Professional Documents
Culture Documents
TCM Amd Model: " Prevention Is Better Than Treatment "
TCM Amd Model: " Prevention Is Better Than Treatment "
MODEL
“ Prevention is better than treatment “
BY.
PT.TRUBAINDO COAL MINING
GEOLOGY DEPT 2012 1
OBJECTIVES
Generating integrated AMD model with coal model for ease to mitigation
and execution by both Mine Operation and Mine Plan.
2
AMD SAMPLING METHOD
0.00
Thickness 3 m QA
3.00
Maximal Thickness
Thickness 5 m CS
for samples is 5.00 m
Thickness 4 m
STCY
24.00
3
TCM AMD CLASSIFICATION
NAF 8 UNCERTAIN
7
5
NAG pH
UNCERTAIN 1
PAF
0
-50 -30 -10 10 30 50
NAPP (KgH2SO4/ton)
6
AMD (North Block)
7
AMD Drilling
North Block
Drilling
8
Contour Structure PAF Seam 3000
North Block
9
NAG & NAPP Lab Result Analysis
HOLE ADJUSTED GEOPHYSICAL LOGGING SAMPLE TS NAG pH kg H2SO4/ton Field NAG
SEAM FROM TO THICK LITHO MPA ANC NAPP
NAME FROM TO THICK LITHO CODE % ad overnight to pH 4,5 to Ph 7,0 Type
AMD03 0.00 2.00 2.00 QA AMD03-01 0.00 2.00 2.00 QA 0.04 1.2240 -1.2175 2.442 4.9 - 4.4624 Uncertain
2.00 2.60 0.60 STCY AMD03-02 2.00 5.00 3.00 CSSI 0.08 2.4480 10.9600 -8.512 6.7 - 0.2153 NAF
2.60 3.40 0.80 CSSI AMD03-03 5.00 6.00 1.00 STSY 0.06 1.8360 5.7241 -3.888 7.1 - - NAF
3.40 5.00 1.60 STSY AMD03-04 6.00 6.75 0.75 STCY 0.07 2.1420 11.9205 -9.779 7.1 - - NAF
5.00 6.75 1.75 STCY AMD03-05 6.75 8.00 1.25 SSSI 0.07 2.1420 8.5202 -6.378 7.2 - - NAF
6.75 10.30 3.55 SSSI AMD03-06 9.30 10.30 1.00 SS 0.06 1.8360 0.6089 1.227 5.3 - 1.1737 Uncertain
10.30 11.50 1.20 CS AMD03-07 10.30 11.50 1.20 CS 0.19 5.8140 10.3449 -4.531 6.1 - 1.0759 NAF
11.50 12.60 1.10 CSCB AMD03-08 11.50 12.55 1.05 CSCB 0.29 8.8740 3.2666 5.607 3.0 8.1129 18.3766 PAF
12.60 14.00 1.40 CO 2000 AMD03-09 12.55 13.95 1.40 2000
14.00 14.10 0.10 COSH AMD03-10 13.95 14.50 0.55 COSH/CSCB 2.65 81.0900 -4.5990 85.689 2.2 60.6208 69.7286 PAF
14.10 14.50 0.40 CSCB AMD03-11 14.50 15.00 0.50 CS 1.53 46.8180 -2.4368 49.255 2.4 35.6701 41.4360 PAF
14.50 15.00 0.50 CS AMD03-12 15.00 16.10 1.10 CSSI 1.34 41.0040 0.2434 40.761 2.4 28.3803 33.4691 PAF
15.00 16.50 1.50 CSSI AMD03-13 16.10 18.30 2.20 STCY 0.86 26.3160 8.4167 17.899 2.8 13.8960 20.0611 PAF
16.50 18.50 2.00 STCY AMD03-14 18.30 25.00 6.70 ST 0.68 20.8080 18.0376 2.770 4.4 0.0979 3.0335 PAF
18.50 25.00 6.50 ST AMD03-15 25.00 26.00 1.00 CSSI 0.16 4.8960 21.2920 -16.396 8.0 - - NAF
25.00 26.00 1.00 CSSI AMD03-16 26.00 29.00 3.00 STCY 0.19 5.8140 19.4495 -13.636 7.8 - - NAF
26.00 29.00 3.00 STCY AMD03-17 29.00 29.65 0.65 CSSI 0.40 12.2400 15.2276 -2.988 4.4 0.0980 3.4296 Uncertain
29.00 29.65 0.65 CSSI AMD03-18 29.65 31.70 2.05 ST 0.32 9.7920 23.7419 -13.950 7.4 - - NAF
29.65 31.70 2.05 ST AMD03-19 31.70 37.60 5.90 STSY 0.16 4.8960 62.6468 -57.751 7.6 - - NAF
31.70 37.60 5.90 STSY AMD03-20 37.60 40.00 2.40 ST 0.11 3.3660 20.1899 -16.824 7.9 - - NAF
37.60 40.00 2.40 ST
11
Geological Cross Section
North Block
A A’
12
Soil Sampling Test
Levee Bank P3000 B10 North Block
NAF
PAF
NAF
Field NAG
Mass pH TS NAG pH kg H2SO4/ton
Type
SAMPLE CODE MPA ANC NAPP
overnig to pH to Ph
Sample Sample % ad
ht 4,5 7,0
AMD-Soil-01
8.92 0.09 2.7540 13.9902 -11.236 6.8 <0.1 0.1959 NAF
10.098 10.169
AMD-Soil-02
8.56 0.33 0 4.0356 6.062 3.4 4.0090 2 PAF
AMD-Soil-03 8.66 0.09 2.7540 8.2230 -5.469 7.3 <0.1 <0.1 NAF
14
AMD DRILLING STATUS 2012
Seam 3000
Seam 3800
Seam 4200
Seam 4300
Seam 4500
16
Data NAG Lab Analysis Seam 3800 SB1
17
Data NAG Lab Analysis Seam 4300 SB1
18
Location PAF Seam 3000,3800,4200 &4300
South Block 1
Cross Section PAF SB1
19
Contour Structure PAF Seam 3000,3800 & 4200
SB 1
20
Contour Structure PAF Seam 4300
SB 1
21
PAF OB3000_Roof = 3000_Roof + 1.5m
PAF OB3000_Floor = 3000_Roof
PAF UB3000_Roof = 3000_Floor
PAF UB3000_Floor = 3000_Floor – 8m
PAF OB3800_Roof = 3800_Roof + 6m
PAF OB3800_Floor = 3800_Roof
PAF UB3800_Roof = 3800_Floor
PAF UB3800_Floor = 3800_Floor – 3m 22
PAF OB4200_Roof = 4200_Roof + 2m
PAF OB4200_Floor = 4200_Roof
PAF UB4200_Roof = 4200_Floor
PAF UB4200_Floor = 4200_Floor – 1m
PAF OB4300_Roof = 4300_Roof + 1.5m
PAF OB4300_Floor = 4300_Roof
PAF UB4300_Roof = 4300_Floor
PAF UB4300_Floor = 4300_Floor – 2m 23
A’
A
24
PAF OB 4500
S 4500
PAF UB 4500
25
B B’
26
PAF OB 4500
S 4500
PAF UB 4500
27
For AMD prediction TCM use drilling, sampling, Lab Analysis and monitoring.
AMD model integrated with coal model as well ease to indicate and mitigate.
Need advice for change drilling spacing to 150 x 150 for South Block for more
accurate data.(existing 250 x 250 ).
Necessary for using ABA test for comparison with NAG for data point reference.
28
29