Punchlist Process
Punchlist Process
Punchlist Process
Introduction
Resolution options
• Do nothing
• accept as is and live with the problem since
cost of rectification and impact of deficiency on
functionality is minimal.
• deficiency can be corrected during future
maintenance outages when equipment is
changed out.
• Complete the work to design scope.
• Change the scope by adding or removing.
• Arrange for the deficiency to be addressed by
the Client.
Identification
Validation of Scope
• Necessary for successful progression of
Handovers and Project closure.
Confirmation of Quality
• Ensure that equipment is installed in
accordance with the plant design and is
in a condition to operate safely and
reliably.
Punchlist Walk down Process
Inspect for:
• Completeness
• Quality
• Safe operability
• Maintainability
Representation
Mechanical or Electrical
Category A: Prior to NoE B: Prior to Process Introduction C: Prior to Project completion D: Out of scope
Class 1: EPCM sign off 2: Client sign off
Summary