Adaptable Drainage System

Secure The Bag:


Kayla Gerken
Ryuji Aoki
Abby Bromenschenkel
Conner Helbling
Introduction
Project Summary

Develop a safe and cost-effective solution that will improve efficiency and fluid capacity of
the RenovaRP Paracentesis Management System, while also implementing system-
specific elements.
Feasibility Criteria (modular approach)
● Maintain current function
● Maintain patient and user safety

● Minimize interactions with the


system
● Prevent bag overflow

● Implement system specific


components to reduce competition
Merit Criteria (modular approach)

Criteria Weighting (%)


Number of Interactions 30%
Ease of Copying 30%
Durability and Lifetime 20%
Cost 10%
Size 10%
Electrical
Adaptable Subsystem
Drainage System
Patient
Estimate fluid volume

Place needed bags on Bag


hanger Hanger
Subsystem

Connect all tubing and


bags together

Connect Electrical Bag & Tube


Subsystem Subsystem

Turn on
Electrical Subsystem
- System Representative Platform

Circuit
Slots for components
connector LED Contact
points
LED leading
to circuit

Exterior Surface Interior Surface


of Machine Wall of Machine Wall
Electrical Subsystem
- Connector with Wire

Tubing
from Pathway
Tubing to patient for tubing
drainage
bags

Metal strip

Metal strip

Cross-Sectional View
Electrical Subsystem
- Circuit Completed

LED: On when
Tubing from connector in place
patient
Tubing to Connector
drainage legs secured
bags on ledges

Exterior Surface Interior Surface


of Machine Wall of Machine Wall
Bag and Tube Subsystem
- Drainage Bag
Bag and Tube Subsystem
- Outlet
Bag and Tube Subsystem - Connections

Check Valve Female Luer Male Luer Lock


(0.217 Cracking Lock to Barb to Barb
Pressure)
Fluid Flow
Process
Fluid moves from
patient to
machine to first
drainage bag
Once fluid level
reaches 1.4L,
check valve
opens Fluid begins
filling next bag
until Cracking
Pressure is
reached Drainage
continues until
desired amount
of fluid is drained
Hanger Subsystem
● Holds drainage bags
● Adaptable for various hospital
equipment
○ Support Hooks
○ Clamps
Hanger Subsystem
● Holds up to 8 bags
● Dimensions
○ 410 mm (16 in) x 618
mm (24 in)
● Reusable
● Portable
Budget

Item Estimated Cost ($)


Electrical Subsystem $85.13
Bag & Tube Subsystem $120.18
Hanger Subsystem $122.17
Total $327.48
Conclusions and Recommendations
● Test check valve accuracy
● Test fluid flow through inlet and outlet tubes
● Test tipping possibilities
● Test consistency of electrical contact when connector is in place

We request permission to proceed with prototyping and


then to deliver this design to the client.
Questions?