Global Purchase (GP) – Spider Material Change

CSHG50010 Spider Top & Low

o Current Raw Material: 2.31 +- 0.04mm (Nippon steel-Japan) SPL HT


SPL HT
o New Raw Material: 2.30 +- 0.05mm (Create Steel Taiwan)

---------------------------------------------------------------------------------------------------------------
o SAC: 2.35 +-0.04 mm (Japan) : Estimate 1 month Stock

To Do list Status Original Dateline Set Remarks


30 pcs each Dimension Check By September done

120 Pcs each For Japan Assembly & In SBM


dimension check
400 pcs each SPL FA submission + Full HT finished 24/9/2018
lot testing
New SAP code + Link By 26 September 2018
BOM+ DCR Drawing
2000 Pcs SPL Stamping done For HT vacuum furnace
Global Purchase (GP) – Spider Material Change
SPL HT (carburizing 
SPL Stamping Quenching  iron Barreling (Additech) Iron Press
temper) Barrel
SPL HT SPL HT

Slitting Checking,
SPL Packing appearance check, spline Electroplating (E.P) Sandblast
check
SBM SBM SBM
To Do list Status Original Dateline Set Remarks
New Material Samples 4Kpcs Top &4kpcs Low Done Stamping completed 1
testing Coil

FA Documents + FA samples Not yet - Current Status still at SBM


Plating (30Pcs)

DCR drawing + SIC FA Not yet End of September 2018 SBM proceeding 120pcs
submission
SPL FA submission Not yet Once SIC approved
Plan change over date for new Mid of October 2018 400 Pcs transferring from SPL
Material HT