MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Mine Plan and Mine Schedule Flow Chart

MINESCAPE
(OPTIONAL)
-Model : grid & table file
-Topo : grid file MINE PLAN
GEOLOGICAL MODEL -Schema, Sheet, grid spec •Longterm & Shortterm Planned
•Roof & Floor Structure Contour
•Boundary, Coal, Waste Target, SR
•Topographical Data
•Geo-technical Data (Slope stability)
•Slope Stability Data (HW, LW, etc)
•Spoil Dump (Volume, Top Soil Balance)
•Borehole
•Infrastructures : Ramp, S.Pond, Pump, etc.
•Relative Density (averages, default) RESERVES
•Material : RD, Swelling Factor
•Coal Quality (optional) •Waste (per Bench)
-High wall Area
-Low wall Area
-Pit Area (IB, OB, UB)
Coal Insitu (per Bench, per Seam)
Coal Recovery (per Bench, per Seam) Monitoring/
Monitoring/
Updating Stripping Ratio Updating
Monitoring/ Top Soil Removal
Updating

EQUIPMENT
PRODUCTIVITY
•Material (Coal, Waste, Tsoil
•Sequence -Density, Swell factor, etc.
MINE SCHEDULE •Pit /Location •Route
•Yearly, Monthly, Weekly MINE STAR
•Shell Name •Roaster
EXPAC Monitoring/
-Stripping Volume & Area •Bench, Strip, Level -Rainfall & Slippery
Spreadsheet Updating -Effective W. Hours
-Mining Volume & Area •Stripping Volume
-Waste Dump Volume Area •Equipment Specification
•Mining Volume
-Top Soil Volume & Area -Capacity
•Stripping Ratio •Equipment -Availability
-ROM Pit Stockpile
-Infrastructure
•Equip Required Allocation -Dimension
-Hauling Distance to ROM/ Waste, Coal, -Reimpull, etc.
Spoil Dump Tsoil Removal
Pit Service, etc.

Monitoring/
Updating

PT PAMAPERSADA NUSANTARA
Halaman 1 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Conceptual of Mine Sequence (X-Section)

Tingkatan warna menggambarkan Plan Sequence Bulanan


Tahapan penambangan (sequence) dimulai dari no. 1, 2, 3, dst dengan metoda
bench level per 12 m
Setiap no sequence mempunyai nama shell, dengan pola penamaan sebagai berikut
PN1HW036B120S09
Dimensi Shell 100 x 200 x 12 m, tergantung kemampuan unit (digging, grade, loading area

PT PAMAPERSADA NUSANTARA
Halaman 2 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Conceptual of Mine Sequence (Long Section)

Overall
grade 8% Sump Area
Progress

Arah sequence dimulai dari sidewall menuju ke endwall, kemudian secara bertahap sisi
endwall akan didalamkan lebih dulu agar seluruh darinase dapat diarahkan ke posisi sump.

Konsep pemotongan dan pola sequence dilakukan dengan mempertimbangkan ramp design
overall grade 8%, pada setiap jarak 200 m baru dilakukan penekanan level sedalam 12 m.

PT PAMAPERSADA NUSANTARA
Halaman 3 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Monthly Schedule (exmp)

MONTH January

PIT SEQ SHELL NAME OB STRIP COAL SRATIO LOCATION OB STRIP COAL SRATIO
2008 LWB084S09 104,660 PN1 Total 947,230 448,260 2.11
2009 LWB084S10 101,670 PN2 Total 1,063,240 664,670 1.60
2010 LWB084S11 161,550 PN3 Total 558,110 683,910 0.82
2011 LWB084S12 25,310 TOTAL 2,568,580 1,796,840 1.43
2015 LWB072S09 113,490
PN1
2016 LWB072S10 143,320
2021 HW036B060S11 59,530
2026 HW036B048S09 116,040 210,590 0.55
Month : February 2002 OB Stripping
2027 HW036B048S10 101,100 202,760 0.50 PT. PAMAPERSADA NUSANTARA
TUTUPAN MINE (PT ADARO INDONESIA)
Available Days 27.0 Days Coal Exposed
Effective Days 18.0 Days Coal Mined
2028 HW036B048S11 20,560 34,910 0.59 Effective Working Hrs 378 Hours Coal Hauling

PN1 Total 947,230 448,260 2.11 Location


Sequence Shell - Bench - Strip
Volume Equipment Setting for OB Strip
OB Strip Coal Exp. Loader Eff. WH
Strip Ratio PA Req' Prod'ty Avg.Bcm /Days
2012 HW036B084S17 46,440 45,780 1.01 From To From To (Bcm) (Tonnes) Type (Hrs)
2031 2036 HW084B156S08 HW084B132S08 267,860 20,440 13.10 PC 4000 85% 0.20 1350 28,934 77
2017 HW036B072S15 151,310 2046 2046 LWB072S11 LWB072S11 134,390 - - OK 05 80% 0.28 850 17,146 102
2055 2056 HW036B036S09 HW036B036S10 66,800 415,120 0.16 EX 805 85% 0.80 900 19,290 310
2018 HW036B072S16 69,360 1,560 44.46 - - - - -
PN1 - - - - -
PN2 2022 HW036B060S14 237,210 115,990 2.05 - - - - -
- - - - -
2023 HW036B060S15 232,610 24,380 9.54 - - - - -
Sub Total Volume Schedule 469,050 435,560 1.08 Sub Total Volume Setting Unit 469,050
2029 HW036B048S13 205,020 237,020 0.86 2001 2007 HW036B120S20 HW036B096S18 355,400 171,480 2.07 PC 3000 85% 1.00 900 19,290 386
2037 2041 HW036B108S20 HW036B084S19 323,840 194,350 1.67 PC 4000 85% 0.80 1350 28,934 308
2030 HW036B036S13 121,290 239,940 0.51 2044 2045 HW036B072S17 HW036B072S18 302,610 115,000 2.63 EX 805 85% 0.20 900 19,290 77

PN2 Total 1,063,240 664,670 1.60 PN2


2048
2051
2049
2054
HW036B060S16
HW036B048S14
HW036B060S17
HW036B036S15
375,510
573,420
118,190
959,080
3.18
0.60
OK 05
OK 08
80%
80%
0.72 850
1.00 850
17,146
17,146
261
363
2013 HW036B084S05 135,070 11,960 11.29 -
-
-
-
-
-
OK 13
R 905
80%
80%
1.00 950
0.40 500
19,164
10,086
363
145
2014 HW036B084S06 90,780 21,690 4.19 Sub Total Volume Schedule
- - - OK 09 80% 0.49 850
Sub Total Volume Setting Unit
17,146 177
1,930,780
1,930,780 1,558,100 1.24
2019 HW036B072S07 100,950 124,220 0.81 2042 2043 LWB084S04 HW036B084S04 35,340 4,820 7.33 OK 09 80% 0.41 850 17,146 148
PN3 2047 2047 HW036B072S06 HW036B072S06 84,390 168,170 0.50 - -
2020 HW036B072S08 110,060 146,370 0.75 2050 2050 HW036B060S07 HW036B060S07 5,680 126,360 0.04 - -
- - - - -
2024 HW036B060S08 29,890 171,560 0.17 PN3 - - - - -
- - - - -
2025 HW036B060S09 91,360 208,110 0.44 - - - - -
- - - - -
PN3 Total 558,110 683,910 0.82 Sub Total Volume Schedule 125,410 299,350 0.42 Sub Total Volume Setting Unit 125,410
General PC 1000 85% 4.23 300 6,300 1599
TOTAL VOLUME SCHEDULE 2,525,240 2,293,010 1.10 TOTAL VOLUME SETTING UNIT 3,005,036

2 1
Coal Coal Mined (Tonnes) Coal Inventory Est. (Tonnes) Setting Target Coal Mined (Tonnes)
Eff. WH
Location Expose By By Unit Opening Closing Inventory of Prod'ty Avg. Ton / Eff.
PA Req'

Input Data (Tonnes) Schedule Setting Inventory Schedule Unit Set Type
EX 803
PC 750
70%
85%
1.00
0.88
(Updat
720
250
Days
10,584
3,927
(Hours)
318
339
R 906 80% 0.04 480 337 15
PN1 435,560 271,500 320,709 99,054 263,114 213,905 -
-
-
Sub Total Volume Setting Unit 320,709
EX 804 85% 1.00 950 16,958 386
PC 1100 85% 1.00 480 8,568 386
R 903 80% 0.98 480 7,903 356
PN2 1,558,100 700,000 826,875 345,217 1,203,317 1,076,442 R 904 80% 0.60 480 4,853 218
-

PT PAMAPERSADA NUSANTARA
Halaman 4 dari 9
PAMA
MINE PLAN ADARO - ENGINEERING WORKSHOP 2002 Monthly Map Document

ST-21 ST-22 ST-23 ST-24 ST-25


ST-20
ST-19 ST-26
ST-27
ST-17 ST-18 ST-28 ST-30
ST-16 ST-29

RL 144
RL 144

ST 21

ST 20 ST 22 ST 24

ST-12 ST 19 ST 23
ST 25

ST-13 ST 17
ST 18
ST 26
ST 27

ST 28

ST-14 ST 15
ST 16 ST 29

ST 30
ST 14

ST 13
ST-15
ST 12

ST 11
ST-11
ST 10
ST-10
ST 09

ST-09
ST-00
ST 08
ST-08
ST-01 ST 07
ST-07
ST-02 ST 06

ST 04
ST 05
ST-06
ST 02
ST 03
ST-03
ST 01
ST-05
ST-04

PT PAMAPERSADA NUSANTARA
Halaman 5 dari 9
PAMA

You might also like