Professional Documents
Culture Documents
GL Management Board
GL Management Board
(KPI Board)
F M D S ( a system to foster on-site management ability)
Floor Management Development System
F M D S is based on workplace power
Well~Practice !!!
1. Organize tasks at your own workplace and Clarify “Priority order of things to do”
2. Establish an environment that can be activated
It is effective for improving the workplace power that creates an environment that saves the priority of “what to do” (create a
strong workplace)
FMDS is based on workplace power
It is said that there is workplace skills...
Abnormal-normal is supossed to be visible
KPI board
• Maintenance (stabil/konstan)
}
GL board
• Improvement management
• Change point correspondence
management (henkanten) Activity board
Utilization
K P I GL Board incorparating
Key Performance Indicator : It is the key to practical guidelines
Department,
Division policy It consists of ( 5 Major missions)
target
Sub KPI
Process KPI Sub KPI
Process KPI
(Built-in preventive
flowout by adjusting the
conditions of good • This fiscal year's section, policy/target
crystals)
Goods
• Result indicator of activities to improve sub-KPI
Main result of the activities being tackled
Division policy/Target
(Contruction and
prevention of lekage by
maintenance of good
product conditions)
Goal : Zero defect in post
process • Sub KPI Honey, quantification unresolved living number
Number of next
Target : Precise, quantitative zero flowout
process defects
Fixed quantity
Precision/quality determined), Monthly flowout
assurance
Result Indicator ware/hole (crack etc.)
Pierced hole
17 items (crack etc) How to Improve process KPI...
Form such
as change
PROCESS KPI • Activity to improve process KPI
NUmber of
Number
hole defect
items
(crack etc.) Group activities (activities board)
Deformstion
count Make Specific group activities visible
Structure of Worker
Activity Board
GL
Human Resource
Safety Quality Productivity Cost
Development
No,2
GRAY OBSESSIVE
TL TL TL TL
QUALITY
Responsible : OOTL(No,2) OOTL
PRODUCTION
Responsible : OOTL
HUMAN
RESOURCE
To have a sense of responsibility as
a person in charge DEVELOPMENT Responsible : OOTL
XX prevention activity (1-7 luck • Failure Analysis sheet (Daily occurance reecord, pair)
water ect)
leakage prevention activity • Weathering, prevention recording sheet (prevention of
Construction and prevention of recurrence of heavy items)
leakage by maintenance of • TS worksheet (each group resting place)
good product conditions Trafic rate • Measures for in-process defects (quality gate)
Target : Zero Flowout spill management sheet • Self-process completion certification (falling down) planning
table tema (resting place)
• Process defect situation (occurance cause pursuit activity
(each group resting place)
Fault Analisis Sheet • 2 minutes quality chech sheet (each step)
• Abnormality treatment recording sheet (each group reworking
Main KPI
workbench)
• Change point sheet (Factor port)
defect next process Anti-Corrosion
recording sheet
Water Leak
• Rain routine management check sheet (predetermined position
Powdes preventions activity within group)
• Control chart (water leak) (near process, equipment)
Sub KPI
• TPS improvement
Improvement contents
Productivity proposal for 10
seconds a day
TPS Improvement
content
• Efficiency
Sub KPI
Energy Cost
saving Reduction
Total cost proposal proposal
amount form form
Unabasive activities
Sub KPI
Number of Cost
Unacceptable improvement
energy saving
number , sugestion
proposal
• Total cost, supplementary material cost/month
data (Engineering issue)
Supplementary Labor Cost
material cos
Human Resource Development activity
GL.... Activity Board
Human Resource Development Human Resource Development
Division policy/Target
QC Circle
activity • QC visualization sheet
(QC surfing and improving • QC Note (Theme leader Management)
teamwork through activities)
QC Visulization
Goal : Circle n.hC
QC Visulization
sheet
Main KPI
QC Circle Level
Knowledge, skill improvement activities • Nominated business acquisition schedule chart
• Skills education planning table
• work training plan (safety activities)
Nominated bussiness • Planned year break (production activity port)
Point to be raised acquisition schedule • Safety kansei evaluation sheet (step up activitiy
in tyhe workplace chart port)
Sub KPI
QC award
history
Skills education planning
table
Process KPI
4S QC Theme
Inpection
Motomachi factory total assembly departement Human Resource Development G
The group's activities and the result indicator system Management System
(Taking quality as an example....)
Factory Policy
Departement, Division
Policy Departement Policy
Division Policy
. Engagement
Set Set
Sub KPI ........
Above
Sampling auidit
Inpecstions
.
.
Group Activities Group Activities Group Activities
(Activity Board) (Activity Board) (Activity Board)
Main Manager
Sub-Manager