LITERATURE REVIEW OF ADVANTAGES AND DISADVANTAGES
OF PRE-PLANNED CONSTRUCTION PROJECTS
1 3 TH P R E B E M C O N F E R E N C E AM S T E R D AM – 1 OF 6 | M A R C H 2 2 ND 2 0 1 3
THE FACULTY OF ENGINEERING AND SCIENCES
DEPARTMENT FOR MECHANICAL AND MANUFACTURING ENGINEERING
AALBORG UNIVERSITY
RESEARCH
METHOD
• 3 STAGES SEARCH STRING RESEARCH METHOD. THIS IS A
DARKBLUE
INPUT STAGE: CIRCLE
WITH TEXT
• BRAINSTORMING 5 SIMPLE KEYW ORDS.
• BASIC SEARCH AT WEB OF KNOW LEDGE.
• 6 IDENTIFIED KEYW ORDS 9 BASIC SEARCH STRINGS.
• INITIAL SEARCH AT WEB OF KNOWLEDGE.
• 15 IDENTIFIED KEYW ORDS 14 ADVANCED SEARCH STRINGS.
• MAIN SEARCH ON WEB OF KNOWLEDGE, SPRINGERLINK ELSEVIER AND
SCIVERSE.
PROCESSING STAGE:
• EXCLUSION (TITLE), INCLUSION (ABSTRACT).
• SORTED IN A, B AND C PAPERS.
• FORW ARD, BACKWARD SEARCH ON A -PAPERS.
OUTPUT STAGE:
• THEME CATEGORIZE A-PAPERS.
• WRITE THE THEMES.
1 3 TH P R E B E M C O N F E R E N C E AM S T E R D AM – 2 OF 6 | M A R C H 2 2 ND 2 0 1 3
THE FACULTY OF ENGINEERING AND SCIENCES
DEPARTMENT FOR MECHANICAL AND MANUFACTURING ENGINEERING
AALBORG UNIVERSITY
LITTERATURE
REVIEW
THIS IS A
COST AND SCHEDULING INCREASE: DARKBLUE
CIRCLE
• GLOBAL CHALLENGE 5 CONTINENTS, 20 NATIONS. WITH TEXT
PRE-ASSEMBLY CONSTRUCTION:
• MIXED PRE-ASSEMBLED COMPONENTS AND COMPUTER -AIDED DESIGN
• REDUCE TIME AND COST.
• STABLE PROCESSES LESS “FIRE FIGHTING MANAGEMENT”.
1 3 TH P R E B E M C O N F E R E N C E AM S T E R D AM – 3 OF 6 | M A R C H 2 2 ND 2 0 1 3
THE FACULTY OF ENGINEERING AND SCIENCES
DEPARTMENT FOR MECHANICAL AND MANUFACTURING ENGINEERING
AALBORG UNIVERSITY
LITTERATURE
REVIEW
PRODUCTIVITY: THIS IS A
DARKBLUE
• PRODUCTIVITY CALCULATIONS AT MACRO LEVEL IS UNRELIABLE. CIRCLE
WITH TEXT
RISK PLANNING:
• RISK TOOLS ARE A COMBINATION OF POLITICAL, ECONOMIC, SOCIAL,
TECHNOLOGICAL, LEGAL AND ENVIRONMENTAL FACTORS.
• A BUSINESS CULTURE WITH A INDUSTRIAL CONTEXT TO MANAGE RISK.
TECHNOLOGY:
• NO EVIDENCE, CONSTRUCTION IS WORSE / BETTER THAN
MANUFACTURING TO INNOVATE AND PERFORM.
1 3 TH P R E B E M C O N F E R E N C E AM S T E R D AM – 4 OF 6 | M A R C H 2 2 ND 2 0 1 3
THE FACULTY OF ENGINEERING AND SCIENCES
DEPARTMENT FOR MECHANICAL AND MANUFACTURING ENGINEERING
AALBORG UNIVERSITY
DISCUSSION &
CONCLUSION
EXPERIENCE WITH PREPLANNING IN CONSTRUCTIO
T HN
IS P
ISR
A OJECTS
DARKBLUE
CIRCLE
AND PROCESSES. WITH TEXT
1 3 TH P R E B E M C O N F E R E N C E AM S T E R D AM – 6 OF 6 | M A R C H 2 2 ND 2 0 1 3
THE FACULTY OF ENGINEERING AND SCIENCES
DEPARTMENT FOR MECHANICAL AND MANUFACTURING ENGINEERING
AALBORG UNIVERSITY
PH.D. STUDENT JESPER KRANKER LARSEN
FIBIGERSTRÆDE 16, ROOM: 4-114
9220AALBORG EAST, DK
PHONE:(+45) 2112 4764
E-MAIL: JKL@M-TECH.AAU.DK