Mineral Resources and Ore

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 99

MINERAL RESOURCE

AND

ORE RESERVES

ANDRES GOMEZ N
TOQUEPALA AREA FACILITIES
OPERATIONS FLOWSHEET

Drilling and TRUCK DISPATCH


Blasting
Waste / leach
dumps Leach primary
crusher

To leaching pads
Loading
Hauling

Overland conveyor

Concentrator
Ore Transfer
primary crusher
Transport by hopper
Train
EXPLORATION RESULTS

MINERAL RESOURCES ORE RESERVES

Inferred

Indicated Probable
Increasing level
of geological
knowledge and
Measured Proved
confidence

Consideration of mining, metallurgical, economic,


marketing, legal, enviromental, social and
gobernmental factores.

(The “Modifying Factores”)


GEOLOGY

FINANCIAL
MARKETING
LABORATORY

GEOSTATISTICS
ACTIVITY

GEOTECHNICAL

ENVIROMENTAL
METALLURGICAL
INPUT

LEGA, SOCIAL & GOB.


MINING ENGINEERING
EXPLORATION & DATA
COLLECTION

GEOLOGICAL INTERPRE-
TACION & MODELLING

STATISTICAL ANALYSIS,
MINERAL RESOURCE,
ESTIMATION, CLASSI-
FICATION & REPORTING

MODIFYING FACTORS
(M-M-M, E, E, L, S, G)
ORE RSERVE ESTIMATION,
THE ORE RESERVE ESTIMATION PROCESS

CLASSICATION &
REPORTING (Risk and
sencitivity assessments)

GRADE CONTROL, PRODU-


CTION & RECONCILIATION
Interactions of Technical, Financial and Risk Assessments

(monitoring resources and


reserves)
1 CAMPAIGNS OF PERFORATION
64000

Perforación 63000
en Mina SPCC
GERENCIA MINA

1938 - 2004 SUPERINTENDENCIA


GEOLOGIA

Churn Drill Holes


Reverse Circulation Holes
550000

Diamond Drill Holes


Record of Perforation

Campañas de Perforación N° Taladros Perforado (m)


Metros Perforados 1938 a 1994 439 120,318.75
Metros Perforados 1995 a 1999 225 94,838.43
Metros Perforados 2000 a 2001 110 50,153.65
Metros Perforados 2002 26 7,962.56
Metros Perforados 2003 27 4,375.63
Metros Perforados 2004 21 6,329.49
Total 848 283,978.51
Churn Drill Holes
Reverse Circulation Holes
Diamond Drill Holes

64000

Perforación 63000
en Mina
1938 - 2004
550000
RECORD OF PERFORATION
AÑOS OBJETIVOS N° TAL LONG (m)

MAY´2001 DEVELOPMENT PLAN 2001-2015 (PDD) 37 18,496.26

2000 LEACH & ORE RESERVES-GEOTECHN-CONDENATION - PDD 64 29,503.34

1998-1999 LEACH & ORE RESERVES 107 49,581.30

1997 GEOTECHNIC/INFILL 34 8,293.57

1996 ORE BODY DELIMIT-GEOTECHN. 65 29,818.87

1995 ORE BODY DELIMIT 24 10,137.36

1994 ORE BODY DELIMIT-GEOTECHN. 32 10,113.09

1993 ORE BODY DELIMIT 40 13,528.02

1981-1987 INFILL DRILLING PIT 37 6,382.41

1973-1980 INFILL DRILLING PIT 98 29,903.15

1962-1970 INFILL DRILLING PIT 57 11,269.77

1938-1952 EXPLORATION 175 49,122.31

TOTAL 770 266,149.45

Churn Drill : 9%, RC : 13%, DDH : 78%


TALADROS EN PIT FINAL

SPCC
GERENCIA MINA
SUPERINTENDENCIA
GEOLOGIA

< 0.1% Cu
0.1 - 0.4% Cu
0.4 - 0.8% Cu
> 1.00% Cu
DRILLING AROUND THE PIT

OBJECTIVES:
• Geotechnic and Civil
Engineering
• Hydrology
• Pit's Delimitation
• Peripheral Exploration
Perforación Periférica
Percussion rotary air blast drilling
AUGGER DRILL
CHURN DRILL
REVERSE CIRCULATION DRILL
REVERSE CIRCULATION DRILL
DIAMOND CORE DRILL
2. LOGGINGS
ROCK CODE
TIPO DE ROCA SIMBOLO CODIGO
Alta Andesita Aa 1
Toquepala Riolita Tr 2
Toquepala Andesita Ta 3
Toquepala Cuarzo Porf. Tq 4
Toquepala Dolerita Td 5
Quarzo Quellaveco Qq 6
Latita Porfiritica Lp 7
Dacita Aglomeradica Da 8
Dacita Porfiritica Dp 9
Diorita Di 10
Slump Brecha SBx 11
Brecha Diorita DiBx 12
Brecha Angular Bx 13
Brecha Turmalina BxT 14
Pebble Brecha Px 15
Material Relleno Fi 16
3. DATE BASE MANAGMENT
THE BASIC FILES ARE :
DATAMINE-AGOMEZ.XLS
COLLARS CTRL-c INFORMACION
SURVEYS CTRL-s
TOPOGRAFICA

ASSAYS CTRL-a DATOS DEL


GEOLOGYS CTRL-g
MUESTREO

CONTOURS CTRL-t
INFORMACION GEOLOGICA
DATOS DE CURVAS DE NIVEL
COORDENADAS DEL COLLAR DE LOS TALADROS
COLLARS

ESTE NORTE COTA


IDENTIFICADOR COORDENADAS
DEL TALADRO
SURVEYS

IDENTIFICADOR AZIMUT DEL


DEL TALADRO TALADRO
PROFUNDIDAD AL CUAL
CAMBIA DE INCLINACION EL ANGULO DE
TALADRO INCLINACION
GEOLOGYS

IDENTIFICADOR
DEL TALADRO HASTA
TIPO DE
DESDE LITOLOGIA
ASSAYS

IDENTIFICADOR LEY DE AU
DEL TALADRO
DESDE HASTA LEY DE CU
CONTOURS

VALOR
ESTE NORTE COTA COLOR

NUMERO DE
GRUPO
4. DATA BASE PROSSESSING
CS MINE
MEDSYSTEM
MICROLYNX
PC MINE
GEMCON
SURPAC
DATA MINE
MINESIGHT

3
BHID
(ALFANUMERICO)

ZCOLLAR
NUMERO

YCOLLAR
NUMERO

XCOLLAR
NUMERO
5. GEOLOGICAL
CHARACTERIZATION
BLOCK MODEL
Project Limits :

Coordenada Mínimo Máximo Tamaño Bloques

X (Este) 548,000 553,000 20 250


Y (Norte) 61,000 66,000 20 250
Z (Elevación) 2,200 3,700 15 100

Size of Block: 20 x 20x 15

Total : 250 x 250 x 100 = 6´250,000 blocks


Rock Model
N
Tr
Ta
Tq
Td Fill 364
Qq Lp
Di Da

Di Dp
Bx
BxT
2200

Aa

N
N
Mineralization model

Leyenda

Relleno

Lixiviada

Enriquecida

Transicional
N
Primario
Alteration model

Leyenda

Relleno

Propilica

Fílica

Fílica Potásica

Roca Fresca

Pit Final
N
Mineralization

Tope de Yeso:
Nivel 3085 Oeste

Fondo, no determinado.

Tope de Yeso controlado por fallas


verticales con desplazamiento de
bloques.

Contenido de CaSO4 hasta 20%


de contenido en la roca, tanto en
venillas como en matriz. N
Geological Map of Deposit

SECCION
P

Toquepala Alignment
M
ica
la
co
Fa

 

 
ul



  




t


  



Cross section
6. MATHEMATICAL
CHARACTERIZATION
ANALISISStatistical
ESTADISTICOAnalysis
DE PESO ESPECIFICO
tm/m3
Tipo Roca Simbolo Promedio Mínimo Máximo
Alta Andesita Aa 2.566 1.790 2.760
Toquepala Riolita Tr 2.586 2.350 2.720
Toquepala Andesita Ta 2.699 2.580 2.810
Toquepala Cuarzo Tq 2.619 2.280 2.747
Toquepala Dolerita Td 2.716 2.420 2.919
Cuarzo Quellaveco Qq 2.643 2.350 2.860
Latita Porfiritica Lp 2.661 2.556 2.707
Dacita Aglomeradica Da 2.610 2.380 2.778
Dacita Porfiritica Dp 2.655 2.366 2.830
Diorita Di 2.676 2.000 3.214
Brecha Diorita Bx-Di 2.679 2.550 2.910
Brecha Angular Bx 2.651 2.050 3.099
Brecha Turmalina BxT 2.652 2.545 2.810
Pebble Brecha Px 2.625 2.419 3.162
Rocas en zona de Yeso
Dacita Aglomeradica Da-g/a 2.661 2.480 2.795
Dacita Porfiritica Dp-g/a 2.723 2.000 2.969
Diorita Di-g/a 2.768 2.370 2.990
Brecha Diorita BxDi-g/a 2.773 2.590 2.930
Brecha Bx-g/a 2.737 2.480 3.221
Brecha Turmalina BxT-g/a 2.727 2.560 2.860
Pebble Brecha Px-g/a 2.704 2.520 2.820

Promedio en Zona de Yeso 2.742 2.100 3.221


Promedio en Zona Fuera de Yeso 2.656 2.000 3.214
Statistical Analysis
GROUP MINERAL ROCK MINERAL + ROCK AVG STD MIN MAX N CV AVG + STD AVG + 2*STD AVG + 3*STD
C01 310 1,2,3,4,7,8 (P)-(Aa,Tr,Ta,Tq,Lp,Da) 0.108 0.152 0.002 1.226 718 1.400 0.260 0.411 0.563
C02 311,312,313 1,2,3,4,7,8 (T,E,Lc)-(Aa,Tr,Ta,Tq,Lp,Da) 0.093 0.246 0.001 3.028 547 2.600 0.340 0.586 0.832
C03 310 5,6 (P)-(Td,Qq) 0.141 0.138 0.007 1.720 858 1.000 0.279 0.417 0.555
C04 311,312,313 5,6 (T,E,Lc)-(Td,Qq) 0.315 0.399 0.005 3.248 650 1.300 0.714 1.113 1.512
C05 310 10 (P)-(Di) 0.323 0.282 0.003 2.727 4371 0.900 0.604 0.886 1.167
C06 311,312 10 (T,E)-(Di) 0.738 0.801 0.024 7.418 911 1.100 1.539 2.340 3.142
C07 313 10 (Lc)-(Di) 0.035 0.029 0.001 0.243 398 0.800 0.064 0.093 0.122
C08 310 9,11,12,13,14,15 (P)-(Dp,Sbx,DiBx,Bx,BxT,Px) 0.690 0.439 0.009 5.260 5543 0.600 1.130 1.569 2.008
C09 311,312 9,11,12,13,14,15 (T,E)-(Dp,Sbx,DiBx,Bx,BxT,Px) 1.097 1.010 0.011 8.108 1047 0.900 2.108 3.118 4.129
C10 313 9,11,12,13,14,15 (Lc)-(Dp,Sbx,DiBx,Bx,BxT,Px) 0.045 0.035 0.003 0.250 292 0.800 0.080 0.115 0.150

VARIABILITY OF TCU GRADES


9

% 5
Cu
4

0
C01 C02 C03 C04 C05 C06 C07 C08 C09 C10
MAX 1.226 3.028 1.720 3.248 2.727 7.418 0.243 5.260 8.108 0.250
AVG 0.108 0.093 0.141 0.315 0.323 0.738 0.035 0.690 1.097 0.045

AVG + STD 0.260 0.340 0.279 0.714 0.604 1.539 0.064 1.130 2.108 0.080
AVG + 2*STD 0.411 0.586 0.417 1.113 0.886 2.340 0.093 1.569 3.118 0.115
AVG + 3*STD 0.563 0.832 0.555 1.512 1.167 3.142 0.122 2.008 4.129 0.150

ROCK & MINERALIZACTION


PERFORATION PROGRAM 2002
GRADE MODEL

> 1.0% Cu
GEOSTATISTICS
09 Geostatistic
types
2
2 4
3 9
Rock 1
6 8
+ = 5
7
Mineralizatión
VARIOGRAM PARAMETERS
Copper Variogram

Eje a Eje b

C06 Range Nugget Parcials Sill Parcials


a 160 0.0023 0.368 0.27507 44.0112
b 160 0.0023 0.368 0.29959 47.9344
c 130 0.06121 7.9573 0.22493 29.2409
Average 450 0.019318 0.269303

Mean value of Nugget and Sill.


Eje c
GEOSTATISTIC ANALYSIS
Variograms of Cu
Grupo C0 C Sill Rango Rango Rango Eje Mayor Tipo
Mayor Menor Vert. Az Plunge Dip
C01/02 .00294 .01123 .01417 170 170 170 0 0 0 Global
C03 .00092 .00865 .00957 200 160 130 135 0 0 Direcc.
C04 .01246 .08477 .09723 130 115 121 45 0 0 Direcc.
C05 .00473 .02235 .02708 192 192 192 0 0 0 Global
C06 .01932 .24999 .26931 160 160 130 135 0 0 Direcc.
C07 .00010 .00021 .00031 100 85 130 0 0 0 Direcc.
C08 .02310 .06704 .09014 157 157 157 0 0 0 Global
.03904 .12918 432 432 432 0 0 0
C09 .12568 .41727 .54295 216 200 135 135 0 0 Direcc.
C10 .00028 .00051 .00079 182 170 70 135 0 0 Direcc.

Variograms of Mo
Grupo C0 C Sill Rango Tipo
M01/M02 0.313 0.687 1.000 140.0 Normalizado
M03/04 0.200 0.600 0.800 134.1 Normalizado
M05 0.172 0.724 0.896 220.0 Normalizado
M06 0.042 0.792 0.834 190.0 Normalizado
M07 0.032 1.419 1.451 180.0 Normalizado
M08 0.251 0.662 0.913 144.0 Normalizado
M09/10 0.184 0.934 1.118 179.8 Logaritmico
Copper Model

SPCC
GERENCIA MINA
SUPERINTENDENCIA
GEOLOGIA
< 0.1% Cu
0.1 - 0.4% Cu
0.4 - 0.8% Cu
> 0.8% Cu
MODELOS GEOLOGICOS
1 Roca* 4 Yeso
Block Models
2 Alteración* 5 Dureza - RHI
3 Tipo de Mineral* 6 Z. Geometalúrgicas

Grade Model
MODELOS DE LEYES
1 CuT* 8 Py/Cpy
2 Mo* 9 Ag
3 OxCu* 10 Pb
4 I.S. 11 CO3
5 I.S.Ac 12 As
6 I.S.Cn 13 Zn
7 FeSAc 14 Al2O3
8. RECOVERY ESTIMATION
Ecuaciones de Recuperación
• Concentradora

La recuperación de cobre está sustentada en pruebas


de flotación llevadas a cabo por concentradora

Estos resultados son validados por el consultor:

Modelo de recuperación

Parámetros principales:

• Recuperación de cobre : %Cu, Ag, y factor de


disponibilidad de planta concentradora.

• Recuperación de molibdeno : %Mo , % Fe


Ecuaciones de Recuperación
• Lixiviación
Pruebas de lixiviación en columnas - 34 muestras.

Se obtienen ecuaciones de recuperación en función


del tiempo y el índice de solubilidad.

Para efectos del cálculo, el tiempo total de proceso


fue fijado en 15 años y descontados a una tasa de
9.5 % anual.

Se tienen formulas para diferentes alturas de capa


así como para material triturado.

Resultados validados por la consultora: Mountain


States Research and Development International.
Modelo Geometalúrgico
GEOMETALLURGICAL MODEL
9. ECONOMIC PARAMETERS
Parámetros Económicos
Cargado Contra
$/ Tm
Costos Base de Minado Material Total
Perf. & Voladura
Carguío
Acarreo por Camiones
Carreteras & Botaderos
Gastos Generales Operacionales
Capital de Reposición de Mina
Capital de Mantenimiento Mina
Costos Indirectos Variables
Cargado Contra
$/ Tm
Costo de Minado - Mineral Tm . Mineral
Acarreo por Trenes
Costos Indirectos Fijos
Capital de Administración Mina, Fund, Ref
Capital de Reposición - Fundición
Capital de Reposición - Refinería
Costos Indirectos - Fundición
Costos Indirectos - Refinería
Costos Directos Fijos - (Super. - Mina)
Costos Directos Fijos - (Super. - Fundición)
Costos Directos Fijos - (Super. - Refinería)
(+) Costo Base de Minado
• Costo de Acarreo incremental por Banco = 0.011 US$
Parámetros Económicos
Cargado Contra
$/ Tm mineral
Costo de Concentradora - Mineral Mineral
Costo Directo de Operación
Costo Indirecto
Costo Directo Fijo (Supervisión)
Capital de Reposición
Capital de Administración
Cargado Contra
$/ lb
Fundición- Total /Lb Lbs de Cobre Fino
Costo Directo
Crédito - Planta de Acido
Cargado Contra
$/ Lb
Refinería -Total /Lb Lbs de Cobre Fino
Costo Directo
Crédito - MP
Ventas
Regalías mineras
Parámetros Económicos
Cargado Contra
$/ Tm
Costo de Lixiviación Tm. Lixiviable
Costo Directo de Operación
Capital de Reposición

Costo Directo (Supervisión)


Costo Indirecto

Cargado Contra
$/ Lb
Costo del Cobre Catódico Lbs de Cobre Fino
Costo ESDE
Capital de Reposición
Costo Directo Fijo (Supervisión)
Costo Indirecto

Regalías mineras
10. ECONOMIC MODEL
ECONOMIC MODEL
Project Limits :

Coordenada Mínimo Máximo Tamaño Bloques

X (Este) 548,000 553,000 20 250


Y (Norte) 61,000 66,000 20 250
Z (Elevación) 2,200 3,700 15 100

Size of Block: 20 x 20x 15

Total : 250 x 250 x 100 = 6´250,000 blocks


11. GEOTECHNIC PARAMETERS
Geotechnic Parameters
Geotechnic Parameters
SOBRE EL LIMITE DE YESO/ANHIDRITA
DOMINIOS VOLCANICOS DACITA AGL. DAC. PORF DIORITA BRECHA DEFAULT
Nro.
ROCAS ( 1 - 6) (7 - 8) 9 10 (11 - 15)
1 ESTE-SUR 2 2 2

COD. MED

ANGULO
2 ESTE-CENTRO 2 2
5 Z. TOQUEPALA 01 10 12 12
6 NOR-OESTE 9 11 9
7 N-O GRAVEN 5 4 4
8 OESTE >=3220 6 2 5 1 37
8 OESTE < 3220 6 9 5 2 38
9 Z. COLA DE CABALLO 9 6 5 6
10 ZONA MICALCO 3 39
11 ESTE - NORTE 2 2 2 2 4 40
12 DACITA 6 6 6
13 Z. TOQUEPALA 02 7 10 5 41
BAJO EL LIMITE DE YESO/ANHIDRITA 6 42
DOMINIOS VOLCANICOS DACITA AGL. DAC. PORF DIORITA BRECHA DEFAULT
ROCAS ( 1 - 6) (7 - 8) 9 10 (11 - 15)
7 43
1 ESTE-SUR 7 7 8 44
2 ESTE-CENTRO 7 7
5 Z. TOQUEPALA 01 10 12 12
9 45
6 NOR-OESTE 12 12 10 46
7 N-O GRAVEN 12 9
8 OESTE 8 12 6
11 47
9 Z. COLA DE CABALLO 9 12 5 9 12 48
10 ZONA MICALACO 12 12
11 ESTE-NORTE 7 7 7 7
12 DACITA 6 6
13 Z. TOQUEPALA 02 10 9 10
Parámetros geotécnicos

38
38

45
42

41 45 42 38
46 38 38
48 43
44 43
42 48 46
48 43 38
38
48 42
38 43

46 38
48 38
46

38
12. GEOTECHNIC MODEL
GEOTECHNIC MODEL
13. PIT OPTIMIZATION
PIT OPTIMIZATION

3640

3550

2200

3250

Tajo económico final sin rampas


FINAL PIT OPTIMIZATION
Economic Pit - Cross Section

Sección vertical N 63,500

1.00 0.70 0.40 .095 0.00 $ 0.70 Cu $ 1.00 Cu $ 1.30 Cu


% CU $ 0.80 Cu $ 1.10 Cu Topo
$ 0.90 Cu $ 1.20 Cu
FINAL PIT OPTIMIZATION

Sección Nivel 2980 Sección Nivel 2620

1.00 0.70 0.40 0.10 0.00 $ 0.70 Cu $ 1.00 Cu $ 1.30 Cu


% CU $ 0.80 Cu $ 1.10 Cu Topo
$ 0.90 Cu $ 1.20 Cu
FINAL PIT OPTIMIZATION
Sensitivity analysis

Precio US$/lb Cutoff % Mineral % Cu Lixiviable % Cu Waste Total TM S.R.

0.70 0.482 439,816 0.764 836,782 0.239 543,833 1,820,431 3.1

0.80 0.412 984,354 0.682 1,683,467 0.213 2,171,672 4,839,493 3.9

0.90 0.360 1,325,663 0.641 1,864,110 0.199 3,055,380 6,245,153 3.7

1.00 0.319 1,864,951 0.602 2,178,566 0.189 4,829,725 8,873,242 3.8

1.10 0.287 2,277,839 0.571 2,206,110 0.180 5,824,709 10,308,658 3.5

1.20 0.260 2,704,035 0.539 2,114,425 0.169 6,645,402 11,463,862 3.2

1.30 0.239 3,094,470 0.515 1,971,165 0.160 7,421,261 12,486,896 3.0


14. OPERATIVE PIT DESING
OPERATIVE PIT DESING

2485
PAD DESING
Bot. 3490-W Bot. 3575-W
Bot. 3585-W
Bot. 3425-W
Bot. 3565-W
Bot. 3430-L
Bot. 3490-W
Bot. 3570-W

Bot. 3575-W
Bot. 3400-W

Bot. 3460-W

Bot. 3460-W

Bot. 3430-W

Bot. 3430-W
Bot. 3345-W

Bot. 33450-W -
F05

Bot. 3250-W

Bot. 3055L

Bot. 3055L
15. ORE RESERVES
MINERAL RESOURCES ORE RESERVES

Inferred

Indicated Probable
Increasing level
of geological
knowledge and
Measured Proved
confidence

Consideration of mining, metallurgical, economic,


marketing, legal, enviromental, social and
gobernmental factores.

(The “Modifying Factores”)

You might also like