CICLO DE PERFORACIÓN Y

VOLADURA
CURSO: INGLES TÉCNICO II

ALUMNO: PEREZ SALAZAR, BRAYAM ALCIDES 15160061

DOCENTE: ROSA FLORES


1. DRILLING 2. EXPLOSIVE CHARGING

Jumbo machines are used to drill the The boreholes are charged with
holes where the explosives will be cartridge or bulk explosives, although
charged subsequently. the latter is considered to be more
efficient as it makes the most effective
use of the energy from the blast.
3. BLASTING 4. VENTILATION
The blasting is typically triggered These explotions create toxic gases,
sequentially in order to ensure the which make ventilation a vital step.
optimal fragmentation of the rock, as Adequate ventilation can be
well as to ensure the resulting vibrations
achieved with pressurized jets of air.
do not compromise the integrity of the
surrounding structures.
5. MUCKING & SCALING

It consists of three steps: loading and


hauling the muck, and final transport
out of the worksite. Shovels and
dump trucks specifically designed
to operate underground are used to
carry out this work, alongside
scaling machines that remove
any loosened rock.
6. SUPPORT: SHOTCRETE & BOLTING

Depending on the site’s characteristics,


the tunel support can be either light or
heavy-duty, and combines shotcrete
alongside bolts and steel mesh.
The use of bolts and metal sheets will
normally be dictated by the geo-
mechanic behaviour of the site. Often,
these can be used alongside shotcrete for
greater protection against corrosion.