Professional Documents
Culture Documents
Build Plans (Office 2007)
Build Plans (Office 2007)
Build Plans (Office 2007)
A B C
Wall 4
1st Floor / Ground Floor
F
3 4
E
D
1 inch Page 1
Wall 5 Wall 6
4 5 5 1 Roof Supports
• There is no right or wrong angle or
measurements for these.
Wall 1
1
A
1
A
Wall 6
F
5
5 4
Wall 5
1 inch Page 3
Ork Watch Tower – Second Floor
Measurements may vary on your printer
5 5
8 1 1 2 2 3 3 4 4 6
A2 B2 C2 D2 E2 F2
B2
8
D2
2nd Floor Building Base 6 7
H2
H2
G2
G2
7
1 inch Page 4
Second Floor Level
• The Second floor is constructed in the
same manner as the first floor.
1 inch Page 5
Ork Watch Tower – Support Arm
Measurements may vary on your printer
A A A
Support
Base
Support
Base Pt. 2
Underside
Back Edge
SPINE 1
SPINE 2
SPINE 3
B B B
1 inch Page 5
Ork Watch Tower – Support Arm
Measurements may vary on your printer
A Support Arm
A • The three identical spines will be the
main support. They will be touching,
sandwiched at the top, to make the
support arm.
Base Pt. 2
Support Arm
B
B Base Pt. 2
Support Arm Base
1 inch Page 6
Ork Watch Tower – Crows nest
Measurements may vary on your printer
Rope Arm
A B C D E F
A
Support Arm
• Building the crows nest will be
completed just like the other buildings.
Crows
Crows Nest Nest • The rope arm will be glued to the arch
Floor Part 2 Floor Part (A) and used to fasten a climbing rope.
That will be used to “climb” to the crows
1 nest. The two pieces will be glued side by
D side, flush to the end.