5
Pre-Launch Optimization:
6
Cluster Optimization:Data and Voice
7
Cluster Optimization:3G-2G:
8
Network Acceptance:
9
Summary of Optimization Objective
• Post-launch Optimization
– The main objective is to improve performance of a network influenced by real traffic load,
using system performance data and/or drive tests data
RNC
1 2 3
4 5 6
7 8 9
* 0 #
1 2 3
4 5 6
7 8 9
* 0 #
1 2 3
4 5 6
7 8 9
* 0 #
1 2 3
4 5 6
1 2 3
7 8 9
4 5 6 * 0 #
7 8 9
* 0 #
1
4
7
*
2
5
8
0
3
6
9
#
1
4
7
*
2
5
8
0
3
6
9
#
OAM
Optimization Steps
KPI Targets
Improvement
Network E2E
optimization
LAUNCH Cluster E2E
Optimization
Final QoS
Network Initial KPI Benchmark
Acceptance Targets
Network E2E Tools
optimization ALU Customer
NPO
Cluster E2E Initial QoS
Optimization Benchmark Call Trace RFO Protocol
Site verification
CTb / Ctg Analyzer
RF Optim
Mobiles Post-Proc.
Trace SW SW RF Planning
Tool
Scanner
3
Post Optimization Process
1. Glossary of terms and abbreviations:
FM Fault Management
CM Configuration Management
PM Performance Measurement
Description of the optimization process:
• The RF design audit and optimization has been finished for the region
to be optimized .
In case, one or both pre-requisites are not fulfilled starting with the
performance investigation and troubleshooting does not make much sense.
For troubleshooting and optimizing new clusters, the Drive test and
interfaces’ traces would be more relevant than PMs that may get skewed
because of small number of users.
17
Fault Management:Check any alarms in sites in using
NSP:
1-Right-click on RNC and show alarms
18
From the NodeB:
19
Check the configuration for any errors or
warning regarding unidirectionnel
neighbouring by using WIPS:
1-Import snapshot of the network.
2-Run Checks.
20
Cluster Optimization Process
No No
Change Parameter
Aerial Tuning is necessary Open ticket with when an issue is detected
is necessary
Ticket Treatment
Change Parameter
Process Customer Agreement
Perform New DT
Check, Analyze, post-process DT raw data
Test in mobility conditions in Tours area with NEMO air interface acquisition
Scanner Measurement :
– Scanner to collect measurement on UMTS 2100 Band
23
Counter Based Optimization
Monitoring
Accessibility Retainability
Includes all the steps allowing Defines the ability of the network to
the user to access a particular provide reliable service to the end
service user.
Counter
based KPI
Mobility
Quality
Defines the ability of the network to
Defines the ability of the network ensure UE’s calls continuity.
to provide quality transmission of
the user requested services
Traffic
Yes
Target KPI reached No compulsory optimization
No
(1)No (2)No
Root cause found Open a ticket
Perfrom DT
Yes
Apply corrective actions: HW or parameters change Ticket treatment by high level support
IP
OAM
Call RNC
Trace Iu
Iub NodeB
1-RFO+DT
post processing
SW. Workorders
2-Atmspy in case of
Transport
Layer issue.
ALU 3-RNC internal Traces:
ppc logs,TMU traces. ALU ?
4-E.DAT WiPS Protocol
Analyzer
ALU
Data
Collection SW Counters
A9155 NPO
Scanner
UE
ALU
ALU ALU
GPS
Magnetic
Antenna
PC with
Acquisition SW
INCAR
R99 UE
HSDPA UE: Option datacard (Qualcom
chipset)
Call Trace
Call Traces are activated on the OAM GUI. The log files are stored on the Performance Server.
⇒ Used to trace one or several UE calls.
CTa ⇒ UEs selection based the IMSI or the IMEI.
⇒ Activation on Core Network.
⇒ Used to trace the calls related to only one UE. Possible to trace several UEs
CTb by activating several CTb sessions.
⇒ UEs selection is based: on the IMSI or TMSI or P-TMSI or IMEI.
Most used Call Traces
Trace data related to all elements (events) handled by an object of the network :
A cell or group of cells
OTCell Iu CS interface
IU-CS Iu PS interface
IU-PS One Neighbour RNC or a group of neighbour RNC
IUR One RNC
Launch the Call Trace Wizard for UMTS
A Geographic Call Trace (CTg) session allows to trace a % of the calls established within a geographical
area in the UTRAN specified during the session activation.
The geographical area in the UTRAN is a list of geographical areas in specified RNSs. RNSs are defined
by their RNC Id.
The geographic area in a RNS may be a cell, a set of cells from the RNS, all the cells in the RNS.
There are therefore no UEs identified in a CTg session creation.
Calls may be traced within a CTg as soon as the trace session is activated and exists.
/opt/nortel/data/utran/callTrace/”session
Type”(GeographicalArea,.....)/sessionId/
yyyymmdd/calls
Exemple:
/opt/nortel/data/utran/callTrace/ GeographicalArea/
sessionId/ yyyymmdd/calls
34
RFO (RF Optimizer)
Post-processing Tool to analyse data log files from UE acquisition tools and Call Trace.