Gulf Sky Cranes & Cont. Co. Ltd.

Plant Maintenance Division


Jubail.
Introduction

We take this opportunity to introduce ourselves as one of the leading


ISO 9001-2008, OSHAS 18001:2007 & ASME certified company for Construction,
Fabrication, Erection, Plant Maintenance & Heavy Equipment Rental Services in
the Kingdom of Saudi Arabia. GSCC is a hundred percent Saudi Company,
actively engaged in the various projects since many years. GSCC has developed
progressively and expanding their equipment fleet and fabrication work shop with
latest technological equipment and machineries to meet the present market
requirements.
GULF SKY CRANES & CONT. CO. LTD

OUR NATURE OF BUSINESS

 Mechanical Construction Works : Installation of Steel Structure, Piping Works, Equipment’s


and Cladding Works.

 Engineering and Fabrication of different kind and size of Steel Structures, Piping Spools, Pressure Vessels,
Tanks and Misc items.

 Erection of Steel Structures, Piping & Equipment for Power Sector, Petrochemical, Oil & Gas, Steel Plants,
Aluminum Plants & Fertilizer.

 Plant Maintenance for Sabic & Non-Sabic Industries, Aramco & Other Industries in Kingdom of Saudi
Arabia.

 Heavy Equipment Rental Services with qualified operators, Rigger Level –I, II & III with Lifting Plans.

 Materials Transportation Services.


GULF SKY CRANES & CONT. CO. LTD

OUR STRENGTH
•We have Fabrication shop with capacity of approx. 1000 MT mixed structures and 20,000/- inch dia
piping spools fabrication and various sizes of Pressure Vessels & Tanks per month.

•We are ISO 9001-2008 & OHSAS 18001-2007 Certified company.

•We are approved company by ASME for ‘U’ & ‘R’ Stamp and by National Board for ‘NB’ stamps.

•We have around 50 nos. mobile cranes ranging from 35 ton to 400 ton capacity.

•Our all cranes with operators are certified by Aramco, Sabic & Third Party.

•We have certified Riggers Level- I, II & III.

•We have our own Transportation facilities including Low bed trailers up to 110 tons capacity.

•We have Engineering capability with qualified Engineers/ Auto Cad Operators.

•Having Professional team of qualified & experienced Managers, Engineers/Supervisors & Technicians.

•Qualified & Experienced Team of Safety, Quality & Planning Professionals.


GULF SKY CRANES & CONT. CO. LTD

OUR STRENGTH

•ARAMCO / Third Party Approved Rigger –Level-01


•ARAMCO / Third Party Approved Rigger –Level-02
•Aramco / Third Party Approved Riggers- Level-03
•Aramco/ Third Party Certified Permit Receivers
•Aramco / Third Party Approved Man lift Operators
•Aramco / Third Party Approved Crane Operators
•Aramco / Third Party Certified Welders
GULF SKY CRANES & CONT. CO. LTD

Future Plan for Developing our capacity/facility


 We have taken another land of 20,000 sq. m in Jubail close to our present set up/
facility.
 Developing the facility of Fabrication, Blast cleaning & Paining.
 Fabrication facility with CNC machine.
 Our total capacity of fabrication of structural (Heavy, Medium & Light mixed) will be
2500 MT per month,
 Approximate 35,000 inch dia piping spool fabrication per month,
 Fabrication of Tanks, Pressure Vessels, Silo & Other similar jobs.
 We are increasing our strength of manpower from 1025 to 1500 by March 2013 and
recruiting the personnel from South Asian countries & Philippines accordingly to cope
up the requirement of Construction.
We have planned to purchase more cranes, trailers & other fabrication machines by
end December 2012.
GULF SKY CRANES & CONT. CO. LTD

REGISTRATION WITH CLIENTS & GOVERNMENT

Gulf Sky Cranes & Cont. Co. Ltd. is registered with following Clients under Vendor Registration no. as given below:

Clients Vendor Registration no.

 SABIC and its affiliated companies 503148


 Saudi Aramco 10042506
 Saudi Chevron 125128
 Royal Commission 12931
 Saudi Kayan 118093
 Tasnee 102252
 Sipchem 102271
 Arabian Alkali Company (Soda, Nama) 102362
 Sahara Petrochemical Co. 10611
 Saudi Electricity Company 61550
 Zamil Steel 4752
 Sinopec 5008080012
 Samsung Engineering Registered
 Samsung C & T Registered
 Daelim, Korea Registered
 China Railway Registered
 Ma’aden Registered
 Chemanol 2809
 JGC Gulf International C555
 GSCC C R No. 2055008217
 GSCC Chamber No. 96880
List of Major Equipments , Tools & Tackles
1.Cranes (35 Ton to 400 capacity) 50 nos.
2. Trailers (upto 110 Ton capacity) 5 nos.
3. Boom Truck 3 nos.
4. Fork lifts 5 nos.
5. Gantry Cranes (20 ton & 10 ton capacités) 2 nos.
6. Welding machines 175 nos.
7. Diesel welding machines 15 nos.
8. Vertical Drilling Machine up to 80 mm diameter 2 nos.
9. Magnetic drill machines 25 nos.
10. Hand drill machines 70 nos.
List of Major Equipments , Tools & Tackles
11. Plate bending machine up to 16 mm thickness 1 no.
12. Plasma cutting machine for SS 2 Set
13. Compressor 6 nos.
14. Blast Cleaning machine 3 nos.
15. Painting machines 4 nos.
16. Grinding machines 125 nos.
17. Gas cutting sets 50 nos.
18. Bench grinders 11 nos.
19. Pipe threading machine 10 nos.
20. Pipe bending machine 3 nos.
Manpower Resources
GSCC is having qualified team of Managerial, Supervisory and Multi-disciplinary
Technical personnel with vast experience in their respective fields.

The following is the Summary of GSCC manpower strength presently available within the
Kingdom of Saudi Arabia:

Managers / Engineers: 75 Nos.


Supervisory Staff 205 Nos.
(Mechanical, Electrical Trades)
Multi Disciplinary Workers 660 Nos.
Supporting Staff 85 Nos.
-------------
Total 1025 Nos.
 -------------
A - Managers/Engineers
Sl. No. Designation Nos.

A-1 Managers 25
A-2 Quality Engineers 8
A-3 Safety Engineers 8
A-4 Planning Engineers 5
A-5 Design/Auto Cad Engineers 4
A-6 Field/Workshop Engineers 25
Sub-Total 75
B - Supervisory Staff
B-1 Quality Inspectors 8
B-2 Safety Inspectors 7
B-3 Planning Assistants 5
B-4 Field/Workshop Supervisors 28
B-5 Material Management Personnel 7
Sub-Total 55
C - Highly Skilled Technicians:

Sl. No. Designation Nos.

C-1 Pipe Fabricators 17


C-2 Structural Fabricators 19
C-3 H. P. Welders 33
C-4 Mill Wright Fitters 8
C-5 Auto Technician 2
C-6 Rigger Level I 2
C-7 Rigger Level – II 4
C-8 Electrician 5
C-9 Heavy Crane Operators 12

Sub Total 102


D - Skilled Technicians
Sl. No. Designation Nos.

D-1 Crane Operators 62


D-2 Pipe Fitter/Jr. Fitter 42
D-3 Structure Fitter/Jr. Fitter 37
D-4 Structure Welders 25
D-5 Pipe Welders (Tig & Arc) 22
D-6 Riggers L-03 175
D-7 Drivers(HVD) 25
D-8 Sand Blasters 5
D-9 Painters 15
D-10 Scaffolders 15
D-11 Drivers(LVD) 15
D-12 Rotary Equipment Fitter 10
D-13 Helper / Khalasi 190
D-14 Jr. Electrician 6
D-15 Fork Lift Operators 6
Sub -Total 650
E-Supporting Staff

Sl. No. Designation Nos.

E-1 Administration 20
E-2 Finance 8
E-3 Time Keepers 8
E-4 Security 15
E-5 Store 13
E-6 Peon 6
E-7 Sweeper 5
E-8 Cook 4
E-9 Cook Helper 6
Sub-Total 85

F-1 Total no. of Saudi Staff 58

Grand Total 1025


List of Major Maintenance
Shutdown/Turn Around
Executed & In Hand
SIPCHEM
1 Supply & Installation of Steel Structure platform and access Ongoing
staircase
2 Sea Water Pump Installation connection FRP Line Ongoing
3 Fabrication of Liquid Dampers of SS304 material (U-Stamp Ongoing
Vessel) on LSTK Basis
4 Fabrication & Installation of the Internal Bottom Section for Completed
Three Switch Coolers & associated platforms
5 Installation of Man-way Nozzle and other nozzle on different Completed
equipment on ‘R’ Stamp job
6 Dismantling, Fabrication, modification & new erection of Completed
Water Tank & Workshop, & misc structures
SAUDI KAYAN

1 Design, Detailed Engineering, Procurement of Package Ongoing


Boiler FD Fan Turbine Steam Drain Piping System in Utility
Plant
2 Engineering, Fabrication, supply and installation of Completed
Horizontal Movable Tanks of 125 cubic meter for U & O
Plant
SABIC- SAFCO & SADAF
1 Upgradation of SF2 Process Air Compressor 1st & 2nd stage Ongoing
suction lines from CS to SS304
2 Fabrication& Erection pipes for Salt Plant Completed
3 Dismantling, Fabrication & Erection of 16” Dia. Slurry & Completed
Feed water pipe line & Water Tanks.
4 Dismantling, Fabrication, Surface Cleaning, Painting & Completed
Erection of 102” Dia. Elbow & pipes.
5 Dismantling, Repairing & Erection of Flare Tip at 170 Mt. Completed
Height.
6 Dismantling, Fabrication & Erection of Boiler Feed Water Completed
Pipe line & other piping.
7 Dismantling & Re-installation of Heat Exchanger. Completed
8 Dismantling & Re-installation of De-Watering Wheel Completed
SAUDI CHEVRON

1 Fabrication & Erection of 42”, 36”, 32” of Pipes Spools, Completed


pipes with flayer for Seawater
Other Major Construction Projects Under Execution
Sl. Project Scope Location Client
No
1 Sipchem-WCC Mechanical, Piping & Steel Structural Jubail Sipchem-
Project Works GACIC
2 Maaden Cast Structural Erection & Cladding Works Raz Al Khair Bechtel
House (Including material Supply )
3 Maaden Rolling Structural Erection & Cladding Works Raz Al Khair Fluor
Mill
4 Maaden Smelter Silo assembly and erection works & Raz Al Khair Bechtel
Piping Works ( Including Materials )
5 Maaden Port Silo assembly and erection works & Raz Al Khair Bechtel
Piping Works ( Including Materials )
6 CO2 Injection Structure, Equipment & Piping Works Hawaiyah ARAMCO
Project
7 CO2 Injection Structure, Equipment & Piping Works Uthmaniyah ARAMCO
Project
Qualifications
ISO - CERTIFICATION
OHSAS 18001 : 2007 - CERTIFICATION
ASME ‘U’ STAMP CERTIFICATION
National Board ‘R’ STAMP CERTIFICATION
National Board ‘NB’ STAMP CERTIFICATION
Premises & Other Facilities Snap Shots
Erection of Flare
GULF SKY CRANES & CONT. CO. LTD

Dismantling of Flare Spool in SADAF Riyadh PP-9

Erection of Flare

Fabrication of 102” Dia. Elbow Flare Tip Erection in SADAF


Fabrication of Pipe Spools
Fabrication of Pipe Spools for Sea Water at
Chevron
Cleaning, Painting and Erection of 102" Elbow
Pressure Vessels
Shell Rolling & Dish Preparations
Horizontal Movable Tanks for Saudi Kayan, Jubail & Safran,
Belgium
Horizontal Movable Tanks for Saudi Kayan,Jubail & Safran, Belgium
Horizontal Movable Tanks for Saudi Kayan,Jubail & Safran, Belgium
Saudi Kayan Movable Storage Tanks – After
Blasting & Painting
Painting Shop Snapshots
Workshop Snapshots
Ma’aden Projects
Ma’aden Cast House Project
Ma’aden Cast House Project
Ma’aden Rolling Mill Project
Ma’aden Rolling Mill Project
Ma’aden Port Facilities
Ma’aden Port Facilities
Ma’aden GSCC Camp Facilities
Rabigh Power Project
Erection Work at Rabigh Project
Erection Work at Rabigh Project
ALBA, Bahrain
ALBA Project
China Railway,
Royal Commission
China Railway Project
Manifa
Manifa Project
Questions?
Gulf Sky Cranes & Contracting Co. Ltd.

Thank
You

You might also like