall Area
-Low wall Area
-Pit Area (IB, OB, UB)
Coal Insitu (per Bench, per Seam)
Coal Recovery (per Bench, per Seam) Monitoring/
Monitoring/
Updating Stripping Ratio Updating
Monitoring/ Top Soil Removal
Updating
EQUIPMENT
PRODUCTIVITY
•Material (Coal, Waste, Tsoil
•Sequence -Density, Swell factor, etc.
MINE SCHEDULE •Pit /Location •Route
•Yearly, Monthly, Weekly MINE STAR
•Shell Name •Roaster
EXPAC Monitoring/
-Stripping Volume & Area •Bench, Strip, Level -Rainfall & Slippery
Spreadsheet Updating -Effective W. Hours
-Mining Volume & Area •Stripping Volume
-Waste Dump Volume Area •Equipment Specification
•Mining Volume
-Top Soil Volume & Area -Capacity
•Stripping Ratio •Equipment -Availability
-ROM Pit Stockpile
-Infrastructure
•Equip Required Allocation -Dimension
-Hauling Distance to ROM/ Waste, Coal, -Reimpull, etc.
Spoil Dump Tsoil Removal
Pit Service, etc.
Monitoring/
Updating
PT PAMAPERSADA NUSANTARA
Halaman 1 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Conceptual of Mine Sequence (X-Section)
PT PAMAPERSADA NUSANTARA
Halaman 2 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Conceptual of Mine Sequence (Long Section)
Overall
grade 8% Sump Area
Progress
Arah sequence dimulai dari sidewall menuju ke endwall, kemudian secara bertahap sisi
endwall akan didalamkan lebih dulu agar seluruh darinase dapat diarahkan ke posisi sump.
Konsep pemotongan dan pola sequence dilakukan dengan mempertimbangkan ramp design
overall grade 8%, pada setiap jarak 200 m baru dilakukan penekanan level sedalam 12 m.
PT PAMAPERSADA NUSANTARA
Halaman 3 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Monthly Schedule (exmp)
MONTH January
PIT SEQ SHELL NAME OB STRIP COAL SRATIO LOCATION OB STRIP COAL SRATIO
2008 LWB084S09 104,660 PN1 Total 947,230 448,260 2.11
2009 LWB084S10 101,670 PN2 Total 1,063,240 664,670 1.60
2010 LWB084S11 161,550 PN3 Total 558,110 683,910 0.82
2011 LWB084S12 25,310 TOTAL 2,568,580 1,796,840 1.43
2015 LWB072S09 113,490
PN1
2016 LWB072S10 143,320
2021 HW036B060S11 59,530
2026 HW036B048S09 116,040 210,590 0.55
Month : February 2002 OB Stripping
2027 HW036B048S10 101,100 202,760 0.50 PT. PAMAPERSADA NUSANTARA
TUTUPAN MINE (PT ADARO INDONESIA)
Available Days 27.0 Days Coal Exposed
Effective Days 18.0 Days Coal Mined
2028 HW036B048S11 20,560 34,910 0.59 Effective Working Hrs 378 Hours Coal Hauling
2 1
Coal Coal Mined (Tonnes) Coal Inventory Est. (Tonnes) Setting Target Coal Mined (Tonnes)
Eff. WH
Location Expose By By Unit Opening Closing Inventory of Prod'ty Avg. Ton / Eff.
PA Req'
Input Data (Tonnes) Schedule Setting Inventory Schedule Unit Set Type
EX 803
PC 750
70%
85%
1.00
0.88
(Updat
720
250
Days
10,584
3,927
(Hours)
318
339
R 906 80% 0.04 480 337 15
PN1 435,560 271,500 320,709 99,054 263,114 213,905 -
-
-
Sub Total Volume Setting Unit 320,709
EX 804 85% 1.00 950 16,958 386
PC 1100 85% 1.00 480 8,568 386
R 903 80% 0.98 480 7,903 356
PN2 1,558,100 700,000 826,875 345,217 1,203,317 1,076,442 R 904 80% 0.60 480 4,853 218
-
PT PAMAPERSADA NUSANTARA
Halaman 4 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Monthly Map Document
RL 144
RL 144
ST 21
ST 20 ST 22 ST 24
ST-12 ST 19 ST 23
ST 25
ST-13 ST 17
ST 18
ST 26
ST 27
ST 28
ST-14 ST 15
ST 16 ST 29
ST 30
ST 14
ST 13
ST-15
ST 12
ST 11
ST-11
ST 10
ST-10
ST 09
ST-09
ST-00
ST 08
ST-08
ST-01 ST 07
ST-07
ST-02 ST 06
ST 04
ST 05
ST-06
ST 02
ST 03
ST-03
ST 01
ST-05
ST-04
PT PAMAPERSADA NUSANTARA
Halaman 5 dari 9
PAMA