Annex 17 - Induction Nawara Proj
Annex 17 - Induction Nawara Proj
1
General
Nawara Project is owned by the 50:50 joint venture (JV) of ETAP and OMV
Tunisia.
The Nawara Development project particularly is a key strategic infrastructure
project for Tunisia, enabling the unlocking of South Tunisia’s gas resources
and a substantial part of OMV’s growth story in Tunisia.
2
Project Location
Facilities Location
4
Overview
CPF pre-treated gas is routed to Gas Treatment Plant (GTP), which includes
Liquefied Petroleum Gas (LPG) Facility, in the city of Gabès (Ghannouch
industrial district), on the coast.
Pre-treated gas from Nawara field is transported via a dedicated new 374km
gas pipeline, whilst condensate is exported via 10 km pipeline into the existing
Trapsa oil pipeline.
Product Downstream
CPF 1) Pre- Treated Gas
Process Upstream
Central Processing
1) Well Fluid Facilities 2) Condensate
5
Process Units
7
Specifications
Basis of Design
Feed/Product
9
Start up
START UP
• Well Gathering system first start up may commence once the downstream
systems, CPF plant and export pipeline are ready to receive the well fluid.
• The flowlines and the interconnecting manifolds are not strictly required
to be all ready for start-up. Some of them may be connected and put on
service at later stage provided a proper isolation is guaranteed.
The diagram is based on the temporal sequence of actions to be performed.
Start up cycle
• Maintenance
• Emergency (ESD)
Shutdown
for maintenance
Objectives of maintenance
Objectives of maintenance