BD Textile Audit
C
CHEMICAL PROCESSING SECTION
PROGRESS AUDIT
(ETIDI TEAM)
BY MARKOS
OUTLINES
• Introduction
• Recommendation
• Future plan
• Conclusion
INTRODUCTION
• 1. the machine was visualized in running condition for a period of time and its
output was noted. For the duration of the second stage, the three month (July to
Sept 2018) production and quality report was investigated . During the technical
place .
Single line processing line i.e. Roll to Batch with brushing – desizing
and cold bleaching – pad roll bleaching – dryer integrated washing –
jiggers (2+2+1)- stenter – rotary printing (8 head)- calendaring and CPB
dyeing machine for processing and final inspection (9), folding (3)
stitching and packing machine( 2).
two electrical boilers ( 3.5ton each ( 6 bar) and loose boiler with capacity of 13.5bar.70%
load
carbonate)
Screen designing room equipped latest laser engraving machine (Spy stroke, Austria).
Daily production capacity of 66,000m/day (23000m stenter /shift) in three shift with even
Capacity utilization was 64% ( official three month report 2011 E.C)
weaving section deliver around 18500- 23000 linear meter fabric per day in last three
Activities performed in last visit to Bahir dar textile s.c
s.no. Activities performed in last visit to Progress Remarks
Bahir dar textile s.c
Activities performed in last visit to Bahir dar textile s.c
1. Activities performed in last visit to Bahir In working condition Dust collector not maintained
dar textile s.c
2 Activities performed in last visit to Bahir Not in working condition Not operational
dar textile s.c since then
3 Activities performed in last visit to Bahir Not in continued Due to axial piston of hydraulic
dar textile s.c pump shortage stopped as it is.
4 Activities performed in last visit to Bahir Operation but Circulation pump is not replaced
dar textile s.c Steam leakage maintained yet
5 Activities performed in last visit to Bahir Not maintained Complete machine overhauling
dar textile s.c needed.
6 Activities performed in last visit to Bahir Operational but Complete machine overhauling
dar textile s.c overhauling is not done needed.
yet
s.no.
Conti..
Activities performed and Progress Remarks
recommended
Machine technology
11 APFC BANK