Energy Management
Purchase Energy Supplies at the lowest possible price
Benchmarking
Benchmarking is a methodology used to
improve the energy performance of the
building.
Comparison of the building performance to
a standard reference value.
Investigation of the differences between
the standard and existing practices.
Performance Metrics
Energy Metrics (Site)
Energy Metrics
Benchmarking From Case
Study
Electricity Consumption

C o o ling D e g re e D a y s C D D
C o nsum ptio n (kW h)

Electricity Consumption
180,000 350
160,000
300
140,000
250
120,000
100,000 200

80,000 150
60,000
100
40,000
50
20,000
0 0

Consumption
Month CDD
Benchmarking From Case
Study
Natural Gas Consumption
C o nsum ptio n (T he r m s)

Natural Gas Consumption


20,000 700
Consumption

H e a ting D e g re e D a y s, H D D
18,000
HDD 600
16,000
14,000 500
12,000 400
10,000
8,000 300
6,000 200
4,000
100
2,000
0 0

Month
Steps used for Benchmarking.
Building Area (Sq.ft)
Electricity and Natural Gas energy
consumption (atleast 12 months).
Convert kwh into Btu’s. (1kwh = 3412.14
BTU).
Calculate the electricity rate ($/Kwh).
 Calculate Btu/Sq.ft and therms/sq.ft
Calculate Kbtu/sq.ft overall
Calculate $/sq.ft
Annual Usage
Objectives of Energy Audit
Describe the theoretical framework for a building audit
Types of Audit
Preliminary Energy Audit
Preliminary Energy Audit
Establish
Estimate
Set
Identify
Usesa existing
‘Reference
immediate
areas
the
scope
energy
most
or
forfor
easily
Point’.
consumption
more
likely
saving
(especially
available
detailed
and mostin
no/low
study/measurement.
data.
the
easiest
organization.
cost)
areas
improvements/savings.
for attention.
Detailed Energy Audit
Pre-Audit Phase
Conduct a brief awareness program on energy audit
Walk-Through the building
Case Study
Proposed Lighting
Consumption
Formulas Used
KWh Savings = Existing KWh – Proposed
KWh
Annual Cost Savings = Annual Energy
Savings*Electricity Rate.
Total Project Cost = Total Material + Total
Installation Cost
Payback Period = (Total Project Cost – Total
Rebates)/Annual Cost Savings.
Rebate Information
The electric utility of the building is
Consolidated Edison, it is providing the rebates
for replacing existing lighting (Non-LED) to
LED’s
Incentives
2x4 Troffer = $30/fixture
2x2 Troffer = $10/fixture
1x4 Troffer = $15/fixtur
Canopy = $70/fixture
Pole Light = $80/fixture
Wall Lights = $70/fixture
Annual energy and Cost Calculations
Project Summary
Impact on Environment
Energy Saved per year = 221,797. 77/kwh.
This saved energy is equal to 165 metric tons of CO2 emissions.
Greenhouse Gas Emissions (Any one of the Following)
35.3 passenger driven vehicles for an year
404,571 miles driven by an average passenger vehicle.
82 Garbage Trucks of waste recycled instead of landfilled.
CO2 Emissions (Any one of the following)
180,596 pounds of coal burned.
0.9 rail wagons worth of coal burned
18,574 gallons of gasoline consumed.
Carbon is Sequestered by:( any one of the following)
4278 seedlings grown for 10 years.
194 acres of US forests in 1 year.
1.3 acres of US forests preserved from conversion to cropland in 1-year.

You might also like