The document provides a schedule for testing various systems at a power receiving station from April to July. It outlines the testing of high voltage equipment including 500kV power receiving, gas insulated switchgear, circuit breakers, and protection relays. It also includes schedules for testing backup generators and UPS systems, fire suppression systems, control and automation systems, metering equipment, and ensuring overall safety and interlocks are functioning properly. The schedule is comprehensive, covering main electrical infrastructure and auxiliary systems, with 60 of the planned 60 tests completed as of the date of the document.
The document provides a schedule for testing various systems at a power receiving station from April to July. It outlines the testing of high voltage equipment including 500kV power receiving, gas insulated switchgear, circuit breakers, and protection relays. It also includes schedules for testing backup generators and UPS systems, fire suppression systems, control and automation systems, metering equipment, and ensuring overall safety and interlocks are functioning properly. The schedule is comprehensive, covering main electrical infrastructure and auxiliary systems, with 60 of the planned 60 tests completed as of the date of the document.
The document provides a schedule for testing various systems at a power receiving station from April to July. It outlines the testing of high voltage equipment including 500kV power receiving, gas insulated switchgear, circuit breakers, and protection relays. It also includes schedules for testing backup generators and UPS systems, fire suppression systems, control and automation systems, metering equipment, and ensuring overall safety and interlocks are functioning properly. The schedule is comprehensive, covering main electrical infrastructure and auxiliary systems, with 60 of the planned 60 tests completed as of the date of the document.
The document provides a schedule for testing various systems at a power receiving station from April to July. It outlines the testing of high voltage equipment including 500kV power receiving, gas insulated switchgear, circuit breakers, and protection relays. It also includes schedules for testing backup generators and UPS systems, fire suppression systems, control and automation systems, metering equipment, and ensuring overall safety and interlocks are functioning properly. The schedule is comprehensive, covering main electrical infrastructure and auxiliary systems, with 60 of the planned 60 tests completed as of the date of the document.
Test Procedure (04/01~5/31) DC/UPS (05/14~5/29) FMS System (06/18~06/30)
● 500kV power receiving ● Temp EDG 설치 (Panel 포함) ● FMS Function & Alarm test Note ● MV & LV SWGR ● UPS Function test ● GCB & IPB Air Pressurize unit ● Battery Charger Function test 미착수 (0) ● GSU TR & UAT TR ● Battery Discharge/Recharge test Tariff Meter System (06/19~06/21) 진행 중(0) ● Fault Monitoring System ● Main DB & Local panel 가압 ● SCADA system ● Tariff Meter Sealing 완료(60) ● 500 KV CT, PT (VMI) test 지연 (0) ● Step touch up voltage test Transmission (05/28~06/01) ● Primary injection test ● Gantry Tower & Overhead line (Total=60, Overall Interlock (06/25~06/27) ● Overall interlock test ● Protection relay test Inspection with EVN ● Interlock & tripping test 완료율 100%) ● DCS (Electrical) test etc.
Protection Relay for TRs (05/28~06/06)
GSU TR & UA TR (04/10~04/25) ● Internal Wiring Check HVAC & Fire Fighting system ● CT & VT test ● GSUT Main & Backup (05/01~06/30) ● Secondary injection test ● UAT A Main & Backup ● HVAC (Temp A/C if permanent ● Primary injection test ● UAT B Main & Backup not ready ● Cooling Fans Auto operation test ● Overall ● Fire Fighting operation test ● Ground continuity test ● Line Protection Main & Backup ● Signals end to end test ● IR test Primary Injection Test (06/28~06/29) Power Receiving ● Stability Test RTCC (06/07~06/11) ● Final Site inspection with EVN ● RTCC panel Function Test Power Receiving (7/17) MV SWGR (05/02~05/24) ● CT & PT Test SCADA (06/25~06/29) ● VCB Test Ground Test (06/11~06/15) ● Meter & Transducer Test ● End to End communication test with ● Protection Relay Test ● Grounding Test (Step & Touch Up) EVN ● Secondary Injection Test ● Primary Injection Test ● Bus Bar Test IPB & GCB (06/01~06/15) Safety (07/01~07/05) ● IPB Test LV SWGR (05/08~06/09) ● GCB Function Test ● Safety Sign & LOTO ● CT & PT Test ● ACB Test ● Meter & Transducer Test ● Protection Relay & EOCR Test DCS (06/11~06/25) ● Secondary Injection Test ● DCS Parameter Setting ● Mold TR & Dry TR Test ● DCS interlock & trip test ● Bus Bar Test