Bayu Pinasthika (1200960234) Friska Oktaviana (1200986681)
Bayu Pinasthika (1200960234) Friska Oktaviana (1200986681)
Jalan Tol
Jakarta - Tangerang
Sungai
Pesanggrahan
Tower C
• KSO PT. Pelaksana Jaya Mulia
Owner
• PT. Alam Jaya Perkasa
Construction
• PT. Perentjana Djaja
Management
Architect
• PT. Megatika International
Consultant
Landscape
• PT. Elvolver
Consultant
Design & Built
• PT. Catur Bangun Mandiri
Contractor
Foundation
• PT. Geotechnical Engineering Service
Planner
Structure
• PT. Baganusa Dayaprima
Planner
MEP Planner • PT. Metakom Pranata
Owner
Consultant
Architect KSO PT. Pelaksana Jaya Mulia
PT. Alam Jaya Perkasa
Planning Consultant
Quality
Management
Construction
Time Cost
Production
Erection
Preparation
Move
Installation
Time Back
Topping
Wire Mesh Installation
Concrete Pouring
Area : 18.945 m2
Volume Foundry Plans : 1.326,15 m3
Steel Bar Quality : BJTD 40
Thick : 7 cm
Concrete Quality : K-300 / 24.900 MPa
Concrete Slump : 10 cm ± 2 cm
Thick Concrete Cover : 3 cm
Admixture (Fly Ash) : Maximum 15%
Production Process
Erection : Preparation Process
Erection : Moving Process
Erection : Intallation Process
Erection : Time Back Process
Topping : Preparation Process
Topping : Wire Mesh Installation
Topping : Preparation Concrete Pouring
Topping : Concrete Pouring
Provide personal safety tools such as hats, shoes, work
clothes, etc. for workers and guests.
Provide safety facilities such as barrier for holes, signs,
railings, etc.
Provide fire extinguishers for emergency situation.
Provide first aid include auxiliary equipment,
medicines, etc.
Keep the project clean by provide trash, periodically
dispose off the project, etc.
Check on the tensile strength of steel every material.
Examination of rebar installation before casting.
Testing slump value of concrete before casting.
Testing the value of concrete compressive strength test
every concrete mixer came to the project site.
4 cylinder concrete mold every 1 concrete mixer
1 concrete mixer has a volume 7 m2 and 9 m2.
All activities related to concrete casting is controlled.
Check every concrete curing process.
Physical inspection of the finished concrete.
Unit Price Analysis
Topping Analysis
Concrete (m3)
Pouring Concrete (unit)
Wire Mesh Installation (m2)
Formwork Production (m2)
Formwork Installation (unit)
Price Difference
Efficiency = × 100%
Largest Price
Rp 214.694.981,91−Rp 173.703.491,69
Efficiency = × 100%
Rp 214.694.981,91
Efficiency = 19,091 %
All members of the organization do the work according
to the position.
Construction project use the half slab method because
the cost more efficient.
During the construction period in the field, quality
assurance looks very good.
From the analysis, concrete plate with half slab method
is more efficient until 19,091% than convetional price.
Quantity of workers must be calculated correctly.
Use safety straps should be done when working on the
high level.
Ban on smoking at work must be done properly.
Perform a quality selection of tower crane.
Addition of tower crane because the project has
reached a high level.
Because half slab method is more efficient than
conventional method, then this method can be an
alternative in future projects.
Bayu Pinasthika (1200960234)
Friska Oktaviana (1200986681)