Electrical Safety and Hazards EEPB 423
Electrical Safety and Hazards EEPB 423
KHAIRUN IZALYDIA BT ABDUL JALIL EP 078835
ABDULLAH FAISAL BIN ZAINURI EP 079363
WAN MOHD SHAHRULFARH BIN WAN SHAMSUDDIN EP 078782
NORSHAHIRA BT KHAIRUDIN EE 078890
NUR AIN BT ABD HAMID EE 078973
CASE STUDY
A ground fault is an
accidental connection
Aluminium pole between a circuit conductor
(aluminum pole) and the
earth (ground)
Employee
The paramedic was taking too much time to arrive to the scene as
the plantation was not equipped with proper emergency exit/road
for this kind of accident.
RECOGNIZE
D S
AR
EVALUATE
Z
HA
CONTROL
RECOGNIZE AND EVALUATE THE HAZARD
●
An aluminum pole used as an
equipment to pluck the palm
Equipmen fruit has no insulator at the
t used to holder
pluck the ●
allowed the current to pass
through the worker’s body,
palm fruit CAUSED the worker
●
Parasite plantstosurrounding
be
electrocuted
Parasite the cable line and palm fruit
plants had caused some troubles
between the for the worker to pluck the
cable line and palm fruit that lead to miss-
palm fruit aim and accidentally cut the
●
The worker himself did
cable
not wear proper
Proper protective equipment
used of such as proper glove and
boot
PPE ●
PPE has its own resistivity
to limit the flow of current
CONTROL THE HAZARD
Provide
Make sure that the equipment with
area of work is safe proper insulated
and clear,. material to reduce
Consult with the risk of hazard
authority that in
charge with the cable
to the user
line before
performing the work
Provide training
and supply PPE
to the worker
EMPLOYER
Wear PPE
CONTROL
provided by THE HAZARD
employer
Follow safety
procedures
given by the
employer
Aware of any
possible hazard
around the working
area and take a
serious safety
EMPLOYEE consideration
SUGGESTED WORKPLAN FOR SAFETY PROCEDURES
To avoid the incident from happen again, a new design of work procedure
should be followed by the workers for their safety
Always work in pairs
Wear personal
with maximum
protective equipment
distance from each
suitable for the job other is 5 meters