1. HSE KPI AND HSE PERFORMANCE
PT. ASTA REKAYASA UNGGUL
STARTING FROM AUGUST 01, 2016 UP TO OCTOBER 30, 2016
Period :
No INDICATOR DESCRIPTION TARGET Aug 16 - Sept 16 0
FAT
LAGGING INDICATOR
LTI 0
1 FATALITY 0 0
TRIR : 0.00
LOST TIME INCIDENT FREQUENCY 0
2 0 0 RWDC LTIF : 0.00
(LTIF)
TOTAL RECORDABLE INJURY RATE
3 0 0
(TRIR) MTC 0
4 ENVIRONMENTAL DAMAGE 0 0
5 MATERIAL DAMAGE 0 0 0
FAC
LEADING INDICATOR
1 MAN HOURS 200.000 Hours 63.232 Hours
NMI 0
2 ANOMALY REPORT 30 / Month 105
3 TRAINING 1/ Month 4
MATERIAL DAMAGE 0
4 DRILL 1/ Month 3
5 SAFETY REWARD 1/ Month 4
ENVIRONMENT DAMAGE 0
6 SAFETY TALK Weekly 17
7 DRUG TEST ( 3 Person / Month) 1/ Month 4 (12 Persons) 105
CERMAT
8 MEDICAL CHECK UP 100% 100%
10 CSR PROGRAM 2 0
MANHOURS 63.232
11 HSE MANAGEMENT VISIT 4 2
2. TREND OF CERMAT
PT. ASTA REKAYASA UNGGUL
80 76
1. UNSAFEE ACTIONS
70
1.1. Procedure
1.2. Material Tool and Equipment
60 1.3. Safety System
1.4. PPE
50 1.5. Practices and Behavior
40
30 25 2. UNSAFEE SITUATIONS
2.1. Material Tool and Equipment
20
2.2. Safety System
10 2.3. PPE
4
2.4. Practices and Behavior
0 2.5. Working Environment
Unsafe Acts Unsafe Situations Positif Cermat
CERMAT CLOSED = 89
PT. ASTA REKAYASA UNGGUL
External Confined Space Training External Operator and Rigger MIGAS External Training (Authorizes Gas Test)