Build Plans (Office 2007)

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 8

Ork Watch Tower – First Floor

Measurements may vary on your printer

Wall 1 Wall 2 Wall 3


1 1 2 2 3

A B C

Wall 4
1st Floor / Ground Floor
F

3 4

E
D

1 inch Page 1
Wall 5 Wall 6
4 5 5 1 Roof Supports
• There is no right or wrong angle or
measurements for these.

Ground Floor Level


E F
• Red dashed lines are 3/8 inch (thickness
of a sheet of foam core) from the edge.

• Black Dashed and dotted lines are a


marke for the roof level line. You will need
this to place pieces to support the upper
level and roof.
1st Floor Roof
•You will glue the roof supports to this
line, so that the roof sits flush with the top
of the model on walls 6 and 1. This is
done by pinning and glueing the supports
top edge to the dashed and dotted black
line.
Ground Floor Roof
• The roof is again the same size as the floor, but I cut it on • Any Scrap foam core will be used to add
a slight angle, so the bottom is smaller than the top. This to the outside, to break up a flat smooth
will allow for it to slide on and off of the top. pattern, so keep your small cuttings.
1 inch Page 2
Construction Layout – First Floor
Measurements may vary on your printer

Wall 1
1

A
1

A
Wall 6

1st Floor / Ground Floor


F

F
5

5 4

Wall 5

1 inch Page 3
Ork Watch Tower – Second Floor
Measurements may vary on your printer

5 5

8 1 1 2 2 3 3 4 4 6

A2 B2 C2 D2 E2 F2
B2
8

D2
2nd Floor Building Base 6 7
H2
H2

G2
G2
7

1 inch Page 4
Second Floor Level
• The Second floor is constructed in the
same manner as the first floor.

• The edges are cut to almost a


O
45 angle, this will help join the edges and
2nd Floor Building Roof prevent a lot of trimming. But it is ok if it
is not perfect, it is actually better since it
will look more like an ork built it!

•Below you will see the placement of the


second floor placement on the roof of the
first floor. Roof Supports
• Done the same way as
we did the first floor.

1st Floor Roof 2nd Floor Placement

1 inch Page 5
Ork Watch Tower – Support Arm
Measurements may vary on your printer

A A A

Support
Base

Support
Base Pt. 2

Underside
Back Edge
SPINE 1

SPINE 2

SPINE 3

Crows Nest Crows Nest


Base Base Pt. 2

B B B

1 inch Page 5
Ork Watch Tower – Support Arm
Measurements may vary on your printer

A Support Arm
A • The three identical spines will be the
main support. They will be touching,
sandwiched at the top, to make the
support arm.

• The back edge and underside will be


Yellow arrow indicates pinned and glued along the edge of the
Tower Angle
support arm to close it up. These may be
cut from foam core, however heavy card
stock will be easier to cover the edges.

• The crows nest will be glued on top


when Complete in the same manner as
Hole in Base Pt. 2 the support base.

Base Pt. 2

Support Arm Base 2nd Floor

Support Arm
B
B Base Pt. 2
Support Arm Base

Construction Example for Spine and Base

1 inch Page 6
Ork Watch Tower – Crows nest
Measurements may vary on your printer

Rope Arm

A B C D E F

A
Support Arm
• Building the crows nest will be
completed just like the other buildings.
Crows
Crows Nest Nest • The rope arm will be glued to the arch
Floor Part 2 Floor Part (A) and used to fasten a climbing rope.
That will be used to “climb” to the crows
1 nest. The two pieces will be glued side by
D side, flush to the end.

• The red dotted line indicates the position


where the rope arm will be glued.\

•The black dashed line is where your will


glue the crows nest floor part 1 on the
bottom of the crows nest floor part 2.
Crows Nest
Floor Part 2 •The crows nest can be glued at any angle
(top) on the support arm that you wish.
Remember that the rope should hang to
the second floor.

You might also like