EVALUATION AND

DESIGN OF SEWAGE
TREATMENT PLANT IN
DHVTSU (MAIN
CAMPUS)
INTRODUCTION
STATEMENT OF THE PROBLEM

• Primary treatment of current septic tank


system

• Outlets of septic tanks are directed to


drainage

• Unsealed bottom of tanks


OBJECTIVES
MAIN OBJECTIVE

- design the sewage treatment plant


of Don Honorio Ventura
Technological State University (Main
Campus).
SPECIFIC OBJECTIVES
• To determine the wastewater quality of the
university if it complies with the DENR DAO 16-08.

• To compute for the wastewater volume generated by


the university.

• To design the sewerage pipe system that will


transport the wastewater into the treatment facility.

• To design the tanks that will carry the wastewater to


be treated as well as the electromechanical process.
SIGNIFICANCE OF
THE STUDY
• For improvement of sewage disposal of the
university.

• To allow the school to reuse the treated water.

• To help the school to safely discharge its


wastewater with the standard quality to a
receiving body.

• For future researchers to improve or discover


new technology to be used for sewage
treatment.
SCOPE AND
DELIMITATION
• Population of DHVTSU and equivalent
wastewater generation

• Proposed location

• Focuses on the domestic sewage generated


by the entire university

• Water Quality Sampling/Testing


- DAO 2016-08

• Design of sewerage pipe system


• SBR was the method used

• Assumed septic tanks are completely sealed at


the bottom

• Land Surveying was also conducted to


determine the elevation of the possible route
of the sewerage system of the facility.

• Does not include electrical and mechanical


processes
CONCEPTUAL
FRAMEWORK
IDENTIFY THE PROBLEM

GATHER DATA

WASTEWATER
WATER QUALITY
VOLUME
TESTING
GENERATION
INTERPRETATION OF
DATA

DESIGN OF SEWAGE PIPE SYSTEM

DESIGN OF SEWAGE TREATMENT


FACILITY

COST ESTIMATION