COST SAVING 07-06-2018

Saving
Volum Propos
5 Years Negotiat Tool/ Negotiate Saving Impact For
Project Material e/ Supplier ed
Sl.No Part No Part Name Total ed Mould d Impact/ Project life
Name Grade Month Name Price/p
Volume Price/pc Cost Price/pc Month Life time (5
s c
Yr)
MAN-D26
1 1235132 Sleeve SS 304 100 6000 Edoor tubes 259.49 103.50 50000 30000 15599.00 935940.00
FA

MAN-D26
2 1264529 Metal Tubes SS 304 50 3000 Edoor Pipes 438.10 249.47 92000 60000 9431.50 565890.00
FA

MAN-D26
3 1205663 Sleeve SS 304 100 6000 Edoor Pipes 304.43 149.68 106000 70000 15475.00 928500.00
RA

MAN-D26
4 1205661 Wire Mesh SS 304 50 3000 Paras Wires 80.00 32.53 250000 250000 2373.50 142410.00
RA

MAN-D26 Edoor
5 1264530 Flange SS 304 50 3000 699.00 172.06 0 76000 26347.00 1580820.00
RA Pipes/Kewal

GRANT TOTAL 69226.00 4153560.00


This one is part
cost
61
14.6 Datum Position changed from dia 50.8 to
dia 65

14.5