Professional Documents
Culture Documents
8D Project On - Uncut Thread: Product: Men's Short, Line No# 01 (I-2)
8D Project On - Uncut Thread: Product: Men's Short, Line No# 01 (I-2)
8D Project On - Uncut Thread: Product: Men's Short, Line No# 01 (I-2)
PSQA Lead
Factory Lead Mijanur Rahman
Prashant Mithare SPE, PSQA Bangladesh
[Honorable. VP Sir] December ’2017
Define
Issue Charter
Business context:
KDS Garments Industries Ltd. (KDS IDR Ltd) is one of the greatest vendor
of Target Sourcing Services – L. L. C., Chittagong, Bangladesh. Producing
Knit items of Target are in good practice of the facility.
Problems:
Un cut Thread at operations having down the inspection performance.
Goal statement:
Reduce DHU of Un cut Thread from garment at 0% at manufacturing
process by next months .
Scope:
Sewing
Benefit:
Identify Un cut Thread at process and resolve what will bring a good
performance.
2
D1.Team Members ( Name / Business Process)
Project Team:
1. Saimul Islam Production Manager (Project Leader )
2. Abdul Gani Assistant Manager QA (Assistant Project Leader)
3. Gihan Lahiru' Sr. Executive IE (Member)
4. Siddiqur Rahman Sr.Exe QA (Member)
5. Kanchan Production Exe (Member)
6. Alok Barua Jr.Exe QA (Member)
7. Anik Barua Jr.Exe IE (Member)
8. Rubel Islam Technician (Member)
9. Zahirul Islam Jr.Exe QA(Member)
10. Amit Dey Exe I/A (Member)
11. Sajib Biswhangri Jr.Exe (Member)
12. Ariful Islam Jr. Exe MINT (Member)
13. Bellal Line Supervisor (Member)
14. Ruma Line QA ( Member)
3
D2. Problem Descriptions (Defect Description)
4
D2. Problem Descriptions (Defect Description)
5
D2. Problem Descriptions (Defect Description)
Uncut Thread
Month Wk-1 Wk-2 Wk-3 Wk-4
Graphical
6.00% 5.65% 5.19%
4.00% 4.45%
3.30%
2.00% 1.99%
0.00%
Nov Nov Dec Dec Dec Dec Dec
Week-4 Week-5 Week-1 Week-2 Week-3 Week-4 Week-5
6
D3. Interim Corrective Actions/Correction Action Plan
Saimul Islam
Had a meeting with the line
(Production Manager)
supervisor and other teams in
'Kanchan
the line responsible due to 30 Dec 2017
(Exe. Production)
avoid the Uncut thread.
Siddiqur Rahman
(Sr. Exe QA)
7
D4. Root Causes Analysis
8
D5.Chosen permanent corrective action(s)
9
D6. Implement permanent corrective action (s)
Lack of Knife
sharpness
10
D6. Implement permanent corrective action (s)
Lack of awareness
training
Insufficient Lighting at
trimming table
11
D7. Prevent recurrence – Write Result of next lot
12
D7. Prevent recurrence – Write Result of next lot
Back Pocket Barrack To be trimmed by machine. To check in the end line checking
Waist Band attaching to body with over
Operator has to trim the thread. To check in the end line checking
lock
Side Pocket Bar Tacking To trimmed by the machine. To check in the end line checking
Fly Barrack To be trimmed by the machine. To check in the end line checking
Barrack at crotch point To be trimmed by the machine. To check in the end line checking
Bottom Rolling by single needle lock stitch To be trimmed in the process. To check in the end line checking
13
D8. Team Recognitions / Celebrations
Not At Done
14
15