Rosemount 3051S Electronic Remote Sensors: A Digital Upgrade To A Proven Technology
Rosemount 3051S Electronic Remote Sensors: A Digital Upgrade To A Proven Technology
Rosemount 3051S Electronic Remote Sensors: A Digital Upgrade To A Proven Technology
Wire
Utilizes Proven 3051S
Sensor Platform
DP = PHI – PLO
4-20 mA Two-Wire 4-20 mA Output
with HART
PHI
Improved
Performance
Wire
Simplified
Maintenance &
DP = PHI – PLO Spares Inventory
4-20 mA
Access to New
PHI Information
Synchronized &
Integrated Solution
[File Name or Event]
EmersonSlide 4
Confidential
27-Jun-01, Slide 4
3051S ERS Simplifies Installation Practices
1. Independently install each sensor
1 – Direct-mount without pipe stand, brackets,
and other hardware
– Can be installed by a single instrument tech
2. Wire sensors together
2 – Non-proprietary electrical wire
– Easy to install around catwalks, on
distillation columns, etc.
– Eliminate insulation and heat tracing
3. Perform a system zero trim
1
3 – Establishes true zero-based DP measurement
– No zero elevation calculation required
Condensation
• Corrosion
• Process-coated diaphragm
[File Name or Event]
EmersonSlide 7
Confidential
• Hydrogen permeation
27-Jun-01, Slide 7
3051S ERS Provides Greater Insight Into
Your Process
Scaled Variable
converts DP into
level & volume
measurements
1 Direct
• Manually provide up to 20
“DP vs. Scaled” pairings
25 mbar = 17.9
2 Tank Formulas LITER
• Scaled Variable using basic
tank dimensions
3 Strapping Table
• Scaled Variable using tank
strapping table
[File Name or Event]
EmersonSlide 9
Confidential
27-Jun-01, Slide 9
3051S ERS Provides an Easy, Integrated
Solution
Do-it-Yourself (Two Transmitters) 3051S ERS
PLO
P2
P1
∆P P2 No error from ∆P
change in static
pressure (∆P)
DP DP
P1 PHI
“We have had no lost production and better on-stream operation since installing ERS”
- Tim
[File Name or Event] Anderson, I&E Reliability Team Leader, Chevron Phillips Chemical, Borger, TX
Emerson Slide 11
Confidential
27-Jun-01, Slide 11
Oil Refinery Eliminates Unplanned
Shutdowns on Reactor with 3051S ERS
CHALLENGE
– Frequent, unplanned plant shutdowns
– Caused by plugged lines on pneumatic
transmitter with wet leg
SOLUTION
– 3051S ERS assembly with FFW
flush flanged seals
RESULTS
Application – 100% measurement reliability since
• Alkylation reactor installation (3+ years)
• Level measurement – No work orders or requests for
of effluent liquid troubleshooting
The 3051S ERS assembly with flanged seals was easily retrofitted on the
Alkylation reactor and eliminated unplanned process shutdowns.
[File Name or Event]
Emerson Slide 12
Confidential
27-Jun-01, Slide 12
Austrian Pulp and Paper Mill Decreases
Maintenance Costs with ERS Technology
CHALLENGE
– Excessive maintenance costs on wet leg
installation
• Plugged lines
• Heat tracing
• Vacuum spikes
– Suboptimal black liquor output
SOLUTION
– 3051S ERS system
RESULTS
Application
– Elimination of heat tracing and water
Level measurement
purging
on black liquor vessel
– Increased reliability and repeatability of level
measurement
Zellstoff Pöls Austria was able to address reoccurring maintenance problems and improve
[File Name or Event] their level measurement by upgrading to a 3051S ERS system.
EmersonSlide 13
Confidential
27-Jun-01, Slide 13
Pulp and Paper Mill Reduces Downtime
with Digital 3051S ERS Architecture
CHALLENGE
– Approx. one unplanned shutdown per month
– Pump cavitations
– Reoccurring problems with wet legs
• Plugged impulse lines
• Maintaining level in wet leg
SOLUTION
– 3051S ERS system
RESULTS
Application – Elimination of wet leg
Vacuum tank on lime – Only one shutdown over 2-year period
mud filter
– Process runs in automatic close to 100% of
time
“The continued uptime with this instrument has built operations’ confidence in the
measurement itself and has allowed the process to be run in automatic close to 100% of
[File Name or Event]
Emerson Slide 14
Confidential the time”
27-Jun-01, Slide 14
Biotech Facility Increases Throughput on
Fermentation Vessel with 3051S ERS
CHALLENGE
– Inconsistent batches
– 3-5% measurement error
– Unable to calculate yield
SOLUTION
– 3051S ERS system with hygienic Tank-
Spud seals
Application RESULTS
Level measurement – Measurement error improved to less than <
on enzyme 0.5%
fermentation vessel
– Drastic time response improvement
– Achieved consistent, high-quality batches
SOLUTION
– 3051S ERS with EFW extended diaphragm
seal
RESULTS
– Extended seal used at bottom of tank
eliminated plugging
Application – Digital architecture enabled optimized
• Brine level control
measurement
• 33 ft (10 m) “The ERS system has been
evaporator installed for months, much to our
total satisfaction”
[File Name or Event] - Jean-Marc Deconto, Solvay engineer
Emerson Slide 16
Confidential
27-Jun-01, Slide 16
Chemical Company Eliminates Excessive
Maintenance Costs with 3051S ERS
CHALLENGE
– Excessive maintenance costs:
• Troubleshooting dry leg installation
• Daily field visits to check distillation packing
– Measurement drift from temperature variations
SOLUTION
– 3051S ERS system
Application RESULTS
20 ft (8.3 m) Glycerin – No unplanned shutdowns for over one year
refining tower – Able to accurately monitor health of packing in
tower without manual trips to field
– Eliminated costs associated with
troubleshooting installation
SOLUTION
Application – 3051S ERS system
Level control in silicon
RESULTS
holding tank
– Accurate level measurement
– Achieved consistent batches
– No unplanned shutdowns
Tuned-System™ Assembly
• Sensor sized on DP column only 100
100 • DP Sensor Span = 100 in.H20 in.H20
in.H20
Tuned-
System
Assembly
[File Name or Event]
Emerson Slide 21
Confidential
27-Jun-01, Slide 21
Achieve Success with Rosemount DP Level
in More Places than Ever Before