WET PROCESS
DRY PROCESS
Wet PROCESS
• In which waste plastic is directly mixed with
hot bitumen at 160⁰C.
• Mechanical stirrer is required to mix the
material .
• Addition of stabilizers is done and proper
cooling is being required.
• Since it requires bigger plant and more
investments than the DRY PROCESS, wet
process is not used widely.
DRY PROCESS
Specific
2.72 2.75 2.80 2.83 2.86 2.5-3.0
Gravity Test
Water
Absorption 1.70% 1.04% 0.38% Nil Nil Max. 2 %
Test
Los Angeles
Abrasion 18.32% 13.20% 11.24% 9.92% 9.12% Max. 27 %
Test
Test results of bitumen
Flow
Bitumen Stability
PET % Vv Vb VMA VFB Rate
% (Kg)
(mm)
3 5 8.07 10.44 18.52 56.415 1543 4.52
6 5 6.19 10.12 16.31 62 1652 4.65
9 5 5.045 9.79 14.84 66.04 1831 4.67
12 5 3.43 9.54 12.97 73.55 1996 4.74
Marshall Stability Graph
Marshall Stability
2500
2000
1500
1000
500
0
VMA VFB Stability (Kg) Flow Rate (mm)